An example of an estimate for a tile pool. An example of an estimate for the installation of a pool
Dear Visitor of our site! The company "KOVAS" is glad to present you its prices for the construction of swimming pools and work on installation, design, installation, assembly, disassembly! We do not hide the cost of the services offered, but on the contrary, we open them to all visitors who are interested in this issue. In order for you to clearly know the budget for the future construction of the pool, we propose to do it, which includes any type of work and a list of the necessary desired equipment. The calculation is made on the basis of the initial technical specifications, which comes from the customer. It takes into account all wishes in terms of shape, size, design, purpose, and the installation of various entertainment systems. Also, many options are calculated for a different price class of equipment.
What structures does our company build and what kind of construction do we carry out? Monolithic concrete, stationary, concrete private pools, overflow bowls, skimmer baths, sports, public, water parks, children, adults, large and small, hydromassage - this is not a complete list offered by us!
In addition to swimming pools, "KOVAS" makes lightweight concrete structures, outbuildings, country houses, performs additional finishing, waterproofing and concrete work. Thanks to our extensive experience and high knowledge of specialists, we will make any order on a turnkey basis in the shortest possible time and at a low price. If you are having difficulty and do not know how to properly build, make, build, make, create, make, execute? - send us your questions, wishes, requests for technical answers. Any request is quickly processed and done! Calculate the cost and offer many options for manufacturing is a free service for each of our clients. On this page, see examples and study the cheap pricing policy for any services.
Estimated cost and prices, three sections for the construction of pools!
Estimated section No. 1. The main works on the construction of swimming pools, low prices for the construction of monolithic structures:
1.1. Excavation of soil manually for the future construction of the pool (digging a foundation pit).
1.2. Digging a pit with the help of special equipment, the price without removal is negotiable.
1.3. Moving soil manually over the site at a distance of up to 100 meters.
1.4. Removal of soil from the construction site using technology (if there is a possibility of an entrance).
1.5. Arrangement of a base for a concrete slab of a bowl made of ASG (sand and gravel mixture).
1.6. Creation of a foundation device for a monolithic concrete slab for a reinforced concrete pool bowl.
1.7. Construction of a skimmer bowl made of monolithic concrete, the cost with reinforcement and formwork depends on the volume.
1.8. Prices for the construction of reinforced concrete overflow basins, the cost includes formwork and the manufacture of a reinforced frame.
1.9. Works on the manufacture of a drainage system.
1.10. Manufacturing (construction) of external waterproofing of a concrete bowl.
1.11. Work on the creation of a heat-insulating layer.
1.12. Leveling concrete walls (plastering work) using special additives.
1.13. Internal membrane waterproofing of a concrete pool with Mapelastic material, price with a reinforced layer.
1.14. Finishing (facing) with PVC film (work with finishing material).
1.15. Concrete bowl cladding with glass mosaic using two-component adhesive and Mapei grout.
1.16. Construction work on finishing (facing) surfaces with tiles, also using Mapei glue and grout (materials).
Estimated section number 1 contains a list of general construction and finishing works for the pool. All numbers are valid at this point in time. Any item from the list is accompanied by a multi-year warranty. It depends not only on the name of the estimated position, but also on the complexity of manufacturing. All monolithic concrete products are made using special compounds and additives. Additive chemicals, additional components for concrete or dry mixes are used by the leading European concern Mapei (Italy). Mapei manufactures two-component adhesives for surface finishing, grouting, membrane-type waterproofing, latex compounds in concrete, chemicals for plastering, hydraulic fillings and so on. In each building, only high-quality materials are used, which have been tested by us and time.
Estimated section number 2. Additional construction and assembly work, the cost of installation, assembly of equipment and technical control:
2.1. Installation, assembly, disassembly, installation of equipment, prices with commissioning.
2.2. Assembly, installation of a hydromassage spa (jacuzzi), installation and first start-up.
2.3. Technical control (supervision) for the construction of the pool and construction works.
2.4. Supervision (technical control) of an installation specialist for assembly, disassembly, installation of systems, equipment and the first start-up.
