A specific list of types of work in construction, design, engineering surveys that can only be carried out by an SRO member - Order 624 of December 30, 2009 determines. The regulatory act was developed by the Ministry of Regional Development in order to determine the standards that must be met by design, construction and repair work that affects the safety of capital construction facilities. The latest revision of Order 624 SRO also defines a list of works that can be performed without obtaining permission.
What works require a permit?
In accordance with regulation, to work requiring permission from the SRO - order 624 of December 30, 2009 includes:
- Engineering survey works:
- work as part of engineering and geodetic surveys;
- work as part of engineering and geological surveys;
- work as part of engineering and hydrometeorological surveys;
- work as part of engineering and environmental surveys;
- work as part of engineering and geotechnical surveys;
- survey of the state of soils of the foundation of buildings and structures.
- SRO decree 624 refers to those affecting the safety of work related to design documentation:
- on the preparation of the scheme planning organization land plot;
- on the preparation of architectural solutions; on the preparation of constructive solutions;
- on the preparation of information about external networks of engineering and technical support, about the list of engineering and technical measures;
- preparation of technological solutions;
- on the development of special sections project documentation;
- on the preparation of projects for the organization of construction, demolition and dismantling of buildings and structures, extension of the service life and conservation;
- on preparation of projects of measures for environmental protection;
- preparation of draft measures to ensure fire safety;
- on the preparation of draft measures to ensure access for people with limited mobility;
- inspection of building structures of buildings and structures;
- on the organization of the preparation of project documentation, attracted by the developer or customer on the basis of an agreement legal entity or an individual entrepreneur (general designer).
- The latest revision of Order 624 of SRO recognizes the following construction, reconstruction and overhaul works as affecting safety:
- geodetic works performed at construction sites;
- preparatory work;
- excavation;
- well construction;
- pile work;
- consolidation of soils;
- installation of concrete and reinforced concrete monolithic structures;
- assembly of precast concrete and reinforced concrete structures;
- drilling and blasting during construction;
- on the device of stone structures;
- installation of metal structures;
- installation of wooden structures;
- protection of building structures, pipelines and equipment (except for trunk and field pipelines);
- roofing;
- facade work;
- arrangement of internal engineering systems and equipment of buildings and structures;
- arrangement of external water supply networks;
- device of external sewerage networks;
- arrangement of external heat supply networks;
- arrangement of external gas supply networks, except for main ones;
- device of external electrical networks and communication lines;
- arrangement of facilities for the use of atomic energy;
- arrangement of objects of the oil and gas industry;
- installation work;
- commissioning works;
- construction of highways and airfields;
- arrangement of railway and tram tracks;
- construction of tunnels, subways;
- arrangement of mine structures;
- construction of bridges, flyovers and overpasses;
- hydraulic engineering works, diving works;
- works related to industrial furnaces and chimneys;
- to implement construction control by a legal entity or individual entrepreneur attracted by the developer or customer on the basis of an agreement.
What works do not need admission
These include objects of individual housing construction, multi-apartment sectional buildings, with no more than 3 floors, with separate exits for sections. And orderletter dated 15.06.2010 No. 24099-RP / 08
Explanations of the Ministry of Regional Development on Order 624
National Association of Builders
123242, Moscow, st. Malaya Gruzinskaya, 3
National Association of Designers
123610 Moscow, Krasnopresnenskaya emb., 12, entrance 3, office 1004v, 1004a
National Association of Surveyors
129090, Moscow, Bolshoy Balkansky per., 20, building 1, 6th floor
Due to numerous requests self-regulatory organizations on the procedure for implementing the order of the Ministry of Regional Development of the Russian Federation dated December 30, 2009 No. 624 “On approval of the List of types of work on engineering surveys, on the preparation of project documentation, on construction, reconstruction, overhaul of capital construction projects that affect the safety of capital construction ”, which will come into effect on July 1, 2010, we explain the following.
From July 1, 2010, the List of types of works that affect the safety of capital construction projects (hereinafter - the List), approved by order of the Ministry of Regional Development of Russia dated December 30, 2009 No. 624 “On approval of the List of types of works on engineering surveys, on the preparation of the design documentation on construction, reconstruction, overhaul of capital construction facilities that affect the safety of capital construction facilities "(hereinafter - Order No. 624). From this date, the List approved by order of the Ministry of Regional Development of Russia dated December 9, 2008 No. 274 "On approval of the List of types of work that affect the safety of capital construction facilities", as well as order of the Ministry of Regional Development of Russia dated October 21, 2009 No. 480 "On amendments to the order of the Ministry of Regional Development of the Russian Federation dated
December 9, 2008 No. 274 "On approval of the List of types of work on engineering surveys, on the preparation of design documentation, on construction, reconstruction, overhaul of capital construction facilities that affect the safety of capital construction facilities."
In accordance with part 9 of article 55.8 of the Urban Planning Code of the Russian Federation (hereinafter referred to as the Code), a certificate of admission to a certain type or types of work that affect the safety of capital construction facilities is issued by a self-regulatory organization (hereinafter referred to as SRO) without limiting the period and territory of its validity ... Thus, the termination of the order of the Ministry of Regional Development of Russia dated December 9, 2008 No. 274 does not formally cancel the validity of the certificates of admission issued in accordance with this order. Organizations and individual entrepreneurs have the right to carry out the work specified in the certificate issued on the basis of the order of the Ministry of Regional Development of Russia dated December 9, 2008 No. 274 and directly provided for by Order No. 624.
At the same time, when implementing Order No. 624 in the practice of public and private customers, commissions for holding tenders and auctions, organizations for conducting state examination of project documentation and the results of engineering surveys, state construction supervision bodies, construction control organizations, law enforcement agencies and other bodies and organizations, it may be difficult to compare the types of work indicated in the certificates issued in accordance with the order of the Ministry of Regional Development of Russia dated December 9, 2008 No. 274, and in the List approved by Order No. 624, since in the latter the types of work are formulated in most cases in a different edition ...
In this regard, from July 1, 2010, in accordance with part 2 of Article 52 of the Code, the Ministry of Regional Development of Russia recommends that persons carrying out engineering surveys, architectural and construction design, construction, reconstruction, overhaul of capital construction facilities, perform the types of work specified in the List approved Order No. 624, only after the specified types of work have been entered into the certificates of admissions issued by the SRO.
In order to implement Order No. 624, SROs must carry out the following actions:
1) holding General Meetings of SRO members;
2) notification of Rostechnadzor about the change in the scope of the SRO and about the adoption of new requirements for the issuance of certificates of admission;
3) amendments to the certificates of admission.
4) obtaining a decision of Rostechnadzor on entering information into state Register on changing the scope of SRO activities in order to confirm on behalf of the state the right to issue certificates of admission in accordance with Order No. 624;
1. Conducting General Meetings of SRO Members
1.1. Determination of the scope of the self-regulatory organization.
In accordance with paragraph 10 of Article 55.10 of the Code, the exclusive competence of the general meeting of SRO members includes determining the list of types of work that affect the safety of capital construction facilities and resolving issues on issuing a certificate of admission to which the SRO belongs to.
In accordance with part 5 of Article 55.5 of the Code, the requirements for the issuance of certificates of admission must be determined in relation to each type of work that affects the safety of capital construction facilities and the resolution of issues on the issuance of a certificate of admission to which general meeting SRO members to the scope of the SRO, or types of such work.
In accordance with part 5 of Article 55.8 of the Code, the SRO can issue certificates of admission to work that affect the safety of capital construction projects, in relation only to types of work, the resolution of issues on issuing a certificate of admission to which is attributed by the general meeting of SRO members to the scope of the SRO ...
Based on the foregoing, without defining the scope of its activities, the SRO does not have the right to approve the requirements for the issuance of certificates and does not have the right to issue certificates for the relevant types of work. At the same time, the scope of the SRO should include all or part of the types of work that are contained in Order No. 624.
When determining the scope of activity, self-regulatory organizations should also pay attention to the fact that Order No. 624 contains a significant number of types of construction work marked with a "*". The specified types of work should be included in the scope of the SRO's activities if the specified work will be performed by SRO members in relation to especially dangerous, technically complex and unique capital construction projects.
The legislation does not restrict SROs in the right to hold General Meetings of their members on the issue of approving new areas of activity in accordance with Order No. 624 before the date the order comes into force. At the same time, the relevant decision of the General Meeting must enter into force no earlier than July 1, 2010 (the date of entry into force of Order No. 624).
1.2. Determination of new requirements for the issuance of certificates of admission to work specified in Order No. 624.
Taking into account the fact that in Order No. 624 there was a change in the types of work, the General Meeting of SRO members must approve new requirements for the issuance of certificates of admission.
The SRO has the right to hold General Meetings of its members and approve new requirements for the issuance of certificates of admission in accordance with Order No. 624 before July 1, 2010 (with the postponed entry into force of the decision of the General Meeting).
It should be borne in mind that the Government of the Russian Federation Resolution No. 48 dated 03.02.2010 established increased requirements for the issuance of certificates of admission in respect of especially dangerous, technically complex and unique facilities.
In addition, Order No. 624 contains a significant number of types of construction work marked with "*", for the performance of which a certificate of admission is required only if the specified work is performed in relation to especially dangerous, technically complex and unique objects, as well as types of work, which, by their content, are applicable only to highly hazardous, technically complex and unique objects.
Thus, if SRO members intend to perform work at especially dangerous, technically complex and unique facilities, as well as at other facilities, then the SRO must accordingly approve the requirements for the issuance of certificates for especially dangerous, technically complex and unique facilities, as well as for other capital construction projects.
2. Notification of Rostechnadzor about the change in the scope of activities of self-regulatory organizations and about the acceptance of the requirements for the issuance of certificates of admission
According to part 14 of Article 55.5 of the Code, decisions made by the general meeting of members of a self-regulatory organization, within a period not later than three days from the date of their adoption, must be sent in electronic and paper form to the supervisory authority for self-regulatory organizations (Rostekhnadzor).
According to clause 3 of part 2 of Article 55.18 of the Code, information on the list of types of work that affect the safety of capital construction projects and the solution of issues on issuing certificates of admission to which the general meeting of members of a self-regulatory organization referred to the scope of activities of a self-regulatory organization, is entered into the state register of self-regulatory organizations ...
In accordance with part 4 of this article, the supervisory body for self-regulatory organizations (Rostekhnadzor) shall enter information about the self-regulatory organization in the state register of self-regulatory organizations within three working days from the day it receives a notification of the members of the self-regulatory organization adopted by the general meeting or the permanent collegial management body of the self-regulatory organization solutions. According to part 7 of this article, entering information into the state register of self-regulatory organizations, changing such information is carried out without charging a fee.
In accordance with part 5 of Article 55.18, if a self-regulatory organization detects a violation of the Code's requirements when it makes decisions, notification of which has been received by the supervisory authority for self-regulatory organizations, this supervisory authority suspends the entry of the relevant information into the state register of self-regulatory organizations and sends to the self-regulatory organization an order to eliminate identified violation. Within ten days from the date of receipt of this order of the supervisory authority for self-regulatory organizations, the self-regulatory organization is obliged to eliminate the detected violation and notify the supervisory authority for self-regulatory organizations about it or appeal this order to the arbitration court.
Considering the above, the SRO has the right to issue certificates of admission to new types of work that affect the safety of capital construction projects, after ten days from the date of the approval by the general meeting of SRO members of the decision to supplement the scope of such an organization with the specified types of work and requirements for issuing certificates of admission to such work. In this case, a corresponding notification must be sent to Rostekhnadzor.
3. Modification of certificates of admission
Amendments to the certificates of admission are carried out in the manner prescribed by parts 10-14 of Article 55.8 of the Code. Part 10 of this article determines that in order to amend the certificate, it is necessary to submit to the SRO an application for amendments. Such an application must be accompanied by documents confirming compliance with the requirements for the issuance of certificates of admission, but only if the SRO member intends to obtain a certificate of admission to other types or types of work that affect the safety of capital construction projects than those which are recorded in the certificate issued in accordance with the order of the Ministry of Regional Development of Russia dated December 9, 2008 No. 274.
In connection with the publication of a new edition of the list of types of work, the concept of "other type or types of work" must be understood as work that is different from those indicated in the certificate of admission not by name, but by the content of the types of work. If the content of the work is the same as already indicated in the certificate in accordance with the previous edition of the list of types of work, then the application does not need to attach documents confirming compliance with the requirements for issuing certificates of admission. In this case, in accordance with part 13 of Article 55.8 of the SRO Code, only an application is subject to verification in order to make a decision on amending the certificate of admission. To establish the conformity of the types of work from the lists approved by orders of the Ministry of Regional Development No. 274 and No. 624, we propose to apply the Table of Compliance of Types of Work (attached).
4. Obtaining a decision of Rostechnadzor on entering information into the state register on changing the scope of SRO activities in order to confirm on behalf of the state the right to issue certificates of admission in accordance with Order No. 624
In order to obtain a decision of Rostechnadzor to amend the decision on entering information into the state register of self-regulatory organizations, confirming the right of a self-regulatory organization to issue certificates of admission in accordance with Order No. 624, a self-regulatory organization must send a corresponding notification to Rostechnadzor in the form established by order of Rostechnadzor dated 10.02 .2009 No. 57 (as amended on 29.01.2010).
