Courses of maintenance of executive documentation in construction. Organization of construction control to ensure the requirements of technical regulations
built by __________________________________________________________________________
(name of construction and installation organization)
and project number)
by the address: _______________________________________________________________________
(city, street, bindings of the initial and final pickets)
1. Characteristics of the gas pipeline (gas inlet)
The length (for input - underground and aboveground sections), diameter, working pressure of the gas pipeline, type of insulating coating of the linear part and welded joints (for underground gas pipelines and gas inlets), number of installed locking devices and
other structures _______________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
2. List of attached certificates, technical passports (or their copies) and other documents certifying the quality of materials and equipment
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
Note. It is allowed to attach (or place in this section) extracts from these documents, certified by the person responsible for the construction of the facility and containing the necessary information (certificate number, brand (type), GOST (TU), dimensions, batch number, manufacturer, date of issue , test results).
3. Data on gas pipeline joint welding
Note. The diagram must be drawn up so that the location of each joint can be found from the surface of the earth. To do this, bindings to permanent ground objects (buildings, structures) of both the gas pipeline itself and its characteristic points (terminals, turning points, etc.) must be made; distances between joints, as well as between joints and characteristic points, including intersected communications, should be plotted. Strict adherence to the scale of the scheme is optional.
4. Checking the depth of the gas pipeline, slopes, beds, devices of cases, wells, carpets (compiled for underground gas pipelines and gas inlets)
It has been established that the depth of the gas pipeline from the ground to the top of the pipe throughout the entire length, the slopes of the gas pipeline, the bed under the pipes, as well as the arrangement of cases, wells, carpets, correspond to the project.
(position, signature, initials, surname)
5. Checking the quality of the protective coating of the underground gas pipeline (gas inlet)
1.* Before laying in a trench, the protective coating of pipes and joints was checked for the absence of mechanical damage and cracks - by external inspection, thickness - by measurement in accordance with GOST 9.602-89 mm: adhesion to steel in accordance with GOST 9.602-89; continuity - flaw detector
2.*Joints isolated in the trench are checked by external inspection for the absence of mechanical damage and cracks.
Item 3 to be deleted
4 * Check for the absence of electrical contact between the metal of the pipe and the soil was made after the trench “___” was completely backfilled on ______________ 200__
Note. * If the trench was backfilled when the ground freezing Shubin was more than 10 cm, then the construction and installation organization must carry out an inspection after the soil thaws, which should be recorded in the act of acceptance of the completed construction of the gas supply system object.
When checking the quality of the protective coating, no defects were found
Laboratory boss ___________________________________________________________
(position, signature, initials, surname)
Representative of the gas industry __________________________________________________
6. Purging the gas pipeline, testing it for strength and tightness
Item 1 should be deleted.
2 "___" ___________ 200__ before the strength test, the gas pipeline was purged with air.
3 * "___" ___________ 200__ produced pneumatic (hydraulic) test
gas pipeline for strength by pressure MPa (kgf / cm 2) with exposure for _____ hours.
The gas pipeline passed the strength test.
4. "___" ___________ 200__, the gas pipeline filled up to the design marks with fittings and branches installed on it to the objects to the shut-off shut-off devices (or the underground part of the gas inlet) was tested for tightness for ____ h
Before the start of the test, the underground gas pipeline was under air pressure for ____ hours to equalize the air temperature in the gas pipeline with the temperature of the soil
Pressure measurements were made with a pressure gauge (differential pressure gauge) according to GOST _______, class.
Data of pressure measurements during testing of an underground gas pipeline
test date |
Pressure measurements, kPa (mm Hg) |
Pressure drop, kPa (mm) |
||||||
month |
number |
clock |
manometric |
barometric |
permissible |
actual |
||
P(1) |
P(2) |
B(1) |
IN 2) |
|||||
According to the data of the above pressure measurements, the underground gas pipeline passed the tightness test, no leaks and defects were found in places accessible for inspection;
"___" ___________ 200__the above-ground gas pipeline (the above-ground part of the gas inlet) was tested for tightness with a pressure of _____ MPa (kgf / cm 2) with exposure for an hour, followed by an external inspection and verification of all welded, threaded and flanged joints. Leaks and defects were not found. The above-ground gas pipeline (the above-ground part of the gas inlet) passed the tightness test.