Estimated section number 2 informs about services related to installation, assembly, installation, revision, technical supervision, commissioning. Each pool equipment requires competent assembly, since the devices and units are connected with electricity. In addition to electricity, there is a concept - hydraulic pressure. All pool systems are connected with special PVC pipes and fittings that can withstand high pressure. In case of incorrect installation, many devices quickly fail, undergo unplanned repairs or replace them with a new unit. All prices for equipment are available on our website in the "Online store" section. How much does it cost to build a pool? - this is set out in a separate quote proposal. Those who want to save money can order the technical control of a specialist over the production.
Estimated section No. 3. Design, calculation of the cost of building a pool, the cost of creating a design and sketches, technical documentation:
3.1. Calculation of the cost of construction, design, decoration, waterproofing, installation of equipment for the pool.
3.2. Drawing up estimate documentation for work and materials.
3.3. Design and sketches, drawing of the bath with reference to the existing room in perspective view (3D image).
3.4. Design (design work) of equipment with placement in the technical room and linking to communications (axonometric drawings).
3.5. Design work (design, production of drawings) for the construction of a bowl with the necessary sections of complex units (3D drawings in perspective).
Estimated section No. 3 publishes the range of services required at the very initial stage of the product's implementation. To understand and correctly weigh the finances, you should calculate the final price for the construction of the pool. Therefore, the calculation and budgeting are done first. After agreeing on the estimate and its approval by the customer, a draft bowl is drawn and equipment is designed. Before starting the design, the design and shape of the bowl are discussed. The design should be tied to the interior of the room or the landscape of the site. Special attention should be paid to the creation of a design sketch, since the design project carries the final image of the future product. The entire list of the estimated section No. 3 is associated with drawings and drawings that are needed for future construction.
So, having studied three unique estimated sections, the picture of the cost of future construction becomes more understandable and transparent. All prices are presented on this page. Any estimate is made from this price calculation. When ordering a turnkey product, you spend the minimum budget for the entire complex. We build quickly, reliably, cheaply, with high quality. Any service performed is accompanied by a long-term guarantee for the work and sale of the necessary equipment. Remember that all swimming pools are not simple, but even complex hydraulic structures that do not tolerate mistakes and fixes! It is better to do it once by a specialized organization on a turnkey basis than to deal with subsequent complex and expensive alterations!
An estimate for the construction of a pool is the calculation of all financial costs for its construction, taking into account the characteristics of a particular project. This document is being developed by the same organization that designs the facility. Its preparation is divided into 6 main stages, namely:
- choice of construction site;
- determination of the type of pool;
- the cost of developing engineering and construction documentation, including drawings;
- the cost of digging a foundation pit and trenches;
- expenses for the main work;
- costs for the improvement of the adjacent territory.
Estimated estimate for the construction of the pool