Appendix 18 pages
R.Yu. Panov
Approval sheet:
Deputy Minister
…..(signature)
____________
(date)
R.Yu. Panov
And about. director
Department of Regulation
urban planning activities
(signature)
I. V. Mironov
Head of the Design Documentation Examination Department
_____________… .. (signature)
I.A. Sidorov
Correspondence table of types of work assigned by the Ministry of Regional Development of Russia
to work that has an impact on safety
capital construction projects
Types of work according to the List approved by order of the Ministry of Regional Development of Russia dated 12/30/2009
№ 624
Types of work according to the List approved by Order of the Ministry of Regional Development of Russia dated 09.12.2008 No. 274
(as amended by Order No. 480 dated 21.10.2009)
List No. 2
List No. 1
1. Geodetic works performed on construction sites
1.1. Layout work during construction *
1.2. Geodetic control of the accuracy of the geometric parameters of buildings and structures *
2. Preparatory work
2.1. Dismantling (dismantling) of buildings and structures, walls, ceilings, flights of stairs and other structural and related elements or their parts *
2. Works on demolition of buildings and dismantling of structures
2.2. Construction of temporary: roads; sites; engineering networks and structures *
4510214 Arrangement of electric lighting systems for temporary buildings
4510215 Installation of temporary protective fences.
2.3. Construction of crane rail tracks and foundations (supports) of stationary cranes
1. Preparatory work at the construction site
4510223 Construction of crane runways
2.4. Installation and dismantling of inventory external and internal scaffolding, technological garbage chutes *
4510505 Installation and dismantling of inventory external and internal scaffolding
3. Earthwork
3.1. Mechanized soil excavation *
3.2. Soil development and drainage in water management construction
4. Work on the development of excavations, vertical planning
3.3. Development of soil by hydromechanization
3.4. Artificial soil freezing works
13. Works on artificial soil freezing
3.5. Compaction with rollers, compactors or heavy rammers *
9. Works on compaction of soils of natural occurrence and arrangement of soil cushions
4510431 Soil compaction with heavy rammers
4510432 Soil compaction with rollers and soil compactors
3.6. Mechanized loosening and development of permafrost soils
4. Work on the development of excavations, vertical planning
3.7. Works on dewatering, organization of surface runoff and drainage
3. Works on dewatering, organization of surface runoff and drainage
4. Well construction
4.1. Drilling, construction and installation of oil and gas wells
4510551 Construction and installation of oil and gas wells
4510553 Drilling oil and gas wells with testing them for productivity
4.2. Drilling and construction of wells (except for oil and gas wells)
35. Work on the construction of wells
4510550 Well construction works
4510562 Drilling of unloading wells
4510559 Filter head assembly and water pumping.
4.3. Well casing with pipes, pipe extraction, free lowering or lifting of pipes from wells
35. Work on the construction of wells 4510557 Casing of wells with pipes
4510554 Installation of filter casing or freezing pipes and devices
4510555 Installing a filter on a column of riser pipes
4.4. Grouting works
35. Work on the construction of wells
4510556 Cementation of the annulus and under-grouting
4520135 Installation of supports, plugging of wells and shafts
4.5. Construction of mine wells
35. Work on the construction of wells
4510558 Fastening the well with reinforced concrete rings
5. Pile work. Anchoring soils
5.1. Piling works performed from the ground, including in sea and river conditions
5.2. Piling works performed in frozen and permafrost soils
8. Works on the construction of pile foundations, sheet piles, anchors
4520163 Immersion of steel piles in permafrost
5.3. Grillage device
Submission of documents on compliance with the requirements for the issuance of certificates is required
5.4. Installation of driven and bored piles
8. Works on the construction of pile foundations, sheet piles, anchors
4520161 Driving reinforced concrete piles
4520166 Installation of bored piles with well drilling and concrete filling of hollow piles
5.5. Thermal soil strengthening
4510437 Thermal strengthening of soils
5.6. Cementation of sub-bases with injector blocking
12. Works on soil consolidation
4510438 Cementation of sub-bases with injector blocking
5.7. Silicatization and resinization of soils
12. Works on soil consolidation
4510439 Silicatization and resinization of soils
5.8. Work on the construction of structures using the "wall in the ground" method.
11. Work on the construction of structures using the "wall in the ground" method
5.9. Driving and lifting of steel and sheet piles
8. Works on the construction of pile foundations, sheet piles, anchors
4520164 Driving and extracting steel and sheet piles
6. Construction of concrete and reinforced concrete monolithic structures
6.1. Formwork works
14. Concrete works
4510501 Installation of metal mesh formwork
4510503 Installation and disassembly of panel formwork
4510506 Installation and dismantling of wooden scaffolds, piers and formwork
6.2. Reinforcement work
14. Concrete works
4520115 Installation of reinforcement of monolithic reinforced concrete structures
6.3. Installation of monolithic concrete and reinforced concrete structures
14. Concrete works
4520132 Construction of rubble concrete and concrete foundations
4520133 Construction of concrete columns and post supports
4520134 Construction of concrete walls and partitions
4520139 Preparation of concrete and mortars
4520141 Arrangement of reinforced concrete foundations, stops, retaining walls, rack supports
4520146 Construction of reinforced concrete external and internal walls
4520147 Construction of reinforced concrete columns
4520148 Construction of reinforced concrete walls, partitions, ventilation ducts
4520149 Erection of reinforced concrete beams, belts, lintels, roof and roof structures in horizontally sliding formwork
4520152 Reinforcement of building structures with reinforced concrete fittings, clips and embankments
7. Installation of precast concrete and reinforced concrete structures
7.1. Installation of foundations and structures of the underground part of buildings and structures
4520211 Installation of reinforced concrete foundations for columns, frames, supports
7.2. Installation of structural elements of the aboveground part of buildings and structures, including columns, frames, crossbars, trusses, beams, slabs, belts, wall panels and partitions
15. Works on installation of prefabricated reinforced concrete and concrete structures
4520212 Installation of reinforced concrete columns, capitals, frames, posts and rods
4520213 Jumper setting
4520214 Installation of roof beams and trusses
4520215 Installation of external and internal wall panels
4520217 Installation of slabs of loggias, balconies, canopies, cornice slabs, sanitary pallets
4520218 Installation of small reinforced concrete structures (parapets, sinks, window sills)
4520219 Installation of flights of stairs and landings
4520237 Laying beams and girders
4520238 Laying of panels, shells and floor slabs and coverings of one-story and multi-story buildings
7.3. Installation of bulk blocks, including ventilation blocks, elevator shafts and garbage chutes, sanitary cabins
15. Works on installation of prefabricated reinforced concrete and concrete structures
4520216 Installation of volumetric blocks of residential buildings
4520221 Installation of elevator shafts and volumetric elements of bins
4520223 Plumbing installation
4520402 Installation of waste chutes made of asbestos-cement pipes with a diameter of 400 mm with inlet valves
8. Drilling and blasting during construction
7. Blasting operations
9. Work on the device of stone structures
9.1. Construction of buildings and structures made of natural and artificial stones, including cladding *
20. Work on the device of stone structures
4520301 Laying of foundations, basement walls, retaining walls, laying of workings with rubble stone
4520302 Ceramic stone wall masonry
4520304 Laying of limestone structures with facing bricks
4520213 Jumper setting
4520406 Installation of partitions made of piece plaster and lightweight concrete slabs
9.2. Construction of brick structures, including those with cladding *
4520306 Masonry brick pillars, arches, gazebos, porticos and other structures made of ordinary bricks
4520307 Brick masonry walls made of ordinary clay and sand-lime brick with facing with ceramic bricks
4520308 Brick wall masonry and facing with ceramic tiles
4520309 Installation of partitions made of bricks and ceramic stones
9.3. Installation of heating furnaces and hearths *
20. Work on the device of stone structures
4520305 Brick masonry of channels, pits, furnaces, hearths, chimneys with cuts
10. Installation of metal structures
10.1. Installation, strengthening and dismantling of structural elements and enclosing structures of buildings and structures
4520101 Installation of frame structures for buildings and structures
4520104 Installation of prefabricated buildings from three-layer aluminum panels
4520107 Installation of lightweight roof structures
4520108 Installation of structures of gates, stairs, platforms, doors, hatches, manholes
4520111 Installation of window blocks, stained-glass windows, partitions (from aluminum alloys, steel and others)
4520112 Construction of buildings from blockboxes
4520113 Installation of steel superstructures with assembly and movement
4520116 Installation of metal stair rails
4520127 Sheathing of walls and roofing with profiled iron or prefabricated panels
4520128 Fastening of building structures with building clips, bolts, rings
19. Works on installation of walls made of SANDWICH panels and sheet assemblies
10.2. Installation, strengthening and dismantling of transport gallery structures
Submission of documents on compliance with the requirements for the issuance of certificates is required
10.3. Installation, strengthening and dismantling of tank structures
Submission of documents on compliance with the requirements for the issuance of certificates is required
10.4. Installation, strengthening and dismantling of mast structures, towers, exhaust pipes
16. Works on the installation of metal structures
4520109 Installation of open structures, switchgears, floodlight masts, antenna systems, waveguide bridges with supports
10.5. Installation, strengthening and dismantling of technological structures
Submission of documents on compliance with the requirements for the issuance of certificates is required
10.6. Installation and dismantling of cable bearing structures (stretch marks, cable-stayed structures, etc.)
Submission of documents on compliance with the requirements for the issuance of certificates is required
11. Installation of wooden structures
11.1. Installation, strengthening and dismantling of structural elements and enclosing structures of buildings and structures, including those of glued structures *
11.2. Assembly of residential and public buildings from factory-made parts of a complete delivery *
17. Works on the installation of wooden structures
12. Protection of building structures, pipelines and equipment (except for main and field pipelines)
12.1. Lining works
4540153 Surface lining with carbon and graphite blocks
12.2. Masonry made of acid-resistant bricks and shaped acid-resistant ceramic products
25. Works on anti-corrosion protection of building structures and equipment
4540151 Acid-resistant brick, stone, andesite masonry
4540152 Coating of floors and lining of surfaces with acid-resistant bricks
4540154 Lining of surfaces with acid-resistant plates
12.3. Protective coating with paints and varnishes *
25. Works on anti-corrosion protection of building structures and equipment
4540161 Painting surfaces with varnishes, paints, enamels
12.4. Rubber coating (lining with sheet rubber and liquid rubber compounds)
25. Works on anti-corrosion protection of building structures and equipment
4540155 Covering and pasting of equipment surfaces with rubber, plastics, sealants, roll materials
12.5. Papered insulation device
4540107 Device for gluing waterproofing
12.6. Arrangement of metallization coatings
25. Works on anti-corrosion protection of building structures and equipment
4540157 Electrometallization of surfaces with zinc, aluminum, nichrome and stainless wire
12.7. Application of topcoat when installing a monolithic floor in rooms with aggressive environments
Submission of documents on compliance with the requirements for the issuance of certificates is required
12.8. Antiseptic treatment of wooden structures
25. Works on anti-corrosion protection of building structures and equipment
4540164 Antiseptic treatment of wooden structures of buildings
12.9. Waterproofing of building structures
24. Waterproofing of building structures
12.10. Works on thermal insulation of buildings, building structures and equipment
12.11. Pipeline insulation works *
26. Works on thermal insulation of building structures, pipelines and equipment
4540146 Coating the surface of pipeline insulation with asbestos-cement casings, glass cement, fiberglass, fiberglass
4540147 Coating the surface of pipeline insulation with sheet metal or aluminum corrugated sheets
4540148 Coating the surface of pipeline insulation, wrapping and pasting insulation with films, fabrics, roll materials
12.12. Works on fire protection of building structures and equipment
Submission of documents on compliance with the requirements for the issuance of certificates is required