Foreman of works _____________________________________________________________
(position, signature, initials, surname)
(position, signature, initials, surname)
7. Conclusion
The gas pipeline (gas inlet) was built in accordance with the project developed by
________________________________________________________________________________
(name of design organization
________________________________________________________________________________
and project release date)
taking into account the agreed changes made to the working drawings No. ___ - ___________
Construction started"___" ___________ 200__
Construction completed"___" ___________ 200__
Chief Engineer of SSMU __________________________________________________________
(position, signature, initials, surname)
Representative of the gas industry __________________________________________________
(position, signature, initials, surname)
The course provides a systematic set of practical recommendations for the maintenance of as-built documentation, "run-in" during the implementation of various construction projects, which can significantly reduce production costs.
For whom is it intended
Managers and specialists of construction companies, developers (technical customers), contracting and general contracting organizations, architectural supervision, state construction supervision, foremen, site managers and all interested parties. As well as persons responsible for the operation of buildings and structures or regional operators.
Introduction
The program will cover issues taking into account current legislative and regulatory requirements.
You will receive a systematic set of practical recommendations for maintaining as-built documentation, “run-in” during the implementation of various construction projects.
This System can be considered as an element of anti-crisis management of a construction company, because allows you to significantly reduce production costs by reducing product defects, inconsistencies in document flow and theft at the construction site.
Program
- System of technical regulations in the field of construction. The procedure for the application and execution of regulatory requirements on a mandatory and voluntary basis during the implementation, acceptance and documentation of construction and installation works, finished structures and engineering networks and systems.
- The impact of the quality of executive documentation on the cost of construction; efficiency, profitability, reliability and durability of the operated capital construction object. Examples and possible consequences of not reliable as-built documentation.
- Algorithm of actions, a detailed consideration of the full range of measures to prepare for maintenance, as well as to organize the actual maintenance of high-quality as-built documentation in the regular mode, ensuring a significant minimization of labor, financial and time costs throughout the entire construction process.
- Types, composition, procedure for registration, presentation and storage of executive documentation.
- Practical recommendations for the development of working lists of hidden works and critical structures to be surveyed.
- Practical recommendations for the development of a Program for carrying out planned control measurements, testing of used building materials, finished structures in construction and laboratory conditions, as well as pipelines, engineering systems and equipment.
- Rostechnadzor requirements for the procedure for issuing certificates of survey of hidden works, critical structures and sections of engineering and technical support networks, completed "before" and "after" 03/06/2016, in accordance with the provisions of RD-11-02-2006 and the Order of Rostechnadzor dated 10/26/2015 city No. 428.
- Practical recommendations for the design of executive geodetic schemes and drawings.
- Rules and features of the formation of a commission for the acceptance of hidden works, critical structures and sections of engineering and technical support networks, completed "before" and "after" 03/06/2016, and taking into account the organizational structure of the construction industry and the method of construction. The procedure for vesting members of the commission with appropriate powers.
- Practical recommendations and real examples on the development of various regulatory documents for the execution, presentation and storage of executive documentation.
- Preparation of a package of acceptance documentation for checking the completed construction / reconstruction of the facility and putting it into operation.
- Intermediate acceptance of sections of engineering and technical support networks with subsequent documentation.
- Mandatory requirements of Rostekhnadzor (RD-11-05-2007) and other rules for issuing the General Journal of Work. Features of maintaining special journals (concrete works, welding works, installation works, etc.).
Participants are provided
Working materials, lunches, coffee breaks.
Document upon graduation
Based on the results of the training, students who have successfully passed the final certification under the training program receive a Certificate of advanced training in the amount of 72 hours (License for the right to conduct educational activities dated May 03, 2017 No. 038386, issued by the Moscow Department of Education).
Information for out-of-town clients
Nonresident clients are assisted in booking a hotel for the period of training.
This event can order in a corporate format(training of employees of one company).
Course of Study
"Construction control and quality management in construction"
The course is designed for construction directors and their deputies, chief engineers, investors, developers, customers of the construction and investment process and all interested parties.
By attending this course, you will:
- get acquainted with the legislation of the Russian Federation in the field of construction control and quality management in construction,
- learn about as-built documentation and its purpose in providing an organizational and technological scheme in construction,
- learn to avoid errors in project documentation that lead to financial losses at the construction stage,
- discuss with the teacher the issues of practical organization of production control and contractual work,
- get examples of judicial and arbitration practice,
- learn about typical mistakes in maintaining as-built documentation at the facility and the responsibility of managers and participants for quality and safety
Day 1 .
1. Organizational and legal the procedure for ensuring the quality of manufactured building materials, products, structures, completed construction projects.