D | NS | G | |||||
Pool dimensions | 8,00 | 3,00 | 1,50 | ||||
Internal area of the bowl (sq. M.) | 57,00 | Volume (cubic meters) | 36,00 | ||||
Mirror of water (sq. M.) | 24,00 | Perimeter (m.) | 22,00 | ||||
№ | Name | Unit | Qty | Price (Euro) | Amount (Euro) | Photo | |
Disinfection | |||||||
1 | Ultraviolet installation UV-C 15000 (VanErp, Holland) | PCS. | 1 | 354,00 | 354,00 |
|
|
2 | Chemical kit reagents | set | 1 | 250,00 | 250,00 | ||
3 | Dosing station Cl \ pH \ Rx Filtration and heating control ("Akon", Russia) | set | 1 | 1250,00 | 1 250,00 | ||
Total: | 1 854,00 € | ||||||
Filtration | |||||||
4 | Sand filter IML D.450 complete with multi-way valve (IML, Spain) | set | 1 | 550,00 | 550,00 | ||
5 | America pump 8 cc m / h, (IML, Spain) | PCS. | 1 | 330,00 | 330,00 | ||
6 | Quartz sand (bag 25 kg.) | PCS. | 3 | 6,00 | 18,00 | ||
Total: | 898,00 € | ||||||
Heating water | |||||||
7 | Heat exchanger (20 kW) Bowman (UK) | PCS. | 1 | 410,00 | 410,00 | ||
8 | Thermal sensor | PCS. | 1 | 150,00 | 150,00 | ||
9 | Solenoid valve | PCS. | 1 | 115,00 | 115,00 | ||
10 | Circulation pump | PCS. | 1 | 183,00 | 183,00 | ||
11 | Dismountable coupling with external thread 50x1 ½ "(PVC / brass) | PCS. | 2 | 60,00 | 120,00 | ||
12 | Heat exchanger piping kit | set | 1 | 100,00 | 100,00 | ||
Total: | 1 078,00 € | ||||||
Lighting (with white LEDs, mosaic effect) | |||||||
13 | LED lamp Standart (IML, Spain) | PCS. | 2 | 260,00 | 520,00 | ||
14 | Junction box (plastic) | PCS. | 2 | 20,00 | 40,00 | ||
15 | Corrugated hose with connection to a spotlight | PCS. | 2 | 5,50 | 11,00 | ||
16 | Toroidal transformer 130 W | PCS. | 1 | 110,00 | 110,00 | ||
Total: | 681,00 € | ||||||
Embedded elements (plastic) mosaic | |||||||
17 | Swimming pool skimmer | PCS. | 2 | 130,00 | 260,00 | ||
18 | Bottom drain | PCS. | 1 | 40,00 | 40,00 | ||
19 | Water level regulator | PCS. | 1 | 71,00 | 71,00 | ||
20 | Wall water return nozzle | PCS. | 4 | 12,00 | 48,00 | ||
Total: | 419,00 € | ||||||
Optional equipment | |||||||
20 | Staircase, 4 steps (with embedded fittings) Kripsol, Spain | PCS. | 1 | 265,00 | 265,00 |
|
|
21 | Hand vacuum cleaner (included: hose, rod, nozzle, adapter) IML, Spain) | PCS. | 1 | 105,00 | 105,00 | ||
Total: | 370,00 € | ||||||
Counterflow | |||||||
22 | Counterflow 75 cc m / h, complete with front panel (Aquatekhnika, Russia), embedded part, control panel and pump (IML, Spain) | PCS. | 1 | 2400,00 | 2 400,00 | ||
23 | Backflow harness kit | set | 1 | 150,00 | 150,00 | ||
Total: | 2 550,00 € | ||||||
Pipeline accessories | |||||||
24 | Set of pipeline and shut-off and control valves | set | 1 | 1000,00 | 1 000,00 |
|
|
25 | Electrical equipment | set | 1 | 550,00 | 550,00 | ||
Total: | 1 550,00 € | ||||||
Total equipment: | 9 400,00 € | ||||||
Installation of equipment | |||||||
26 | Equipment installation, commissioning | 140 000,00 |
|
||||
27 | Filling of embedded elements with non-shrinking mortar | PCS. | 11 | 1850,00 | 20 350,00 | ||
28 | Transport and overhead costs | 42 000,00 | |||||
Total: | 202,350.00 RUB | ||||||
1. General construction works | |||||||
№ | Name | Unit | Qty | Price, rub.) | Amount (rub.) | ||
Material | |||||||
1 | Armature 12 mm | T. | 2,4 | 32 500,00 | 78 000,00 | ||
2 | Armature 6 mm | T. | 0,2 | 38 000,00 | 7 600,00 | ||
3 | M4000 B30 concrete | cub. m | 18 | 4 950,00 | 89 100,00 | ||
4 | Lumber | cub. m | 6 | 8 900,00 | 53 400,00 | ||
5 | Plywood 18 mm | sq. m | 110 | 765,00 | 84 150,00 | ||
6 | Consumables (nails, electrodes, discs, drills, self-tapping screws, knitting wire, etc.) | set | 1 | 75 000,00 | 75 000,00 | ||
The total cost of building materials is | RUB 387,250.00 | ||||||
Work | |||||||
7 | Installation of the base for the pool | sq. m | 27 | 850,00 | 22 950,00 | ||