13. Roofing device
13.1. Installation of roofs made of piece and sheet materials *
4540121 Installation of asbestos-cement roofs
4540122 Tile roofing with battens
4540125 Installation of small roofing and lining on facades made of roofing iron
4540126 Installation of gutters with overhangs and roof rails
4540127 Base priming and vapor barrier device
13.2. Roofing from roll materials *
23. Roofing works
4540123 Roll roofing device
13.3. Self-leveling roofing *
23. Roofing works
4540124 Installation of roofs made of bitumen mastic with glass mesh or fiberglass
14. Facade work
14.1. Surface cladding with natural and artificial stones and linear shaped stones *
4520307 Brickwork of walls made of ordinary clay and sand-lime bricks, facing with ceramic bricks;
4520308 Brickwork for walls and facing with ceramic slabs;
4520304 Limestone structures masonry with facing bricks.
14.2. Ventilated facades *
19. Works on installation of walls made of SANDWICH panels and sheet-by-sheet assembly;
4520127 Sheathing of walls and roofing with profile iron or prefabricated panels.
15. Arrangement of internal engineering systems and equipment of buildings and structures
15.1. Installation and dismantling of the water supply and sewerage system *
4530201 Installation of valves, gate valves, check valves, taps and mixers on internal networks
4530202 Installation of safety, intake, pressure reducing valves
4530204 Assembly and installation of valve assemblies and linear valves
4530221 Installation of water metering units
4530469 Cut-in and connection of pipelines into existing pipelines.
15.2. Installation and dismantling of the heating system *
27. Works on the arrangement of internal engineering systems and equipment
4530224 Installation of water heaters and boilers
4530225 Installation of high-speed and capacitive water heaters
4530226 Installation of steam and water distribution combs made of steel pipes
4530229 Installation of steel pipe air collectors and air vents and hydraulic seals
4530231 Installation of elevator units
4530232 Installation of indicating devices (manometers, thermometers, level indicators, air taps)
4530246 Installation of heating cast iron sectional steam boilers
4530247 Installation of centrifugal pumps with piping
4530245 Installation of heating hot water and steam water boilers
4530451-4530464 Laying of pipelines
4530465 Installation of filters, water and oil separators when laying pipelines
15.3. Installation and dismantling of the gas supply system
27. Works on the arrangement of internal engineering systems and equipment
4530233 Installation of gas stoves
4530234 Installation of gas burners
15.4. Installation and dismantling of ventilation and air conditioning systems *
27. Works on the arrangement of internal engineering systems and equipment
4530235 Installation of pressure regulators and reduction
4530239 Installation of filters, scrubbers, cyclones
4530241 Installation of air heaters and air heaters
4530243 Installation of fans and ventilation units
4530244 Installation of supply irrigation chambers, maintenance, leveling, recirculation
15.5. Power supply system device *
27. Works on the arrangement of internal engineering systems and equipment
4530271 Installation of electrical wiring in apartments of residential buildings
4530272 Laying distribution networks in basements, attics, stairwells
4530274 Routing cables with wire rope or clamps
4530275 Tightening and wiring
4530276 Installation of an input-distribution device
4530277 Installation of risers in finished ducts on floors with installation of shields
4530278 Installation of light shields
4530279 Installation of electric stoves
Suspension of fastening of feeders on intermediate, corner and anchor bases
4530295 Installation of a lightning rod, cable platform, hatches, steps, a control-breaking point on the supports and roofs of buildings
15.6. Installation of electrical and other control networks for life support systems of buildings and structures *
27. Works on the arrangement of internal engineering systems and equipment
4530467 Installation of embedded and selected devices for automation systems, fire extinguishing installations, equipment for grease systems
4530634 Installation of short-circuits, disconnectors, switches, arresters for voltages up to 750 kV
4530637 Installation of knife switches, switches, air breakers, plug-in devices
4530638 Installation of distribution and lighting shields, terminal boxes and illuminators
4530639 Installation of single-row and double-row panels
4530642 Installation of ballast and guide equipment
4530643 Installing rechargeable batteries, alkaline batteries with charging
4530644 Installation of electric heaters
4530646 Installing insulators
16. Arrangement of external water supply networks
16.1. Laying of water pipelines
4530173 Laying of pipelines from reinforced concrete pressure pipes
4530175 Laying of pipelines from asbestos-cement pressure pipes
4530176 Laying of pipelines from cast iron pressure pipes
4530177 Laying of pipelines from steel pipes with the installation of hydraulic valves, bypasses, candles
4530179 Laying channelless steel pipelines with anti-corrosion, reinforced concrete and bitumen-perlite insulation
4530181 Laying channelless pipelines from polyethylene pipes
16.2. Installation and dismantling of valves and equipment for water supply networks
28. Works on installation of external engineering networks and communications
4530466 Installation of shut-off valves
29. Work on the installation of technological equipment
4530466 Installation of shut-off valves
16.3. Arrangement of water wells, heads, catchment absorbers
28. Works on installation of external engineering networks and communications
4530113 Installation of water supply wells, heads, drainage damper
16.4. Cavity cleaning and testing of water pipelines
28. Works on installation of external engineering networks and communications
17. Arrangement of external sewerage networks
17.1. Laying of free-flow sewer pipelines
28. Works on installation of external engineering networks and communications
4530177-4530181 Pipe laying
17.2. Laying of sewer pressure pipelines
28. Works on installation of external engineering networks and communications
4530173-176; 4530191, 4530193-4530194 Pipe laying
17.3. Installation and dismantling of valves and equipment for sewer networks
4530466 Installation of shut-off valves
17.4. Construction of sewerage and drainage wells
28. Works on installation of external engineering networks and communications
4530111 Construction of water supply, sewerage and drainage wells
17.5. Arrangement of a filtering base for sludge platforms and filtration fields
Submission of documents on compliance with the requirements for the issuance of certificates is required
17.6. Laying drainage pipes at sludge sites
Submission of documents on compliance with the requirements for the issuance of certificates is required
17.7. Cavity cleaning and testing of sewer pipelines
28. Works on installation of external engineering networks and communications
4530187 Test of pipelines for strength and tightness with flushing and installation of glands
18. Arrangement of external heat supply networks
18.1. Laying of heat supply pipelines with a coolant temperature of up to 115 degrees Celsius
Submission of documents on compliance with the requirements for the issuance of certificates is required
18.2. Laying heat supply pipelines with a coolant temperature of 115 degrees Celsius and above
Submission of documents on compliance with the requirements for the issuance of certificates is required
18.3. Installation and dismantling of valves and equipment for heat supply networks
29. Work on the installation of technological equipment
4530466 Installation of shut-off valves
18.4. Installation of wells and chambers of heat supply networks
Submission of documents on compliance with the requirements for the issuance of certificates is required
18.5. Cavity cleaning and testing of heating pipelines
28. Works on installation of external engineering networks and communications
4530187 Test of pipelines for strength and tightness with flushing and installation of glands
19. Arrangement of external gas supply networks, except for main ones
19.1. Laying gas pipelines with a working pressure of up to 0.005 MPa inclusive
Submission of documents on compliance with the requirements for the issuance of certificates is required
19.2. Laying gas pipelines with a working pressure from 0.005 MPa to 0.3 MPa inclusive
Submission of documents on compliance with the requirements for the issuance of certificates is required
19.3. Laying gas pipelines with operating pressure from 0.3 MPa to 1.2 MPa inclusive (for natural gas), up to 1.6 MPa inclusive (for liquefied petroleum gas)
Submission of documents on compliance with the requirements for the issuance of certificates is required
19.4. Installation of condensate collectors, hydraulic locks and expansion joints on gas pipelines
Submission of documents on compliance with the requirements for the issuance of certificates is required
19.5. Installation and dismantling of gas control points and installations
Submission of documents on compliance with the requirements for the issuance of certificates is required
19.6. Installation and dismantling of tank and group cylinder installations of liquefied gas
Submission of documents on compliance with the requirements for the issuance of certificates is required
19.7. Putting a gas pipeline into buildings and structures
Submission of documents on compliance with the requirements for the issuance of certificates is required
19.8. Installation and dismantling of gas equipment for consumers using natural and liquefied gas
Submission of documents on compliance with the requirements for the issuance of certificates is required
19.9. Tapping under pressure into existing gas pipelines, disconnecting and plugging under pressure of existing gas pipelines
28. Works on installation of external engineering networks and communications
4530469 Tie-in and connection of pipelines into existing pipelines
19.10. Cavity cleaning and testing of gas lines
Submission of documents on compliance with the requirements for the issuance of certificates is required
20. Installation of external electrical networks
20.1. Arrangement of power supply networks with voltage up to 1 kV inclusive *
Submission of documents on compliance with the requirements for the issuance of certificates is required
20.2. Arrangement of power supply networks with voltage up to 35 kV inclusive
Submission of documents on compliance with the requirements for the issuance of certificates is required
20.3. Arrangement of power supply networks with voltage up to 330 kV inclusive
Submission of documents on compliance with the requirements for the issuance of certificates is required
20.4. Installation of power supply networks with a voltage of more than 330 kV
Submission of documents on compliance with the requirements for the issuance of certificates is required
20.5. Installation and dismantling of supports for overhead power lines up to 35 kV
28. Works on installation of external engineering networks and communications
4530128 Installation of poles for 0.4-35 kV overhead power lines and industrial electric transport, wooden communication and radio lines
4530129 Installation of poles for 0.4-35 kV overhead power lines and industrial electric transport, communication lines and radioactive reinforced concrete
20.6. Installation and dismantling of supports for overhead power lines with voltage up to 500 kV
28. Works on installation of external engineering networks and communications
4530125 Installation of poles for power transmission lines 35-750 kV for feeder lines and automatic blocking lines for wooden
20.7. Installation and dismantling of supports for overhead power lines with a voltage of more than 500 kV
28. Works on installation of external engineering networks and communications
4530126 Installation of poles for power transmission lines 35-750 kV for feeder lines and auto-blocking lines of reinforced concrete
4530127 Installation of poles for power transmission lines 35-750 kV radio masts and steel radio towers
20.8. Installation and dismantling of wires and lightning protection cables of overhead power lines with voltage up to 35 kV inclusive
28. Works on installation of external engineering networks and communications
20.9. Installation and dismantling of wires and lightning protection cables of overhead power lines with voltage over 35 kV
28. Works on installation of external engineering networks and communications
4530151 Suspension of wires of power lines and contact lines
4530152 Suspension of lightning protection cables
20.10. Installation and dismantling of transformer substations and linear electrical equipment with voltage up to 35 kV inclusive
29. Work on the installation of technological equipment
20.11. Installation and dismantling of transformer substations and linear electrical equipment with voltage over 35 kV
29. Work on the installation of technological equipment
4530631 Installation of power transformers and substation kits
20.12. Installation of switchgears, switching equipment, protection devices
28. Works on installation of external engineering networks and communications
4530154 Installation of disconnectors, arresters, switches on supports of overhead lines and switchgear structures
21. Arrangement of external communication lines, including telephone, radio and television *
Submission of documents on compliance with the requirements for the issuance of certificates is required
22. Arrangement of objects of the oil and gas industry
22.1. Installation of main and field pipelines
Submission of documents on compliance with the requirements for the issuance of certificates is required
22.2. Works on the arrangement of facilities for the preparation of oil and gas for transport
Submission of documents on compliance with the requirements for the issuance of certificates is required
22.3. Arrangement of oil depots and gas storage facilities
Submission of documents on compliance with the requirements for issuance of certificates is required
22.4. Arrangement of crossings under linear objects (roads and railways) and other obstacles of natural and artificial origin
Submission of documents on compliance with the requirements for the issuance of certificates is required
22.5. Work on the construction of crossings using directional drilling
Submission of documents on compliance with the requirements for the issuance of certificates is required
22.6. Device for electrochemical protection of pipelines
Submission of documents on compliance with the requirements for the issuance of certificates is required
22.7. Tapping under pressure into existing main and field pipelines, disconnecting and plugging under pressure of existing main and field pipelines
Submission of documents on compliance with the requirements for the issuance of certificates is required
22.8. Implementation of anti-corrosion protection and insulation works in relation to main and field pipelines
Submission of documents on compliance with the requirements for the issuance of certificates is required
22.9. Works on the arrangement of oil and gas fields of the sea shelf
Submission of documents on compliance with the requirements for the issuance of certificates is required
22.10. Works on the construction of gas filling compressor stations
Submission of documents on compliance with the requirements for the issuance of certificates is required
22.11. Quality control of welded joints and their insulation
Submission of documents on compliance with the requirements for the issuance of certificates is required
22.12. Cavity cleaning and testing of main and field pipelines
Submission of documents on compliance with the requirements for the issuance of certificates is required
23. Installation work
23.1. Installation of handling equipment
29. Work on the installation of technological equipment
4530421 Installation of cranes
4530422 Installation of conveyors, belt, carriage, roller tables, conveyors, bucket elevators, elevators
4530426 Installation of ropeway equipment with tests
4530428 Installation of elevators, lifting platforms, flat-cup lifts, mine stands, loading and unloading devices
4530751 Installation of escalators
23.2. Installation of elevators
14. Concrete works
4520118 Installation of anchor bolts and embedded parts
29. Work on the installation of technological equipment
4530423 Installation of lifting and handling equipment units
4530425 Installation of chains, transition sections, ropes
4530427 Installation of safety netting
4530428 Installation of elevators, lifting platforms, flat-top lifts, mine stands, loading and unloading devices
4530429 Installation of winches and lifting and traction machines
4530641 Installation of cabinets, consoles, racks and input-distribution devices
4530645 Installation of electrical appliances
4530651 Installation of earthing switches
4530652 Installation of lamps
4530658 Laying of internal wiring
4530783 Installations of equipment for operational monitoring and control, collection and transmission of initial information
23.3. Installation of equipment for thermal power plants
29. Work on the installation of technological equipment
4530300 Installation of equipment for thermal power plants
23.4. Installation of boiler equipment
Submission of documents on compliance with the requirements for the issuance of certificates is required