- « Technical Regulations on the Safety of Buildings and Structures” – Federal LawNo. 384-FZ of December 30, 2009 Introduction into practice of the list of National Standards and Codes of Practice.
- Decree of the Government of the Russian Federation No. 1047-r dated June 21, 2010.
- Requirements for issuing certificates of admission to types of work that affect the safety of capital construction facilities (Order of the Ministry of Regional Development of December 30, 2010 No. 624, Government Decree No. 207 of March 24, 2011).
- Decree of the Government of the Russian Federation of June 21, 2010 No. 468 “On the procedure for conducting construction control”.
- The Town Planning Code of the Russian Federation, taking into account the changes dated November 28, 2011 No. 337-FZ.
- Federal Law "On Technical Regulation" No. 184-FZ of December 15, 2010;
- Guiding documents of Rostekhnadzor;
- Requirements of regulatory and technical documents;
- Requirements for project documentation;
- National standards and codes of practice (Order of Rostekhregulirovanie dated June 1, 2010 No. 2079, Order of the Government of the Russian Federation dated June 21, 2010 No. 1047-r).
- Composition and procedure for maintaining as-built documentation during construction, reconstruction, overhaul of capital construction projects.
- New requirements for the maintenance of as-built documentation in accordance with Decree of the Government of the Russian Federation of June 21, 2010 No. 468 “On the procedure for conducting construction control”.
- Mandatory requirements of the current SNiPs and SPs for the execution of as-built documentation in the implementation of construction control.
- Experience in automation of as-built technical and technological documentation in construction.
- Normative-legal and normative-technical support of design in the construction of facilities: a review of documents.
- Composition of project documentation sections Composition of design documentation sections and basic requirements for their content (Decree of the Government of the Russian Federation No. 87 of February 16, 2008).
- Review of errors in project documentation leading to financial losses at the construction stage.
Day 2
1. Production control.- Production control of building materials and construction and installation works at all stages of the technological process. Input quality control of building materials.
- Features of relationships with suppliers of building materials, products and structures in modern conditions.
- Methods of quality control of construction and installation works, means of control.
- Acceptance of certain types of work with the execution of the required documents.
- Peculiarities of verification and execution of documentation during incoming quality control of incoming materials, products and structures in modern legal conditions.
- Mechanical and physical methods of quality control of materials and technological process in construction.
- Technology of earthen pile and concrete works, quality assurance of construction.
- Typical technological violations.
- Features of operational quality control of monolithic structures manufactured (erected) in the conditions of a construction site.
- Update of GOSTs for concrete works (GOST-7473-2010 from 01/01/2012).
- Control of welded joints (SNiP 03.01-87).
- Devices and methods of non-destructive testing.
- Types of contracts in construction and their features. The procedure for conducting contract work. Mistakes in the conduct of contract work. Termination of contracts due to violation of standards, regulations, technical conditions, etc. Judicial arbitration practice.
- Changes in the system and structure of state supervisory authorities. Separation of powers between the bodies of Rostekhnadzor and Gosstroynadzor. Changing the status of state construction supervision. eight.
5. Responsibilitymanagers and participants of the investment and construction process for quality and safety.
- Updating articles 9.4 and 9.5 of the Code of Administrative Offenses of the Russian Federation. Changes to the Town Planning Code, strengthening the responsibility of construction participants for inadequate quality and safety (Federal Law No. 337 of November 28, 2011).
7. Issuance of documents.
Courses in NAST are:
- personal manager,
- free transfers,
- study without interruption from work,
- round the clock technical support,
- opportunity to work remotely.
Audience category
Training program
Format
We conduct training remotely throughout Russia. Students do not need to visit the CPE center regularly. For classes you only need:
- a computer;
- Internet connection;
- standard applications for reading files.
Specialists study the documentation in construction on the NAST website. We will open access to your personal account with educational materials within 3 days after paying for the course.
Benefits of distance learning
Timing
The duration of training depends on the educational program. The client can choose a standard curriculum or order a personal program.
A standard course lasts an average of 72 academic hours. To learn the educational material in 2 weeks, you need to study daily for 6-8 hours.
In personal courses on executive documentation, you can:
- reduce the duration of training;
- supplement the program with the necessary disciplines;
- change the number of hours allocated to the development of topics.
Course requirements must be agreed with the manager before the start of classes.
Acquired skills and knowledge
The advanced training program consists of theoretical and practical disciplines. Students learn:
- operational control;
- the procedure for compiling reports on the work done;
- requirements for filling out general and special work logs;
- rules for registration of results of quality control in construction;
- regulatory framework for maintaining executive documentation;
- implementation of intermediate acceptance of sections of engineering and technical support networks.