8 | The device of the formwork structure of the walls of the pool | sq. m | 130 | 500,00 | 65 000,00 | ||
9 | Pool bottom reinforcement | n.m | 1600 | 50,00 | 80 000,00 | ||
10 | Pool wall reinforcement | n.m | 1460 | 50,00 | 73 000,00 | ||
11 | Pool bottom concreting | cub. m | 8 | 3 550,00 | 28 400,00 | ||
12 | Pool walls concreting | cub. m | 9 | 3 550,00 | 31 950,00 | ||
13 | Dismantling the formwork | set | 1 | 16 000,00 | 16 000,00 | ||
The total cost of construction work is | RUB 317,300.00 | ||||||
Total: | RUB 704,550.00 | ||||||
Expenses | |||||||
14 | Transport and overhead costs (unloading, etc.) | 68 000,00 | |||||
15 | Concrete pump operation | change | 2 | 18 500,00 | 37 000,00 | ||
Total: | RUB 105,000.00 | ||||||
Pool finishing | |||||||
2 leveling the bowl | |||||||
№ | Name | Unit | Qty | Price, rub) | Amount (rub) | ||
Material | |||||||
16 | Assembly mixture (50 kg bag) M150 | PCS. | 65 | 160,00 | 10 400,00 | ||
17 | Assembly mixture (50 kg bag) M300 | PCS. | 45 | 185,00 | 8 325,00 | ||
18 | Anchor mix (50 kg bag) NTs | PCS. | 10 | 995,00 | 9 950,00 | ||
19 | FIX primer (5 l canister) | PCS. | 3 | 1 373,00 | 4 119,00 | ||
20 | "Idrokol", adhesive material (25kg) | PCS. | 3 | 8 485,00 | 25 455,00 | ||
21 | Consumables (plywood, beacons, dowel-nails, etc.) | set | 1 | 9 500,00 | 9 500,00 | ||
RUB 67,749.00 | |||||||
Work | |||||||
22 | Aligning the inside of the bowl | sq. m | 57 | 860,00 | 49 020,00 | ||
23 | Pool side alignment | n.m | 22 | 860,00 | 18 920,00 | ||
RUB 67,940.00 | |||||||
Total: | RUB 135,689.00 | ||||||
3. Waterproofing reinforced concrete pool bowl | |||||||
№ | Name | Unit | Qty | Price, rub) | Amount (rub) | ||
Material | |||||||
24 | Waterproofing composition "Litokol" two-component (set) | PCS. | 7 | 5 320,00 | 37 240,00 | ||
25 | Alkali-resistant fiberglass mesh 5x5 | sq. m | 70 | 78,20 | 5 474,00 | ||
26 | Consumable material | set | 1 | 5 800,00 | 5 800,00 | ||
The total cost of building materials is | RUB 48,514.00 | ||||||
Work | |||||||
27 | Waterproofing the inner surface of the pool bowl in two layers, taking into account the installation of fiberglass reinforcing mesh | sq. m | 68 | 850,00 | 57 800,00 | ||
28 | Waterproofing of embedded elements | PCS. | 10 | 550,00 | 5 500,00 | ||
29 | Swimming pool hydrotesting | 15 000,00 | |||||
The total cost of construction work is | RUB 78,300.00 | ||||||
Total: | RUB 126,814.00 | ||||||
4.Finishing the bowl at the customer's choice | |||||||
№ | Name | Unit | Qty | Price, rub) | Amount (rub) | ||
Material | |||||||
30 | Glue K-55 "Litokol" (dry glue mixture) | PCS. | 5 | 750,00 | 3 750,00 | ||
31 | Latekskol (canister 20L) | PCS. | 2 | 4950,00 | 9 900,00 | ||
32 | Litochrome Starlike - epoxy grout for joints (white, 5 kg bucket) | PCS. | 28 | 3 973,00 | 111 244,00 | ||
33 | Auxiliary material (sponges, grout remover, etc.) | set | 1 | 26 500,00 | 26 500,00 | ||
The total cost of building materials is | RUB 151,394.00 | ||||||
Work | |||||||
34 | Decorating the pool bowl with mosaics | sq. m | 57,0 | 1 750,00 | 99 750,00 | ||
35 | Pool side finishing | n.m | 22,0 | 1 750,00 | 38 500,00 | ||
The total cost of construction work is | RUB 138,250.00 | ||||||
Total: | RUB 289,644.00 | ||||||
Total materials and work for the amount: | RUB 1,564,047.00 | ||||||
Total equipment: | RUB 642,866.00 | ||||||
The rate of 1 euro on 10.10.17 is 68.39 rubles. | |||||||
Total specification: | RUB 2,206,913.00 |
Read more about the stages of developing an estimate for the construction of a pool
Choosing a place to build... At this stage, the cost of earthworks and the supply of communications to the construction site, including the availability of roads, are considered. If the latter are absent, then the delivery of equipment and materials will be difficult. All this will entail additional costs.