23.5. Installation of compressor units, pumps and fans *
29. Work on the installation of technological equipment
4530670 Installation of compressor machines, pumps and fans
4530671 Installation of piston, centrifugal compressor units and expanders
4530672 Installation of ventilation equipment
4530673 Installation of general purpose pumping units
23.6. Installation of electrical installations, equipment, automation and signaling systems *
29. Work on the installation of technological equipment
4530630 Installation of electrical installations
4530753 Installation of communication equipment for mines and railway transport
4530761 Installation of electrical alarm, fire, ringing and remote signaling equipment with blocking surfaces
4530780 Installation of devices, automation and computer technology
4530781 Instrument installation
4530782 Installation of indicators, sensors, signaling devices of various parameters
4530783 Installation of equipment for operational monitoring and control, collection and transmission of initial information
4530785 Installation of panels, boards, tripods, consoles
23.7. Installation of equipment for nuclear power plants
29. Work on the installation of technological equipment
4530310 Installation of equipment for nuclear power plants
23.8. Installation of equipment for cleaning and preparation for transportation of gas and oil
29. Work on the installation of technological equipment
4530700 Installation of equipment for gas cleaning
4530701 Installation of equipment for electrical and mechanical gas cleaning
23.9. Installation of equipment for oil and gas pumping stations and for other product pipelines
Submission of documents on compliance with the requirements for the issuance of certificates is required
23.10. Installation of equipment for liquefaction of natural gas
Submission of documents on compliance with the requirements for the issuance of certificates is required
23.11. Installation of equipment for filling stations
Submission of documents on compliance with the requirements for the issuance of certificates is required
23.12. Installation of equipment for ferrous metallurgy enterprises
29. Work on the installation of technological equipment
4530370 Installation of equipment for ferrous metallurgy enterprises
23.13. Installation of equipment for non-ferrous metallurgy enterprises
29. Work on the installation of technological equipment
4530380 Installation of equipment for non-ferrous metallurgy enterprises
23.14. Installation of equipment for the chemical and oil refining industry
29. Work on the installation of technological equipment
4530350 Installation of equipment for chemical and oil refining industries
23.15. Installation of mining and mining equipment
Submission of documents on compliance with the requirements for the issuance of certificates is required
23.16. Installation of equipment for railway infrastructure facilities
29. Work on the installation of technological equipment
4530730 Installation of signaling, centralization and blocking equipment on railway transport
4530733 Installation of equipment for mechanization, automation of hump humps and pneumatic mail
23.17. Installation of equipment for subways and tunnels
29. Work on the installation of technological equipment
4530750 Installation of equipment for subways and tunnels
23.18. Installation of equipment for hydroelectric power stations and other hydraulic structures
29. Work on the installation of technological equipment
4530320 Installation of equipment for hydroelectric power stations and hydraulic structures
23.19. Installation of equipment for enterprises of the electrical industry
29. Work on the installation of technological equipment
4530620 Installation of equipment for enterprises of the electrical industry
23.20. Installation of equipment for enterprises of the building materials industry
29. Work on the installation of technological equipment
4530470 Installation of equipment for enterprises of the building materials industry
4530475 Installation of equipment for the production of asbestos-cement products
4530476 Installation of equipment for the production of bricks, tiles, ceramic products, cinder blocks and slag granulation
4530477 Installation of equipment for the production of gypsum and plaster products
4530478 Installation of equipment for the extraction and processing of facing stone
4530481 Installation of equipment for the production of reinforced concrete products and products from aerated concrete
4530484 Installation of equipment for the production of reed products, particle boards
23.21. Installation of equipment for the pulp and paper industry
29. Work on the installation of technological equipment
4530490 Installation of equipment for the pulp and paper industry
4530491 Installation of equipment for the preparation of raw materials for processing, for the production of cellulose and semi-cellulose
4530492 Installation of equipment for the production of paper, cardboard, market pulp and marketable wood pulp
4530493 Installation of equipment for processing paper and cardboard into products, for cutting, sorting, packaging and transportation of paper, cardboard and cellulose
23.22. Installation of equipment for textile industry enterprises
29. Work on the installation of technological equipment
4530570 Installation of equipment for textile industry enterprises
4530573 Installation of equipment for finishing textile industries
23.23. Installation of equipment for printing industry enterprises
29. Work on the installation of technological equipment
4530500 Installation of equipment for printing industry enterprises
4530501 Installation of equipment for the production of forms of text and stereotyped
4530502 Installation of equipment for printing, copying and duplicating
4530503 Installation of equipment for stitching and binding, for the manufacture and finishing of cardboard and white goods, cardboard production
23.24. Installation of equipment for food industry enterprises *
29. Work on the installation of technological equipment
4530580 Installation of food industry equipment
23.25. Installation of equipment for theater and entertainment enterprises
29. Work on the installation of technological equipment
4530824 Installation of sound-technical installations of theater and entertainment enterprises
4530820 Installation of equipment for theater and entertainment enterprises
23.26. Installation of equipment for grain storage and grain processing enterprises
29. Work on the installation of technological equipment
4530530 Installation of equipment for grain storage and grain processing enterprises
4530531 Installation of equipment for drying and cleaning grain
4530532 Installation of equipment for the production of flour and corn
4530533 Installation of equipment for the production of animal feed
23.27. Installation of equipment for cinematography enterprises *
29. Work on the installation of technological equipment
4530830 Installation of equipment for cinematography enterprises
23.28. Installation of equipment for enterprises of the electronic industry and communications industry *
29. Work on the installation of technological equipment
4530720 Installation of equipment for enterprises of the electronic industry and communications
23.29. Installation of equipment for healthcare institutions and medical industry enterprises *
29. Work on the installation of technological equipment
4530800 Installation of equipment for healthcare institutions and medical industry enterprises
4530801 Installation of sterilization and pharmacy equipment
4530802 Installation of otolaryngological and dental equipment
4530811 Installation of equipment for medical industry enterprises
23.30. Installation of equipment for agricultural production, including fish processing and fish storage *
29. Work on the installation of technological equipment
4530520 Installation of equipment for agricultural production
23.31. Installation of equipment for consumer services and utilities *
29. Work on the installation of technological equipment
4530690 Installation of equipment for enterprises for the repair of household machines and appliances
4530691 Installation of machines and installations for washing, ironing and storage of linen
4530692 Installation of machines and installations for dry cleaning and dyeing of clothes and carpets
4530693 Installation of machines and installations for enterprises for the repair of household machines and appliances
23.32. Installation of water intake equipment, sewage and treatment facilities
Submission of documents on compliance with the requirements for the issuance of certificates is required
23.33. Installation of communication facilities equipment *
29. Work on the installation of technological equipment
4530729 Installation of equipment for communication industry enterprises
4530740 Installation of communication equipment
4530741 Installation of telephone exchanges and switches of the Central Bank, MB, dispatching, long-distance and office communications
4530742 Installation of telephone exchanges and switches of the MB system for director, dispatch and office communications and telephone quasi-telephone exchanges
4530743 Installation of telephone exchanges of rural communications with verification and adjustment
23.34. Installation of equipment for space infrastructure facilities
Submission of documents on compliance with the requirements for the issuance of certificates is required
23.35. Installation of airport equipment and other aviation infrastructure facilities
Submission of documents on compliance with the requirements for the issuance of certificates is required
23.36. Installation of equipment for sea and river ports
Submission of documents on compliance with the requirements for the issuance of certificates is required
24. Commissioning
24.1. Commissioning of handling equipment
30. Commissioning works
4530882 Commissioning of continuous transport mechanisms
24.2. Commissioning of elevators
30. Commissioning works
4530880 Commissioning of lifting and transport equipment
4530881 Commissioning of lifting and transporting mechanisms of intermittent action
24.3. Commissioning of synchronous generators and excitation systems
30. Commissioning works
4530851 Commissioning of synchronous generators and excitation systems
24.4. Commissioning of power and measuring transformers
30. Commissioning works
4530852 Commissioning of power and measuring transformers
24.5. Commissioning of switching devices
30. Commissioning works
4530853 Commissioning of switching devices
24.6. Commissioning of relay protection devices
30. Commissioning works
4530854 Commissioning of relay protection devices
24.7. Commissioning of automation in power supply *
30. Commissioning works
4530855 Commissioning of automation in power supply
24.8. Commissioning of voltage and control current systems
30. Commissioning works
4530856 Commissioning of voltage and control current systems
24.9. Commissioning of electrical machines and electric drives
30. Commissioning works
4530857 Commissioning of electrical machines and electric drives
24.10. Commissioning of automation systems, signaling and interconnected devices *
30. Commissioning works
4530858 Commissioning of automation systems, signaling and interconnected devices
24.11. Commissioning of autonomous system adjustment *
30. Commissioning works
4530863 Commissioning of autonomous system adjustment
24.12. Commissioning of complex system adjustment *
30. Commissioning works
4530864 Commissioning of complex system adjustment
24.13. Commissioning of telemechanics equipment *
30. Commissioning works
4530865 Commissioning of telemechanics equipment
24.14. Adjustment of ventilation and air conditioning systems *
30. Commissioning works
4530870 Commissioning of ventilation and air conditioning systems
24.15. Commissioning of automatic machine lines
30. Commissioning works
4530891 Commissioning of automatic machine lines
24.16. Commissioning of metal-cutting multi-purpose CNC machines
30. Commissioning works
4530893 Commissioning of metal-cutting multipurpose CNC machines
24.17. Commissioning of unique metal-cutting machines weighing over 100 tons
30. Commissioning works
4530895 Commissioning of unique metal-cutting machines weighing over 100 tons
24.18. Commissioning of refrigeration units *
30. Commissioning works
30. Commissioning works
4530901 Commissioning of refrigeration units
24.19. Commissioning of compressor units
30. Commissioning works
4530900 Commissioning of refrigeration and compressor units
30. Commissioning works
4530902 Commissioning of compressor units
24.20. Commissioning of steam boilers
30. Commissioning works
4530911 Commissioning of steam boilers
24.21. Commissioning of hot water heating boilers *
30. Commissioning works
4530912 Commissioning of hot water heating boilers
24.22. Commissioning of boiler-auxiliary equipment *
30. Commissioning works
4530913 Commissioning of boiler - auxiliary equipment
24.23. Commissioning of water treatment equipment and chemical water treatment equipment
30. Commissioning works
4530914 Commissioning of water treatment equipment and chemical water treatment equipment
24.24. Commissioning of technological units of the fuel economy
30. Commissioning works
4530915 Commissioning of technological units of the fuel economy
24.25. Commissioning of the gas-air duct
30. Commissioning works
4530916 Commissioning of the gas-air duct
24.26. Commissioning of general boiler systems and utilities
30. Commissioning works
4530917 Commissioning of general boiler systems and utilities
24.27. Commissioning of equipment for processing and finishing wood
30. Commissioning works
4530920 Commissioning of woodworking equipment
30. Commissioning works
4530922 Commissioning of equipment for processing and finishing wood
24.28. Commissioning of drying plants
30. Commissioning works
4530923 Commissioning of drying plants
24.29. Commissioning of water supply facilities
30. Commissioning works
24.30. Commissioning of sewage facilities
30. Commissioning works
4530930 Commissioning of water supply and sewerage facilities
24.31. Commissioning works at the facilities of the oil and gas complex
Submission of documents on compliance with the requirements for the issuance of certificates is required
25. Arrangement of highways and airfields
25.1. Construction of roadbed for highways, airport aprons, runways, taxiways
Submission of documents on compliance with the requirements for the issuance of certificates is required
25.2. Construction of road bases
31. Works on the construction of highways
4540243 Installation of soil foundations, earthen and crushed stone coverings
25.3. Arrangement of foundations for airport aprons, runways, taxiways
Submission of documents on compliance with the requirements for the issuance of certificates is required
25.4. Devices for road coverings, including those reinforced with binders
4540245 Construction of concrete, mosaic, cement, metal-cement coatings
4540246 Construction of pavements for asphalt concrete and xylene
25.5. Coating devices for airport aprons, runways, taxiways
Submission of documents on compliance with the requirements for the issuance of certificates is required
25.6. Installation of drainage, drainage, culverts, spillway devices
28. Works on installation of external engineering networks and communications of surface runoff and drainage
4510205 Construction of drainage and drainage ditches
4510206 Drainage device from trenches and pits when working in wet soils
4510207 Closed drain device
4510461 Erection of structures of stone and rock
4510462 Backfilling with sand or slag using mechanisms
4510463 Construction of subbeds and foundations of sand and gravel
4510464 Arrangement of subbases and crushed stone bases
4510465 Installation of drainage layers and filters from crushed stone (coal)
4510466 Gravel and sand drainage filters
4510467 Laying of porous ceramic aerate plates
25.7. Arrangement of protective barriers and road construction elements
31. Works on the construction of highways
4540383 Installation of road parapet fences on reinforced concrete posts
4540384 Manufacturing and installation of wooden railings and fences
25.8. Carriageway marking device
31. Works on the construction of highways
4540385 Road marking device
26. Arrangement of railway and tram tracks
26.1. Works on the construction of subgrade for railway tracks
Submission of documents on compliance with the requirements for the issuance of certificates is required
26.2. Works on the construction of subgrade for tram tracks
Submission of documents on compliance with the requirements for the issuance of certificates is required
26.3. Railway track superstructure device
Submission of documents on compliance with the requirements for the issuance of certificates is required
26.4. Installation of drainage and protective structures of the roadbed of the railway track
Submission of documents on compliance with the requirements for the issuance of certificates is required
26.5. Installation of signaling, centralization and blocking of railways
29. Work on the installation of technological equipment
4530730 Installation of signaling, centralization and blocking equipment in railway transport
4530731 Installation of equipment for the electric rod system and routing control devices, mechanical centralization and semi-automatic blocking
4530732 Installation of dispatching equipment, electrical interlocking and blocking
26.6. Railroad electrification