Issued documents
Graduates of the executive documentation course are issued certificates of advanced training of the established sample.
The document can be obtained:
- at the NAST office;
- "Post of Russia";
- courier service.
We will send a scan of the certificate to the student immediately after the final knowledge test, so that the specialist can confirm the completion of the advanced training course in construction before receiving the original document.
We have kept information on the training of students in the archive for 95 years. At the request of clients, it can generate preparation statistics and restore lost documents.
Frequency of training
Employees in the maintenance of as-built documentation in construction need to improve their skills at least once every 5 years.
Enrollment conditions
Education
The key to the success of any capital (and sometimes temporary) construction to a large extent depends on how well all the necessary documentation was drawn up. According to the current Russian legislation, construction must be carried out in strict accordance with the technical documentation, which includes design, estimate, and executive documentation.
Design and estimate documentation (PDD)- This is one of the main documents that builders have to deal with throughout the entire construction cycle. The design and estimate documentation reveals the essence of the project - it contains information about the construction site and the engineering and technical solutions adopted, makes it possible to understand how, according to what regulations, the construction project was drawn up, includes design calculations, on the basis of which further decisions were made. A PSD set traditionally consists of text and graphic parts. represents a plan of construction costs (in fact, the price of construction), as well as a plan of income that is expected to be received as a result of this construction.
As-built documentation (ID) is drawn up during the construction process. It records the process of construction and installation works (who performed them, from what materials, at what time, at what cost), the conditions for the production of these works, the technical condition of the object (for example, available). In fact, as-built documentation in construction reflects, in fact, the execution of design decisions and construction work and shows the actual state of the object in the process and after its completion. Primary compliance documents and as-built drawings are the types into which the as-built technical documentation is divided. By law, as-built documentation must be kept by the customer or developer, except for those periods when state supervisory authorities conduct inspections.
One of the important components of the as-built documentation package is permits. Obtaining permits in construction means that the process is carried out legitimately and in accordance with the requirements of current legislation.
Specialists in the process of work go through the development of various types of documentation in construction. This is POS (project for the organization of construction), PPR (project for the production of works), PPRk (project for the production of works by cranes), TK (technological maps), POKR (project for the organization of work on overhaul), DED (design and estimate documentation), ID (executive documentation ) and much more. A prerequisite for developers of documentation in construction at present is knowledge of the programs used to automate the process of compiling as-built documentation in construction.
The Interregional Academy of Additional Professional Education in Moscow offers professional retraining courses, as well as advanced training courses in the specialty "Documentation in Construction". Specialists with a specialized secondary or higher education in the field of construction can become students of the courses. For enrollment, you must provide a diploma of graduation from a university or college.
Professional retraining in the specialty "Documentation in construction"
Students will explore a number of questions, including the following:
- Modern Russian legislation in the field of construction, current changes.
- Economics of construction production and evaluation of its effectiveness.
- Innovations and latest technologies in design.
- The procedure for the implementation of state supervision and control in construction.
- Safety requirements in construction.
Course duration varies from 252 to 520 hours. At the end of the training, a final certification is carried out and, in accordance with the results of the certification, state-recognised diploma on completion of a professional retraining course.
Advanced training program in the specialty "Documentation in construction"
The duration of the courses is from 72 to 140 teaching hours. The training program includes a concise summary of the main professional issues and pressing issues of the industry. Passing this course allows students to significantly increase the level of professional competence in a fairly short time and get answers to the most pressing questions in the field of development and approval of documentation in construction. The document that students receive at the end of the training is - standardized certificate of completion of advanced training courses.
Conditions for studying at MADPO courses
- Application for enrollment can be submitted online through the form on the website or by phone.
- Proven distance learning technologies allow you to get additional education without breaking away from family and work affairs.
- The place of residence or age of students cannot be an obstacle to studying at MADPO.
- Each student is engaged in an individually designed schedule and curriculum.
- Access to the electronic portal, where there is a modern electronic library containing all the materials necessary for successful study at MADPO, as well as services for self-examination.
- The cost of training is formed depending on the number of specialties chosen by students and teaching hours.
- Economic security of the Russian Federation Political economic security of the Russian Federation
- Antimonopoly policy, its goals and methods The main direction of the antimonopoly policy of the state is
- What reforms did Witte make briefly
- Okun's law and the theory of "full employment" of the population