Determining the type of pool... They are of two types: superficial and buried. The first ones do not require digging a pit, which makes it possible to save money. Recessed reservoirs are more expensive. When building them, you need to consider the following costs:
- for engineering and survey work and soil research at the site of the future construction site;
- digging a pit.
Expenses for the development of engineering and construction documentation... The more complex the reservoir, the more calculations and drawings will be required. Accordingly, the cost of developing project documentation increases.
What, it would seem, is difficult: to make an estimate for the device of a container suitable for bathing. Meanwhile, this task can cause difficulties even for a professional estimator, especially if he does not have before his eyes a detailed project or a statement with the volume of construction and installation work performed at the same time. After all, there are a significant number of types of pools: indoor and outdoor, reinforced concrete, plastic and film (inflatable). Before making an estimate, you need to decide on the type of building being built. The standard option is to set up a pool in the courtyard of a hotel, private house or, say, a nightclub. To do this, a plastic container with an area of several tens of square meters is installed on a specially prepared waterproofed base. The plastic surface is usually not covered with ceramic tiles, but this does not mean that the work ends there. After carrying out a full range of construction and installation works, the production of plumbing works begins: connecting the pool to the existing water supply system, installing valves, pumps, valves, laying pipelines. Some of the installed plumbing fixtures are powered by electricity, so electrical work will also be included in the estimate for the construction of the pool. In practice, it is often necessary to justify the cost of construction costs made by prices from territorial and federal bases. Consider an example of making an estimate for the device of a swimming pool in the TEPs of the Krasnodar Territory.
An example of an estimate for the installation of a pool
Price code | Type of work | unit of measurement | Unit cost, rub. | TZR, person / hour |
TER01-01-013-08 | Development of soil with loading on a dump truck with a bucket with a capacity of: 0.5 m3 (digging a pit for the construction of a pool) | 1000 m3 | 4228 | 11,41 |
TER01-02-005-01 | Compaction of soil with pneumatic rammers (pool bottom) | 100 m3 | 294 | 12,53 |
TER16-04-002-04 | Laying of polyethylene pipes for water supply systems with a diameter of 40 mm | 100 m pipeline | 2883 | 162,4 |
TER16-05-001-02 | Installation of a valve, gate valve, straight-through valve on a pipeline with a diameter of up to 50 mm | PCS. | 98 | 1,47 |
TER16-06-001-01 | Installation of a water meter unit supplied to the installation site in a block with an input diameter of up to 65 mm | 1 knot | 1850 | 9,52 |
TER16-07-003-04 | Approx. connecting the pool to the existing internal networks of water supply pipelines | 1 inset | 78,55 | 4,46 |
TER16-07-005-01 | Hydraulic testing of pipes of water supply systems with a diameter of up to 50 mm | 100 m pipeline | 98,18 | 5,01 |
TERM37-01-001-05 | Installation of the pool tank (equipment without mechanisms) in an open area, equipment weight up to 1 ton | PCS. | 1457,19 | 36,1 |
TERM37-01-002-05 | Installation of a pool tank (equipment without mechanisms) in a room with a mass of equipment up to 1 ton (when drawing up a meta for an indoor pool) | 1 PC. | 1492,09 | 42,5 |
TERM37-01-036-01 | Testing of mechanisms with an electric drive at idle for 1 hour with an electric motor power of 2 kW approx. commissioning of pool pumps | PCS. | 16,72 | 2 |
TERM37-02-013-01 | Installation of an electric winch without lifting with a pulling force of up to 12.5 kN (1.25 tf) (reserve price when drawing up an estimate for the installation of a pool) | 1 electric winch | 400,2 | 4,58 |
TERM07-04-001-02 | Installation of a vane centrifugal pumping unit weighing up to 0.17 t | 1 PC. | 538,97 | 31,4 |
TERM08-02-146-02 | Laying a cable weighing up to 1 kg per meter with attachment with overhead brackets (powering electrical equipment serving the pool) | 1 PC. | 538,97 | 31,4 |
Please note that in this example of the estimate for the construction of a pool, there are no quantitative parameters that are calculated individually on the basis of design documentation for each construction and installation site.