Submission of documents on compliance with the requirements for the issuance of certificates is required
26.7. Securing soils in the railway right-of-way
Submission of documents on compliance with the requirements for the issuance of certificates is required
26.8. Arrangement of level crossings
32. Works on the construction of railway tracks
4540411 Arrangement of level crossings on railway tracks of normal gauge
4540408 Narrow-gauge level crossings
27. Arrangement of tunnels, subways
27.1. Roadheading of tunnels and subways without the use of special tunneling methods
34. Mining works
4510533 Driving tunnels, openings, chambers, adits with the device of permanent and temporary intersections
27.2. Roadheading of tunnels and subways using artificial freezing
Submission of documents on compliance with the requirements for the issuance of certificates is required
27.3. Roadheading of tunnels and subways using grouting
Submission of documents on compliance with the requirements for the issuance of certificates is required
27.4. Roadheading of tunnels and subways using electrochemical fixing
Submission of documents on compliance with the requirements for the issuance of certificates is required
27.5. Roadheading of tunnels and subways using drop support
Submission of documents on compliance with the requirements for the issuance of certificates is required
27.6. Installation of internal structures of tunnels and subways
Submission of documents on compliance with the requirements for the issuance of certificates is required
27.7. Subway track device
Submission of documents on compliance with the requirements for the issuance of certificates is required
28. Arrangement of mine structures
28.1. Driving the development of mine structures without the use of special methods of driving
34. Mining works
4510531 Driving of mine shafts, pits, workings
28.2. Driving in mine structures using artificial freezing
Submission of documents on compliance with the requirements for the issuance of certificates is required
28.3. Sinking of mine structures using grouting
Submission of documents on compliance with the requirements for the issuance of certificates is required
28.4. Driving in mine structures using electrochemical fastening
Submission of documents on compliance with the requirements for the issuance of certificates is required
28.5. Sinking of mine structures with the use of drop support
Submission of documents on compliance with the requirements for the issuance of certificates is required
29. Construction of bridges, flyovers and overpasses
29.1. Installation of monolithic reinforced concrete and concrete structures of bridges, flyovers and overpasses
Submission of documents on compliance with the requirements for the issuance of certificates is required
29.2. Installation of prefabricated reinforced concrete structures for bridges, overpasses and overpasses
15. Works on installation of prefabricated reinforced concrete and concrete structures
4520233 Installation of precast concrete bridges from the shore
29.3. Construction of pedestrian bridges
Submission of documents on compliance with the requirements for the issuance of certificates is required
29.4. Installation of steel superstructures of bridges, flyovers and overpasses
Submission of documents on compliance with the requirements for the issuance of certificates is required
29.5. Construction of wooden bridges, overpasses and overpasses
17. Works on the installation of wooden structures
4540208 Erection of wooden structures for bridges, flyovers, wheel lines, hydraulic structures
4540211 Construction of a wooden bridge deck
29.6. Construction of stone bridges, overpasses and overpasses
Submission of documents on compliance with the requirements for the issuance of certificates is required
29.7. Laying culverts on finished foundations (foundations) and drainage trays
15. Works on installation of prefabricated reinforced concrete and concrete structures
4520239 Laying reinforced concrete culverts under embankments and collectors for laying communications
30. Hydraulic works, diving works
30.1. Development and movement of soil with water jet and floating dredgers
6. Hydromechanized and dredging works
4510415 Development and movement of soil with water jet and floating dredgers
30.2. Loosening and development of soils under water by a mechanized method and delivery to a dump or floating equipment
6. Hydromechanized and dredging works
4510423 Loosening and development of soils under water by a mechanized method and delivery to a dump or floating equipment
30.3. Underwater drilling and arrangement of wells
Submission of documents on compliance with the requirements for the issuance of certificates is required
30.4. Piling works performed in sea conditions from floating equipment, including the installation of shell piles
Submission of documents on compliance with the requirements for the issuance of certificates is required
30.5. Piling works performed in river conditions from floating equipment, including the installation of shell piles
Submission of documents on compliance with the requirements for the issuance of certificates is required
30.6. Construction of structures in sea and river conditions from natural and artificial massifs
Submission of documents on compliance with the requirements for the issuance of certificates is required
30.7. Construction of dams
Submission of documents on compliance with the requirements for the issuance of certificates is required
30.8. Installation, dismantling of building structures in underwater conditions
Submission of documents on compliance with the requirements for the issuance of certificates is required
30.9 Underwater Pipeline Laying
Submission of documents on compliance with the requirements for the issuance of certificates is required
30.10. Underwater cable laying, including electrical and communications
28. Works on installation of external engineering networks and communications
4530153 Laying cables in underwater trenches
30.11. Diving (underwater construction) work, including quality control of hydraulic engineering works under water
33. Underwater works (diving)
4510521 Lifting objects out of water
4510522 Underwater leveling and vibration compaction of horizontal beds by divers
4510523 Moving stone under water, removing stone and rubble from water
4510524 Lowering of metal and reinforced concrete shells of the heads under water
4510525 Installation of mooring barrels on reinforced concrete anchors in the water area
31. Industrial ovens and chimneys
31.1. Blast furnaces
Submission of documents on compliance with the requirements for the issuance of certificates is required
31.2. Masonry of the topside structure of glass furnaces
Submission of documents on compliance with the requirements for issuance of certificates is required
31.3. Installation of furnaces from prefabricated elements of increased factory readiness
Submission of documents on compliance with the requirements for the issuance of certificates is required
31.4. Electrolyzers for the aluminum industry
Submission of documents on compliance with the requirements for the issuance of certificates is required
31.5. Lining of industrial smoke and ventilation furnaces and pipes
22. Works on the construction and lining of industrial furnaces and smoke
4520412 Lining of reinforced concrete industrial pipes with acid-resistant bricks
4520303 Industrial pipe laying and lining
32. Work on the implementation of construction control by a contracted developer or customer on the basis of an agreement by a legal entity or individual entrepreneur
32.1. Construction control over general construction works (groups of types of work No. 1-3, 5-7, 9-14)
Submission of documents on compliance with the requirements for the issuance of certificates is required
32.2. Construction supervision of well completion works (group of types of work No. 4)
Submission of documents on compliance with the requirements for the issuance of certificates is required
32.3. Construction control over drilling and blasting operations (group of types of work No. 8)
Submission of documents on compliance with the requirements for the issuance of certificates is required
32.4. Construction control over works in the field of water supply and sewerage (type of work No. 15.1, 23.32, 24.29, 24.30, groups of types of work No. 16, 17)
Submission of documents on compliance with the requirements for the issuance of certificates is required
32.5. Construction control over work in the field of heat and gas supply and ventilation (types of work No. 15.2, 15.3, 15.4, 23.4, 23.5, 24.14, 24.19, 24.20, 24.21, 24.22, 24.24, 24.25, 24.26, groups of types of work No. 18, 19.)
Submission of documents on compliance with the requirements for the issuance of certificates is required
32.6. Construction control over works in the field of fire safety (type of work No. 12.3, 12.12, 23.6, 24.10-24.12)
Submission of documents on compliance with the requirements for the issuance of certificates is required
32.7. Construction control over works in the field of power supply (type of work
No. 15.5, 15.6, 23.6, 24.3-24.10, group of types of work No. 20)
Submission of documents on compliance with the requirements for the issuance of certificates is required
32.8. Construction control during construction, reconstruction and overhaul of communication facilities (types of work No. 23.33, group of types of work No. 21)
Submission of documents on compliance with the requirements for the issuance of certificates is required
32.9. Construction control during construction, reconstruction and overhaul of oil and gas industry facilities (type of work No. 23.9, 23.10, group of types of work No. 22)
Submission of documents on compliance with the requirements for the issuance of certificates is required
32.10. Construction control during the construction, reconstruction and overhaul of roads and airfields, bridges, overpasses and overpasses (type of work No. 23.35, groups of types of work No. 25, 29)
Submission of documents on compliance with the requirements for the issuance of certificates is required
32.11. Construction control during the arrangement of railway and tram tracks (types of work No. 23.16, group of types of work No. 26)
Submission of documents on compliance with the requirements for the issuance of certificates is required
32.12. Construction control during construction, reconstruction and overhaul in underground conditions (types of work No. 23.17, groups of types of work No. 27, 28)
Submission of documents on compliance with the requirements for the issuance of certificates is required
32.13. Construction control over hydraulic engineering and diving works (group of types of work No. 30)
Submission of documents on compliance with the requirements for the issuance of certificates is required
32.14. Construction control during construction, reconstruction and overhaul of industrial furnaces and chimneys (group of types of work No. 31)
Submission of documents on compliance with the requirements for the issuance of certificates is required
32.15. Construction control during construction, reconstruction and overhaul of nuclear facilities (23.7)
Submission of documents on compliance with the requirements for the issuance of certificates is required
33. Work on the organization of construction, reconstruction and overhaul by a legal entity or individual entrepreneur (general contractor) attracted by the developer or customer on the basis of an agreement
38. Work on the organization of construction, reconstruction and overhaul by an involved developer or customer on the basis of a contract by a legal entity or an individual entrepreneur (general contractor)
33.1. Industrial engineering
Submission of documents on compliance with the requirements for the issuance of certificates is required
33.1.1. Enterprises and objects of the fuel industry
Submission of documents on compliance with the requirements for the issuance of certificates is required
33.1.2. Coal industry enterprises and facilities
Submission of documents on compliance with the requirements for the issuance of certificates is required
33.1.3. Ferrous metallurgy enterprises and facilities
Submission of documents on compliance with the requirements for the issuance of certificates is required
33.1.4. Non-ferrous metallurgy enterprises and facilities
Submission of documents on compliance with the requirements for the issuance of certificates is required
33.1.5 Enterprises and facilities of the chemical and petrochemical industry
Submission of documents on compliance with the requirements for the issuance of certificates is required
33.1.6 Enterprises and objects of mechanical engineering and metalworking
Submission of documents on compliance with the requirements for the issuance of certificates is required
33.1.7. Enterprises and facilities of the forestry, woodworking, pulp and paper industries
Submission of documents on compliance with the requirements for the issuance of certificates is required
33.1.8. Light industry enterprises and facilities *
Submission of documents on compliance with the requirements for the issuance of certificates is required
33.1.9. Enterprises and facilities of the food industry *
Submission of documents on compliance with the requirements for the issuance of certificates is required
33.1.10. Enterprises and objects of agriculture and forestry *
Submission of documents on compliance with the requirements for the issuance of certificates is required
33.1.11. Thermal power plants
Submission of documents on compliance with the requirements for the issuance of certificates is required
33.1.12. Nuclear facilities
Submission of documents on compliance with the requirements for the issuance of certificates is required
33.1.13. Power supply facilities over 110 kV
Submission of documents on compliance with the requirements for the issuance of certificates is required
33.1.14. Oil and gas facilities
Submission of documents on compliance with the requirements for the issuance of certificates is required
33.2. Transport construction
Submission of documents on compliance with the requirements for the issuance of certificates is required
33.2.1. Highways and road transport infrastructure
Submission of documents on compliance with the requirements for the issuance of certificates is required
33.2.2. Railways and railway infrastructure facilities
Submission of documents on compliance with the requirements for the issuance of certificates is required
33.2.3. Airports and other aviation infrastructure facilities
Submission of documents on compliance with the requirements for the issuance of certificates is required
33.2.4. Road and rail tunnels
Submission of documents on compliance with the requirements for the issuance of certificates is required
33.2.5. Subways
Submission of documents on compliance with the requirements for the issuance of certificates is required
33.2.6. Bridges (large and medium)
Submission of documents on compliance with the requirements for the issuance of certificates is required
33.2.7. Enterprises and facilities public transport*
Submission of documents on compliance with the requirements for the issuance of certificates is required
33.3. Housing and civil construction
Submission of documents on compliance with the requirements for the issuance of certificates is required
33.4. Power supply facilities up to 110 kV inclusive
Submission of documents on compliance with the requirements for the issuance of certificates is required
33.5. Heat supply facilities
Submission of documents on compliance with the requirements for the issuance of certificates is required
33.6. Gas supply facilities
Submission of documents on compliance with the requirements for the issuance of certificates is required
33.7. Water supply and sewerage facilities
Submission of documents on compliance with the requirements for the issuance of certificates is required
33.8. Buildings and structures of communication facilities
Submission of documents on compliance with the requirements for the issuance of certificates is required
33.9. Marine transport facilities
Submission of documents on compliance with the requirements for the issuance of certificates is required
33.10. River transport facilities
Submission of documents on compliance with the requirements for the issuance of certificates is required
33.11. Hydropower facilities
Submission of documents on compliance with the requirements for the issuance of certificates is required
33.12. Dams, dams, canals, bank protection structures, reservoirs (excluding hydropower facilities)
Submission of documents on compliance with the requirements for the issuance of certificates is required
33.13. Irrigation and drainage facilities
Submission of documents on compliance with the requirements for the issuance of certificates is required
* These types and groups of types of work require obtaining a certificate of admission to the types of work affecting the safety of a capital construction facility, in the event that such work is performed at the facilities specified in Article 48.1 of the Town Planning Code of the Russian Federation
A certificate of admission to the type of work from List No. 2 is issued without additional submission of documents on compliance with the Requirements for the issuance of certificates if a member of the Partnership has a certificate for all types (codes) of work from List No. 1 indicated opposite this type of work.
MINISTRY OF REGIONAL DEVELOPMENT
RUSSIAN FEDERATION
ABOUT APPROVAL OF THE LIST
CAPITAL REPAIRS OF CAPITAL OBJECTS
CONSTRUCTION,
CAPITAL CONSTRUCTION
(as amended by the Order of the Ministry of Regional Development of the Russian Federation of 23.06.2010 N 294,
Order of the Ministry of Regional Development of the Russian Federation of 05/26/2011 N 238)
Pursuant to part 5 of Article 8 of the Federal Law of July 22, 2008 N 148-FZ "On Amendments to the Town Planning Code of the Russian Federation and Certain Legislative Acts of the Russian Federation" (Collected Legislation of the Russian Federation, 2008, N 30 (part I), 3604) and in accordance with the Decree of the Government of the Russian Federation of November 19, 2008 N 864 "On measures to implement the Federal Law of July 22, 2008 N 148-FZ" On amendments to the Town Planning Code of the Russian Federation and certain legislative acts Russian Federation "(Collected Legislation of the Russian Federation, 2008, No. 48, Art. 5612) I order:
1. To approve the attached List of types of works on engineering surveys, on the preparation of project documentation, on construction, reconstruction, overhaul of capital construction facilities that affect the safety of capital construction facilities (hereinafter - the List).
2. Establish that the List does not include the types of work for the preparation of project documentation, for construction, reconstruction, overhaul in relation to objects for which the issuance of a building permit is not required in accordance with part 17 of Article 51 of the Town Planning Code of the Russian Federation (Collected Legislation of the Russian Federation , 2005, N 1, Art. 16; 2008, N 30 (Part II), Art. 3616), as well as in relation to objects of individual housing construction (detached residential buildings with no more than three floors intended for living not more than two families); residential buildings with no more than three floors, consisting of several blocks, the number of which does not exceed ten and each of which is intended for the residence of one family, has a common wall (common walls) without openings with a neighboring block or neighboring blocks, located on a separate land plot and has access to the territory common use (residential buildings of a blocked development); apartment buildings with no more than three floors, consisting of one or several block sections, the number of which does not exceed four, each of which contains several apartments and common areas, and each of which has a separate entrance with access to the common area.
The types of work on the preparation of project documentation contained in the List can be performed by an individual entrepreneur independently (personally), and types of work on engineering surveys, construction, reconstruction, overhaul - only with the involvement of employees in the manner prescribed by the legislation of the Russian Federation.
(the paragraph was introduced by the Order of the Ministry of Regional Development of the Russian Federation of 23.06.2010 N 294)
3. Declare invalid the Order of the Ministry of Regional Development of the Russian Federation of December 9, 2008 N 274 "On approval of the List of types of work on engineering surveys, on the preparation of project documentation, on construction, reconstruction, overhaul of capital construction projects that affect the safety of capital construction "(registered with the Ministry of Justice of Russia on January 16, 2009, N 13086), as well as the Order of the Ministry of Regional Development of the Russian Federation of October 21, 2009 N 480" On amendments to the Order of the Ministry of Regional Development of the Russian Federation of December 9, 2008 No. 274 "On approval of the List of types of work on engineering surveys, on the preparation of design documentation, on construction, reconstruction, overhaul of capital construction facilities that affect the safety of capital construction facilities" (registered with the Ministry of Justice of Russia on December 22, 2009, N 15789 ) cm the moment of entry into force of this Order.
5. Control over the execution of this Order shall be entrusted to the Deputy Minister of Regional Development of the Russian Federation V.A. Tokarev.
Minister
V. BASARGIN
SCROLL
TYPES OF WORK ON ENGINEERING SURVEY, PREPARATION
DESIGN DOCUMENTATION, CONSTRUCTION, RECONSTRUCTION,
CAPITAL REPAIRS OF CAPITAL CONSTRUCTION OBJECTS,
WHICH AFFECT THE SECURITY OF FACILITIES
CAPITAL CONSTRUCTION
I. Types of engineering survey work
1. Works as part of engineering and geodetic surveys
1.1. Creation of geodetic reference networks
1.2. Geodetic observations of deformations and settlements of buildings and structures, movements of the earth's surface and hazardous natural processes
1.3. Creation and updating of engineering and topographic plans on a scale of 1: 200 - 1: 5000, including in digital form, surveying underground communications and structures
1.4. Trace line features
1.5. Engineering and hydrographic works
1.6. Special geodetic and topographic works during the construction and reconstruction of buildings and structures
2. Works as part of engineering and geological surveys
2.1. Engineering-geological survey on a scale of 1: 500 - 1: 25000
2.2. Driving of mine workings with their testing, laboratory studies of the physical and mechanical properties of soils and the chemical properties of groundwater samples
2.3. Study of hazardous geological and engineering-geological processes with the development of recommendations for engineering protection of the territory
2.4. Hydrogeological research
2.5. Engineering and geophysical research
2.6. Engineering and geocryological research
2.7. Seismological and seismotectonic studies of the territory, seismic microzoning
3. Works as part of engineering and hydrometeorological surveys
3.1. Meteorological observations and study of the hydrological regime of water bodies
3.2. Study of hazardous hydrometeorological processes and phenomena with calculations of their characteristics
3.3. Study of channel processes of water bodies, deformations and processing of banks
3.4. Research of ice regime of water bodies
4. Works as part of engineering and environmental surveys
4.1. Engineering and environmental survey of the territory
4.2. Research of chemical pollution of soils, surface and underground waters, atmospheric air, pollution sources
4.3. Laboratory chemical-analytical and gas-chemical studies of samples and samples of soil and water
4.4. Research and assessment of physical impacts and radiation conditions on the territory
4.5. Study of vegetation, fauna, sanitary-epidemiological and medico-biological studies of the territory<*>
<*> These types and groups of types of work require obtaining a certificate of admission for the types of work affecting the safety of a capital construction facility, in the event that such work is performed at the facilities specified in Article 48.1 of the Urban Planning Code of the Russian Federation.
5. Works as part of engineering and geotechnical surveys (Performed as part of engineering and geological surveys or separately on the territory studied in engineering and geological terms for individual buildings and structures)
5.1. Driving of mine workings with their testing and laboratory studies of the mechanical properties of soils with the definition of characteristics for specific calculation schemes for foundations
5.2. Field tests of soils with the determination of their standard strength and deformation characteristics (stamp, shear, pressureiometric, shear). Testing of reference and full-scale piles
5.3. Determination of standard mechanical characteristics of soils by methods of static, dynamic and drilling sounding
5.4. Physical and mathematical modeling of the interaction of buildings and structures with the geological environment
5.5. Special studies of soil characteristics according to selected programs for non-standard, including non-linear methods for calculating the foundations of foundations and structures of buildings and structures
5.6. Geotechnical control of the construction of buildings, structures and adjacent territories
6. Inspection of the state of soils of the foundation of buildings and structures
7. Excluded. - Order of the Ministry of Regional Development of the Russian Federation of 05/26/2011 N 238.
II. Types of work on the preparation of project documentation
1. Work on the preparation of a plan for the planning organization of a land plot:
1.1. Works on preparation of the master plan of the land plot
1.2. Work on the preparation of a layout scheme for the route of a linear object
1.3. Work on the preparation of a layout plan for the right-of-way of a linear structure
2. Works on the preparation of architectural solutions
3. Work on the preparation of design solutions
4. Work on the preparation of information about internal engineering equipment, internal networks of engineering and technical support, about the list of engineering and technical measures:
4.1. Work on the preparation of projects for internal engineering systems for heating, ventilation, air conditioning, smoke ventilation, heat supply and refrigeration
4.2. Works on the preparation of projects for internal engineering water supply and sewerage systems
4.3. Work on the preparation of projects for internal power supply systems<*>
4.4. Work on the preparation of projects for internal low-current systems<*>
4.5. Work on the preparation of projects for internal dispatching, automation and management of engineering systems
4.6. Preparation of projects for internal gas supply systems
5. Work on the preparation of information on external networks of engineering and technical support, on the list of engineering and technical measures:
5.1. Work on the preparation of projects for external heat supply networks and their structures
5.2. Works on the preparation of projects for external water supply and sewerage networks and their structures
5.3. Works on preparation of projects of external power supply networks up to 35 kV inclusive and their structures
5.4. Works on the preparation of projects for external power supply networks of not more than 110 kV inclusive and their structures
5.5. Works on the preparation of projects for external power supply networks of 110 kV and more and their structures
5.6. Preparation of projects for external networks of low-current systems
5.7. Preparation of projects for external gas supply networks and their structures
6. Work on the preparation of technological solutions:
6.1. Preparation of technological solutions for residential buildings and their complexes
6.2. Works on the preparation of technological solutions for public buildings and structures and their complexes
6.3. Works on the preparation of technological solutions for industrial buildings and structures and their complexes
6.4. Work on the preparation of technological solutions for transport facilities and their complexes
6.5. Work on the preparation of technological solutions for hydraulic structures and their complexes
6.6. Work on the preparation of technological solutions for agricultural facilities and their complexes
6.7. Preparation of technological solutions for special-purpose facilities and their complexes
6.8. Preparation of technological solutions for oil and gas facilities and their complexes
6.9. Works on the preparation of technological solutions for objects of collection, processing, storage, processing and disposal of waste and their complexes
6.10. Works on the preparation of technological solutions for nuclear power facilities and industry and their complexes
6.11. Preparation of technological solutions for military infrastructure facilities and their complexes
6.12. Work on the preparation of technological solutions for treatment facilities and their complexes
6.13. Work on the preparation of technological solutions for metro facilities and their complexes
(Clause 6.13 was introduced by Order of the Ministry of Regional Development of the Russian Federation of 23.06.2010 N 294)
7. Work on the development of special sections of project documentation:
7.1. Civil defense engineering and technical measures
7.2. Engineering and technical measures to prevent natural and man-made emergencies
7.3. Development of a declaration on industrial safety of hazardous production facilities
7.4. Development of a safety declaration for hydraulic structures
7.5. Development of a justification for radiation and nuclear protection
9. Work on the preparation of draft measures for environmental protection
10. Work on the preparation of draft measures to ensure fire safety
11. Works on the preparation of draft measures to ensure access for people with limited mobility
12. Works on inspection of building structures of buildings and structures
13. Works on the organization of preparation of project documentation by the involved developer or customer on the basis of a contract by a legal entity or individual entrepreneur (general designer)
III. TYPES OF WORKS FOR CONSTRUCTION, RECONSTRUCTION AND OVERALL REPAIRS
1. Geodetic works performed on construction sites
1.1. Layout work during construction<*>
1.2. Geodetic control of the accuracy of the geometric parameters of buildings and structures<*>
2. Preparatory work
2.1. Dismantling (dismantling) of buildings and structures, walls, ceilings, flights of stairs and other structural and related elements or their parts<*>
2.2. Construction of temporary: roads; sites; engineering networks and structures<*>
2.3. Construction of crane rail tracks and foundations (supports) of stationary cranes
2.4. Installation and dismantling of inventory external and internal scaffolding, technological garbage chutes<*>
3. Earthwork
3.1. Mechanized soil development<*>
3.2. Soil development and drainage in water management construction
3.3. Development of soil by hydromechanization
3.4. Artificial soil freezing works
3.5. Compaction with rollers, compactors or heavy rammers<*>
3.6. Mechanized loosening and development of permafrost soils
3.7. Works on dewatering, organization of surface runoff and drainage
4. Well construction
4.1. Drilling, construction and installation of oil and gas wells
4.2. Drilling and construction of wells (except for oil and gas wells)
4.3. Well casing with pipes, pipe extraction, free lowering or lifting of pipes from wells
4.4. Grouting works
4.5. Construction of mine wells
5. Pile work. Anchoring soils
5.1. Piling works performed from the ground, including in sea and river conditions
5.2. Piling works performed in frozen and permafrost soils
5.3. Grillage device
5.4. Installation of driven and bored piles
5.5. Thermal soil strengthening
5.6. Cementation of sub-bases with injector blocking
5.7. Silicatization and resinization of soils
5.8. Slurry wall erection works
5.9. Driving and lifting of steel and sheet piles
6. Construction of concrete and reinforced concrete monolithic structures
6.1. Formwork works
6.2. Reinforcement work
6.3. Installation of monolithic concrete and reinforced concrete structures
7. Installation of precast concrete and reinforced concrete structures
7.1. Installation of foundations and structures of the underground part of buildings and structures
7.2. Installation of structural elements of the aboveground part of buildings and structures, including columns, frames, crossbars, trusses, beams, slabs, belts, wall panels and partitions
7.3. Installation of bulk blocks, including ventilation blocks, elevator shafts and garbage chutes, sanitary cabins
8. Drilling and blasting during construction
9. Work on the device of stone structures
9.1. Construction of buildings and structures made of natural and artificial stones, including cladding<*>
9.2. Construction of brick structures, including those with cladding<*>
9.3. Installation of heating stoves and hearths<*>
10. Installation of metal structures
10.1. Installation, strengthening and dismantling of structural elements and enclosing structures of buildings and structures