The project for the device of an indoor pool implies a completely different list of construction and installation works performed: you will not dig inside a building with an excavator, and the requirements for waterproofing in a room with such volumes of water are completely different than in the open air. When constructing indoor pools, a reinforced concrete pit of the required depth can be made, to which all communications and external water supply networks are connected. The standard practice is to decorate with ceramic tiles, in the elite version - a mosaic of iridescent shades. The use of mosaic tiles in adjacent colors to decorate the pool area allows for amazing visual effects. The walls and floor of the room where the indoor pool is located must be protected from mold and mildew. For this, the surface is treated with a special anti-fungal compound and / or covered with porcelain stoneware or tiles. If this is not a sports facility, but a spa or wellness center, a conservatory with tropical plants can be placed near the pool. Of course, this is no longer the business of the estimator, but the interior designer, although in some cases the costs of decoration and landscape design can be summed up in the general estimate of construction costs.
Examples of estimates
Business project for the construction of a tennis court
Drawing up a business plan for the construction of a tennis court, incl. marketing, financial, production plans allow the investor to substantiate the economic efficiency of a business idea.
An example (sample) of an estimate for the installation of an automation and control panel
Estimating the installation of switchboards and control cabinets for the industrial and public sector (industry) allows you to justify the economic costs of electrical work.
An example (sample) of an estimate for the installation of outdoor lighting poles
Drawing up estimates for the installation of lighting poles with lamps, panels and control cabinets and other electrical work will help you understand the algorithm for working with this type of prices.
What business idea to choose for implementation in Krasnodar
There are many business plans on the Internet, some can even be downloaded for free, but the question is: will they help you get rich? Let's talk about how to choose the one that suits you from a variety of business projects.
Examples of estimates for landscaping with different types of landscape objects
Drawing up a local estimate for landscaping and landscaping allows you to justify the actual costs of contractors and landscape organizations for the device of alpine slides and flower beds.
Everyone learned a little, something ...
Are you interested in the development trends of the budgeting industry in the modern conditions of the construction industries? How important are these trends for the choice of the place of training of the future estimator and the quality of the estimates drawn up after graduation? This essay describes the historical prerequisites for the evolution of the estimate business in the context of the current market conditions for the study of the estimate business.
Market research of services for the development of estimate documentation for the city of Krasnodar
Your attention is provided with a meaningful essay on the budgeting industry of the Krasnodar Territory and the city of Krasnodar, which makes it possible to analyze the dynamics of structural changes in the entire construction market.
Business plan for creating a tennis club in Krasnodar (short essay)
One of the behavioral tendencies of the population of large cities, incl. Krasnodar, is the popularization of sports that for a long time before that belonged to the category of elite. A good example is tennis, which is gaining more and more popularity. Let's talk about how to make your own tennis club, school or academy.
An example (sample) of an explanatory note to an architectural project
An explanatory note is drawn up as part of the working documentation within the framework of projects for the construction, reconstruction of real estate objects: industrial and public buildings, residential premises, apartment buildings and cottages.
Drawing up an estimate for the installation and commissioning of an elevator
A local estimate for the installation and commissioning of elevator equipment is drawn up as part of the working or design documentation for the installation of an elevator in residential, industrial and public buildings.