10.2. Installation, strengthening and dismantling of transport gallery structures
10.3. Installation, strengthening and dismantling of tank structures
10.4. Installation, strengthening and dismantling of mast structures, towers, exhaust pipes
10.5. Installation, strengthening and dismantling of technological structures
10.6. Installation and dismantling of cable bearing structures (stretch marks, cable-stayed structures, etc.)
11. Installation of wooden structures
11.1. Installation, strengthening and dismantling of structural elements and enclosing structures of buildings and structures, including those made of glued structures<*>
11.2. Assembly of residential and public buildings from factory-made parts of a complete delivery<*>
12. Protection of building structures, pipelines and equipment (except for trunk and field pipelines)
12.1. Lining works
12.2. Masonry made of acid-resistant bricks and shaped acid-resistant ceramic products
12.3. Protective coating with paints and varnishes<*>
12.4. Rubber coating (lining with sheet rubber and liquid rubber compounds)
12.5. Papered insulation device
12.6. Arrangement of metallization coatings
12.7. Application of topcoat when installing a monolithic floor in rooms with aggressive environments
12.8. Antiseptic treatment of wooden structures
12.9. Waterproofing of building structures
12.10. Works on thermal insulation of buildings, building structures and equipment
12.11. Works on thermal insulation of pipelines<*>
12.12. Works on fire protection of building structures and equipment
13. Roofing device
13.1. Installation of roofs made of piece and sheet materials<*>
13.2. Roofing from roll materials<*>
13.3. Liquid roofing device<*>
14. Facade work
14.1. Surface cladding with natural and artificial stones and linear shaped stones<*>
14.2. Ventilated facades<*>
15. Arrangement of internal engineering systems and equipment of buildings and structures
15.1. Installation and dismantling of water supply and sewerage systems<*>
15.2. Installation and dismantling of the heating system<*>
15.3. Installation and dismantling of the gas supply system
15.4. Installation and dismantling of ventilation and air conditioning systems<*>
15.5. Power supply system device<*>
15.6. Installation of electrical and other control networks for life support systems of buildings and structures<*>
{!LANG-13c936bccc860ac1851437f475aedf09!}
16.1. Laying of water pipelines
16.2. Installation and dismantling of valves and equipment for water supply networks
16.3. Arrangement of water wells, heads, catchment absorbers
16.4. Cavity cleaning and testing of water pipelines
{!LANG-37ffe6c6d273bda8e141cf2dd6909684!}
17.1. Laying of free-flow sewer pipelines
17.2. Laying of sewer pressure pipelines
17.3. Installation and dismantling of valves and equipment for sewer networks
17.4. Construction of sewerage and drainage wells
17.5. Arrangement of a filtering base for sludge platforms and filtration fields
17.6. Laying drainage pipes at sludge sites
17.7. Cavity cleaning and testing of sewer pipelines
{!LANG-0bc5662f953b26161026d12bdc6f4491!}
18.1. Laying of heat supply pipelines with a coolant temperature of up to 115 degrees Celsius
18.2. Laying heat supply pipelines with a coolant temperature of 115 degrees Celsius and above
18.3. Installation and dismantling of valves and equipment for heat supply networks
18.4. Installation of wells and chambers of heat supply networks
18.5. Cavity cleaning and testing of heating pipelines
{!LANG-04db93bd1b257de3c18522c81f275483!}
19.1. Laying gas pipelines with a working pressure of up to 0.005 MPa inclusive
19.2. Laying gas pipelines with a working pressure from 0.005 MPa to 0.3 MPa inclusive
19.3. Laying gas pipelines with operating pressure from 0.3 MPa to 1.2 MPa inclusive (for natural gas), up to 1.6 MPa inclusive (for liquefied petroleum gas)
19.4. Installation of condensate collectors, hydraulic locks and expansion joints on gas pipelines
19.5. Installation and dismantling of gas control points and installations
19.6. Installation and dismantling of tank and group cylinder installations of liquefied gas
19.7. Putting a gas pipeline into buildings and structures
19.8. Installation and dismantling of gas equipment for consumers using natural and liquefied gas
19.9. Tapping under pressure into existing gas pipelines, disconnecting and plugging under pressure of existing gas pipelines
19.10. Cavity cleaning and testing of gas lines
{!LANG-d3eebd60f450eac996d2d13cc422d70d!}
{!LANG-dbc8b53f8d62e422d58605c9cad97115!}<*>
20.2. Arrangement of power supply networks with voltage up to 35 kV inclusive
20.3. Arrangement of power supply networks with voltage up to 330 kV inclusive
{!LANG-a21e5478a20876a6f7184397ef2d87ad!}
20.5. Installation and dismantling of supports for overhead power lines up to 35 kV
20.6. Installation and dismantling of supports for overhead power lines with voltage up to 500 kV
20.7. Installation and dismantling of supports for overhead power lines with a voltage of more than 500 kV
20.8. Installation and dismantling of wires and lightning protection cables of overhead power lines with voltage up to 35 kV inclusive
20.9. Installation and dismantling of wires and lightning protection cables of overhead power lines with voltage over 35 kV
20.10. Installation and dismantling of transformer substations and linear electrical equipment with voltage up to 35 kV inclusive
20.11. Installation and dismantling of transformer substations and linear electrical equipment with voltage over 35 kV
20.12. Installation of switchgears, switching equipment, protection devices
{!LANG-9a7efc8d7f890457e5c856fec16cf3e0!}<*>
{!LANG-d4f3afd982df18e53d68b14fc9dce1fc!}
{!LANG-feb66deb34ec2ac8d6ad78fa62a2e513!}
{!LANG-fe79a4caa26de41a168bb31976617045!}
{!LANG-0d901b778c7fad1ce1901f3fdd28ede3!}
{!LANG-beae4eb34658b3fa8f38eab29c341689!}
{!LANG-b1dd1b36d026c2d657163b066c32a85f!}
{!LANG-04e85c46295fe8e18a0ac06503d1af5a!}
{!LANG-80dfe4abee1f9b7fc1a631568f7a356c!}
{!LANG-1f65c50ec0a13a4aaa30f36324deb6ac!}
{!LANG-2cd55a410c1955047b1f168fd28b356c!}
{!LANG-9d526492aa37ea0187e3538c7ae2f8a6!}
22.2. Works on the arrangement of facilities for the preparation of oil and gas for transport
22.3. Arrangement of oil depots and gas storage facilities
22.4. Arrangement of crossings under linear objects (roads and railways) and other obstacles of natural and artificial origin
22.5. Work on the construction of crossings using directional drilling
22.6. Device for electrochemical protection of pipelines
22.7. Tapping under pressure into existing main and field pipelines, disconnecting and plugging under pressure of existing main and field pipelines
22.8. Implementation of anti-corrosion protection and insulation works in relation to main and field pipelines
22.9. Works on the arrangement of oil and gas fields of the sea shelf
22.10. Works on the construction of gas filling compressor stations
22.11. Quality control of welded joints and their insulation
22.12. Cavity cleaning and testing of main and field pipelines
{!LANG-910f9fbeb61f19dd798674b7a962cecc!}
23.1. Installation of handling equipment
23.2. Installation of elevators
23.3. Installation of equipment for thermal power plants
23.4. Installation of boiler equipment
{!LANG-dfe15247f2578e52d3e55f580f739235!}<*>
{!LANG-3a9db1598da6315b343bc0e972531b02!}<*>
{!LANG-58258d5bc0f42ac453e70dda70ab991b!}
23.8. Installation of equipment for cleaning and preparation for transportation of gas and oil
23.9. Installation of equipment for oil and gas pumping stations and for other product pipelines
23.10. Installation of equipment for liquefaction of natural gas
23.11. Installation of equipment for filling stations
23.12. Installation of equipment for ferrous metallurgy enterprises
23.13. Installation of equipment for non-ferrous metallurgy enterprises
23.14. Installation of equipment for the chemical and oil refining industry
23.15. Installation of mining and mining equipment
23.16. Installation of equipment for railway infrastructure facilities
23.17. Installation of equipment for subways and tunnels
23.18. Installation of equipment for hydroelectric power stations and other hydraulic structures
23.19. Installation of equipment for enterprises of the electrical industry
23.20. Installation of equipment for enterprises of the building materials industry
23.21. Installation of equipment for the pulp and paper industry
23.22. Installation of equipment for textile industry enterprises
23.23. Installation of equipment for printing industry enterprises
{!LANG-8fbd11bcbde1dab5a4a77099c91eb2a5!}<*>
23.25. Installation of equipment for theater and entertainment enterprises
23.26. Installation of equipment for grain storage and grain processing enterprises
{!LANG-5cd1923504ab375c46276da9f6566470!}<*>
{!LANG-5fcb081970f49ffc6397a558b62858a5!}<*>
{!LANG-c83d7becf9d49bbe11d8871f21c55f90!}<*>
{!LANG-b4bc21a34f73a65236feeb553168074e!}<*>
{!LANG-a710884eb52f52c35ab1bd62427d56d9!}<*>
23.32. Installation of water intake equipment, sewage and treatment facilities
{!LANG-b21703d21da25136a228754141d74d9d!}<*>
23.34. Installation of equipment for space infrastructure facilities
23.35. Installation of airport equipment and other aviation infrastructure facilities
23.36. Installation of equipment for sea and river ports
{!LANG-77598b73816bda11f104e609defea2d2!}
24.1. Commissioning of handling equipment
24.2. Commissioning of elevators
24.3. Commissioning of synchronous generators and excitation systems
24.4. Commissioning of power and measuring transformers
24.5. Commissioning of switching devices
24.6. Commissioning of relay protection devices
{!LANG-cd1dc74438506ce36d5380fb04d201b6!}<*>
24.8. Commissioning of voltage and control current systems
24.9. Commissioning of electrical machines and electric drives
{!LANG-93ae9d4896f5c7c47fd953e6d5420d4e!}<*>
{!LANG-70e7f5117fa561755ae777d9f3aa8c73!}<*>
{!LANG-265c823a40bcebd4bbe8a946b4effed5!}<*>
{!LANG-e8536006dd28205df69c1f1a339d963d!}<*>
{!LANG-5907fc78ecc24b7b93935c8d60e8b963!}<*>
24.15. Commissioning of automatic machine lines
24.16. Commissioning of metal-cutting multi-purpose CNC machines
24.17. Commissioning of unique metal-cutting machines weighing over 100 tons
{!LANG-675a1ac30e0ee8802390a1458b3f1ed9!}<*>
24.19. Commissioning of compressor units
24.20. Commissioning of steam boilers
{!LANG-a3a8dd56a9c846a5dc8ebb3b45cb3292!}<*>
{!LANG-4fb79d869b86ade12175a38025de4d8f!}<*>
24.23. Commissioning of water treatment equipment and chemical water treatment equipment
24.24. Commissioning of technological units of the fuel economy
24.25. Commissioning of the gas-air duct
24.26. Commissioning of general boiler systems and utilities
24.27. Commissioning of equipment for processing and finishing wood
24.28. Commissioning of drying plants
24.29. Commissioning of water supply facilities
24.30. Commissioning of sewage facilities
24.31. Commissioning works at the facilities of the oil and gas complex
{!LANG-eb96d6a90132a9344814085413cfa7a0!}
{!LANG-fe833ee2ac96a24461df895b4fd1ee2b!}
25.1. Construction of roadbed for highways, airport aprons, runways, taxiways
25.2. Construction of road bases
25.3. Arrangement of foundations for airport aprons, runways, taxiways
25.4. Devices for road coverings, including those reinforced with binders
25.5. Coating devices for airport aprons, runways, taxiways
25.6. Installation of drainage, drainage, culverts, spillway devices
25.7. Arrangement of protective barriers and road construction elements
25.8. Carriageway marking device
{!LANG-2561f2ee8cb12ca6da338fea82338e14!}
26.1. Works on the construction of subgrade for railway tracks
26.2. Works on the construction of subgrade for tram tracks
26.3. Railway track superstructure device
26.4. Installation of drainage and protective structures of the roadbed of the railway track
26.5. Installation of signaling, centralization and blocking of railways
26.6. Railroad electrification
26.7. Securing soils in the railway right-of-way
26.8. Arrangement of level crossings
{!LANG-28e89cfab98869ff0e4c7f8308062e2a!}
27.1. Roadheading of tunnels and subways without the use of special tunneling methods
27.2. Roadheading of tunnels and subways using artificial freezing
27.3. Roadheading of tunnels and subways using grouting
27.4. Roadheading of tunnels and subways using electrochemical fixing
27.5. Roadheading of tunnels and subways using drop support
27.6. Installation of internal structures of tunnels and subways
27.7. Subway track device
{!LANG-36e18f9c975ab71937c1ac6029c7f73b!}
28.1. Driving the development of mine structures without the use of special methods of driving
28.2. Driving in mine structures using artificial freezing
28.3. Sinking of mine structures using grouting
28.4. Driving in mine structures using electrochemical fastening
28.5. Sinking of mine structures with the use of drop support
29. Construction of bridges, flyovers and overpasses
29.1. Installation of monolithic reinforced concrete and concrete structures of bridges, flyovers and overpasses
29.2. Installation of prefabricated reinforced concrete structures for bridges, overpasses and overpasses
29.3. Construction of pedestrian bridges
29.4. Installation of steel superstructures of bridges, flyovers and overpasses
29.5. Construction of wooden bridges, overpasses and overpasses
29.6. Construction of stone bridges, overpasses and overpasses
29.7. Laying culverts on finished foundations (foundations) and drainage trays
{!LANG-d6f4cf2d6e33431924609a9946f715c4!}
30.1. Development and movement of soil with water jet and floating dredgers
30.2. Loosening and development of soils under water by a mechanized method and delivery to a dump or floating equipment
30.3. Underwater drilling and arrangement of wells
30.4. Piling works performed in sea conditions from floating equipment, including the installation of shell piles
30.5. Piling works performed in river conditions from floating equipment, including the installation of shell piles
30.6. Construction of structures in sea and river conditions from natural and artificial massifs
30.7. Construction of dams
30.8. Installation, dismantling of building structures in underwater conditions
{!LANG-a1fd1d9da198cdbc5854216d5f87a15a!}
30.10. Underwater cable laying, including electrical and communications
30.11. Diving (underwater construction) work, including quality control of hydraulic engineering works under water
{!LANG-4ea29e9a8cf4ee1f5691dc70687e016e!}
31.1. Blast furnaces
31.2. Masonry of the topside structure of glass furnaces
31.3. Installation of furnaces from prefabricated elements of increased factory readiness
31.4. Electrolyzers for the aluminum industry
{!LANG-b26195730dfb9a8e6cbfc1ad2c34f589!}
{!LANG-79ef107d7c0a20e89ea184f840ee7ba4!}
{!LANG-eb404ec532e0a5e9743639ed6b097a7d!}
{!LANG-b7664f71ab0b7f3f7fcb57fc719ea79a!}
{!LANG-fc6b5abf5809982594e74f489d8ab78e!}
{!LANG-66971738f3ecbb95b04fdb2a8dd17249!}
{!LANG-2ddd90cf0642cd5edd87e0054bbbe67b!}
{!LANG-be16bcdac2ff9debb813a4e7280f4d99!}
{!LANG-4fa37ca7eb04f4d9fa4db55068db1baa!}
{!LANG-18c59e33653b2fec930180508cf39f7d!}
{!LANG-17fae407ec4241f82019e1ad20f73c7d!}
{!LANG-8d2b86f9f4fb0a5ec3288f4703f4d415!}
{!LANG-a2b116f30b1a9ca8686cca35e1a86f29!}
{!LANG-e536111477ae2304d894f8db432f6469!}
{!LANG-ef3fe2e9e99865fb8bb9476cb3ed0d6b!}
{!LANG-07e7e5291ffee31bb7465bb2c245900b!}
{!LANG-7fd66882e6fe47334f86930fe230aaeb!}
{!LANG-8efd41bde5b6c73b3a1777660852509c!}
33.1. Industrial engineering
33.1.1. Enterprises and objects of the fuel industry
33.1.2. Coal industry enterprises and facilities
33.1.3. Ferrous metallurgy enterprises and facilities
33.1.4. Non-ferrous metallurgy enterprises and facilities
{!LANG-ba7b97c1366073513f627dd4c16d927a!}
{!LANG-027f637600bf16a4caf992da2db0266c!}
33.1.7. Enterprises and facilities of the forestry, woodworking, pulp and paper industries
{!LANG-21249742d8fcbc78b22682c2f304fc84!}<*>
{!LANG-3094d32daf51b45ab34c7f316bb5e838!}<*>
{!LANG-152981d9f509b58d22353f849b95cd77!}<*>
33.1.11. Thermal power plants
33.1.12. Nuclear facilities
33.1.13. Power supply facilities over 110 kV
33.1.14. Oil and gas facilities
33.2. Transport construction
33.2.1. Highways and road transport infrastructure
33.2.2. Railways and railway infrastructure facilities
33.2.3. Airports and other aviation infrastructure facilities
33.2.4. Road and rail tunnels
33.2.5. Subways
33.2.6. Bridges (large and medium)
{!LANG-db03d30e0fa0c93bda1c778bb9dd312d!}<*>
33.3. Housing and civil construction
33.4. Power supply facilities up to 110 kV inclusive
33.5. Heat supply facilities
33.6. Gas supply facilities
33.7. Water supply and sewerage facilities
33.8. Buildings and structures of communication facilities
33.9. Marine transport facilities
33.10. River transport facilities
33.11. Hydropower facilities
33.12. Dams, dams, canals, bank protection structures, reservoirs (excluding hydropower facilities)
33.13. Irrigation and drainage facilities
{!LANG-b08ba39677e12f4e2a8d08c88ad07e7c!}
{!LANG-b9cbdda7d4316daa65a311c2379dfc45!}
{!LANG-21317dd270871865ebf8fb57f09ff80d!}
{!LANG-1789bb8dee2b51ae5596e4f86da445b4!}
{!LANG-1789bb8dee2b51ae5596e4f86da445b4!}
{!LANG-ab7051e0620aa0e378c77e1f0cce30b3!}
{!LANG-5f44af1794113fa395379b14f8fc8f88!}
{!LANG-9b76157109038b3f0fb3c2da7e0d1ae9!}
{!LANG-eb4b7ab14ab5196b6c6bb86584734962!}
{!LANG-2c3c37559ca7f7fe3482a45818fc2f70!}
{!LANG-0100de6d7d3a207263b52da969128b97!}
{!LANG-2084530f2df59514ccd336b514a8ed66!}
{!LANG-77ff836eb9df28835f10015588ef9a04!}
{!LANG-e43aedc6830e23a6a93e18e067bb0c0f!}
{!LANG-8108106f49af76358e5fbc84608dbcae!}
{!LANG-2771c31243c36795e669c51fccc6203d!} {!LANG-36592f4904786dca9bffbc3b7586d327!}{!LANG-b167b8ebfe88d50e7eee7b2371b015d4!}
{!LANG-b8a6d40ce8cfc4b3694adc1aa2d4fe0e!}
{!LANG-c1b1326715fe3fc49f4dcbc211d50c5a!}
{!LANG-cc0b03d9062747cb3f93041445d7fd90!}
{!LANG-5a5d70bd163730cdba94090f7c53f75d!}
{!LANG-0f7facac93cc7f7691b377d029f47732!}
{!LANG-ae8cd1636935fc4e804379437c9a6174!}
{!LANG-b4159239fbe65f701f116c5ac90ee59e!} {!LANG-c37d80349acf6ae9bba3648890c69ecd!}{!LANG-d147cd372a0be1203bb28da2007459a6!} {!LANG-f66132b0e11116d3ad4a8b4e3a140485!}{!LANG-22fb7e290a2044339659c9c230fab2f1!}
{!LANG-85ce463223518c66ef31e03dea95bc36!} {!LANG-64d5d6a99809a2feff18c695d5ec475a!}{!LANG-89ff237782e2f0a02133cca98989c211!}
{!LANG-5c62420e91a4b007e207ac324d88075d!}
{!LANG-a4aba2ee23e8f6238e6f3a8a2ac1faa0!}
{!LANG-b8700484e5b1ad79dde6dba9b1e4ddb3!}
{!LANG-d1b34f8f6be1e04d9312c3559bd48bc5!}
{!LANG-14226e3d7ffb0b3702c19da4f6b92914!}
{!LANG-4060244b7db0874ff5db603acf028bc5!}
{!LANG-8353649b50bc4a907edef3d98e1aab8d!}{!LANG-c7314a90bcf2a40e0c601ba2c23abb4b!}
I. Types of engineering survey work
{!LANG-a36008135627fcd3360ab8f8453b4ba5!}
{!LANG-8c147351973e327f3c735b40e33bf910!}<*>
{!LANG-44c3f9de8198548a25de73f2c715cf97!}
{!LANG-52edf24523561179e0af615d69563947!}
{!LANG-122682caa72a3c6dd71f66ac0014f325!}<*>
{!LANG-4e51b4234a263f2217c4e5de0f6f3327!}<*>
8. Work on the preparation of projects for the organization of construction, demolition and dismantling of buildings and structures, extension of the service life and conservation<*>
{!LANG-ac6e6a74b3fb204d3de8b396af4b7c18!}
1. Geodetic works performed on construction sites
1.1. Layout work during construction<*>
1.2. Geodetic control of the accuracy of the geometric parameters of buildings and structures<*>
2. Preparatory work
{!LANG-9d5f6bc19e11bc8a94a44d4b7c2a3eed!}
{!LANG-5556b432f38b212e6543066a140e6f03!}<*>
2.2. Construction of temporary: roads; sites; engineering networks and structures<*>
2.4. Installation and dismantling of inventory external and internal scaffolding, technological garbage chutes<*>
3. Earthwork
3.1. Mechanized soil development<*>
3.5. Compaction with rollers, compactors or heavy rammers<*>
9. Work on the device of stone structures
9.1. Construction of buildings and structures made of natural and artificial stones, including cladding<*>
9.2. Construction of brick structures, including those with cladding<*>
9.3. Installation of heating stoves and hearths<*>
11. Installation of wooden structures
11.1. Installation, strengthening and dismantling of structural elements and enclosing structures of buildings and structures, including those made of glued structures<*>
11.2. Assembly of residential and public buildings from factory-made parts of a complete delivery<*>
12. Protection of building structures, pipelines and equipment (except for trunk and field pipelines)
12.3. Protective coating with paints and varnishes<*>
12.11. Works on thermal insulation of pipelines<*>
13. Roofing device
13.1. Installation of roofs made of piece and sheet materials<*>
13.2. Roofing from roll materials<*>
13.3. Liquid roofing device<*>
14. Facade work
14.1. Surface cladding with natural and artificial stones and linear shaped stones<*>
14.2. Ventilated facades<*>
15. Arrangement of internal engineering systems and equipment of buildings and structures
15.1. Installation and dismantling of water supply and sewerage systems<*>
15.2. Installation and dismantling of the heating system<*>
15.4. Installation and dismantling of ventilation and air conditioning systems<*>
15.5. Power supply system device<*>
15.6. Installation of electrical and other control networks for life support systems of buildings and structures<*>
{!LANG-6ee7e2832c5d7d936ba98e208cfebac2!}
{!LANG-f7300fbab63221c43576b0e713f1c9e9!}
{!LANG-dbc8b53f8d62e422d58605c9cad97115!}<*>
{!LANG-9a7efc8d7f890457e5c856fec16cf3e0!}<*>
{!LANG-2c070b366edd46f7b5df2425bf45e642!}
{!LANG-910f9fbeb61f19dd798674b7a962cecc!}
{!LANG-dfe15247f2578e52d3e55f580f739235!}<*>
{!LANG-3a9db1598da6315b343bc0e972531b02!}<*>
{!LANG-8fbd11bcbde1dab5a4a77099c91eb2a5!}<*>
{!LANG-5cd1923504ab375c46276da9f6566470!}<*>
{!LANG-5fcb081970f49ffc6397a558b62858a5!}<*>
{!LANG-c83d7becf9d49bbe11d8871f21c55f90!}<*>
{!LANG-b4bc21a34f73a65236feeb553168074e!}<*>
{!LANG-a710884eb52f52c35ab1bd62427d56d9!}<*>
{!LANG-b21703d21da25136a228754141d74d9d!}<*>
{!LANG-77598b73816bda11f104e609defea2d2!}
{!LANG-cd1dc74438506ce36d5380fb04d201b6!}<*>
{!LANG-93ae9d4896f5c7c47fd953e6d5420d4e!}<*>
{!LANG-70e7f5117fa561755ae777d9f3aa8c73!}<*>
{!LANG-265c823a40bcebd4bbe8a946b4effed5!}<*>
{!LANG-e8536006dd28205df69c1f1a339d963d!}<*>
{!LANG-5907fc78ecc24b7b93935c8d60e8b963!}<*>
{!LANG-675a1ac30e0ee8802390a1458b3f1ed9!}<*>
{!LANG-a3a8dd56a9c846a5dc8ebb3b45cb3292!}<*>
{!LANG-4fb79d869b86ade12175a38025de4d8f!}<*>
{!LANG-8efd41bde5b6c73b3a1777660852509c!}
{!LANG-21249742d8fcbc78b22682c2f304fc84!}<*>
{!LANG-3094d32daf51b45ab34c7f316bb5e838!}<*>
{!LANG-152981d9f509b58d22353f849b95cd77!}<*>
{!LANG-db03d30e0fa0c93bda1c778bb9dd312d!}<*>
{!LANG-25fdcd4f0816e735ac8e17ccaa49a5c4!} .