Sbc 99 engineering geological surveys. State estimate standard "Reference book of base prices for design work in construction" Engineering-geological and engineering-environmental surveys for construction "
Before sending an electronic appeal to the Ministry of Construction of Russia, please read the following rules for the operation of this interactive service.
1. Electronic applications within the competence of the Ministry of Construction of Russia, completed in accordance with the attached form, are accepted for consideration.
2. An electronic appeal may contain a statement, complaint, proposal or request.
3. Electronic appeals sent through the official Internet portal of the Ministry of Construction of Russia are submitted to the department for work with citizens' appeals for consideration. The Ministry ensures an objective, comprehensive and timely consideration of applications. Consideration of electronic applications is free of charge.
4. In accordance with the Federal Law of 02.05.2006 N 59-FZ "On the Procedure for Considering Appeals from Citizens of the Russian Federation" electronic appeals are registered within three days and sent, depending on the content, to the structural divisions of the Ministry. The appeal is considered within 30 days from the date of registration. An electronic appeal containing questions, the solution of which is not within the competence of the Ministry of Construction of Russia, is sent within seven days from the date of registration to the appropriate authority or to the relevant official, whose competence includes the solution of the issues raised in the appeal, with notification of this to the citizen who sent the appeal.
5. Electronic appeal is not considered when:
- absence of the name and surname of the applicant;
- indication of an incomplete or inaccurate postal address;
- presence of obscene or offensive language in the text;
- the presence in the text of a threat to the life, health and property of the official, as well as his family members;
- using a non-Cyrillic keyboard layout or only capital letters when typing;
- the absence of punctuation marks in the text, the presence of incomprehensible abbreviations;
- the presence in the text of a question to which the applicant has already been given a written answer on the merits in connection with the previously sent appeals.
6. The response to the applicant is sent to the mailing address indicated when filling out the form.
7. When considering an appeal, it is not allowed to disclose information contained in the appeal, as well as information relating to the private life of a citizen, without his consent. Information about the personal data of the applicants is stored and processed in compliance with the requirements of the Russian legislation on personal data.
8. Applications received through the site are summarized and submitted to the leadership of the Ministry for information. Answers to the most frequently asked questions are periodically published in the sections "for residents" and "for specialists"
PROJECT
OJSC "P N I I S"
Open Joint Stock Company "Production and Research Institute for Research
in construction "
Reference price guide
for engineering surveys for construction.
Geotechnical and
environmental engineering surveys
(prices are adjusted to the base level as of 01.01.2001)
Moscow 2011
UDC 624.131.3.003.13: 338.5 (083.78)
Reference book of basic prices for engineering surveys for construction.Engineering-geological and engineering-ecological surveys/ -M., PNIIIS, 2008, 230 p.
DEVELOPED by the Industrial and Research Institute for Engineering Surveys in Construction (OJSC PNIIIS), taking into account the proposals of the State Unitary Enterprise Mosgorgeotrest, OJSC Fundamentproekt, LLC NIIOSP, CJSC NiPI eg, etc.
REPLACE the Directory of basic prices for engineering surveys for construction. Engineering-geological and engineering-ecological surveys, 1999
Responsible editors - Ph.D. n. M.I. Bogdanov and head. the pricing sector S.I. Rykhlova (JSC "PNIIIS").
This document may not be reproduced in whole or in part,replicated and distributed without the permission of JSC "PNIIIS".
ISBN © JSC "PNIIIS", 2011
GENERAL INSTRUCTIONS 5
PART I. BASIC PRICES FOR RECONSTRUCTION (ROUTE) SURVEY AND ROUTE OBSERVATIONS 17
General 17
Chapter 1. Engineering-geological, engineering-hydrogeological, engineering-geocryological and engineering-ecological reconnaissance (route) survey 20
Chapter 2. Route observations performed to compile engineering-geological, engineering-hydrogeological, engineering-geocryological, engineering-ecological and soil maps of scales 1: 50,000 - 1: 500 22
PART II. BASIC PRICES FOR DRILLING WORKS 24
General provisions 24
Chapter 5. Mechanical percussion wireline drilling 37
Chapter 6. Self-propelled auger drilling of wells and boreholes and drilling with small portable 41
installations. 41
Chapter 7. Vibration drilling 46
Chapter 8. Backflush Drilling 48
PART III. BASIC PRICES FOR MINING WORKS 50
General 50
Chapter 9. Driving open-pit mine workings 54
Chapter 10. Driving underground mine workings 55
Chapter 11. Accompanying work during mining
workings 58
PART IV. BASIC PRICES FOR PILOT-FILTERING WORKS AND STATIONARY OBSERVATIONS 63
General 63
Chapter 12. Experimental filtration work 64
Chapter 13. Stationary observations 67
Chapter 14. Related Work 71
PART V. BASIC PRICES FOR FIELD SURVEYS AND SAMPLING 73
Chapter 15. Field research of soils 73
Chapter 16. Sampling 84
PART VI. BASIC PRICES FOR GEOPHYSICAL WORKS 88
General provisions 88
Chapter 17. Seismic survey and seismic acoustics 92
Chapter 18. Electrical Prospecting 101
Chapter 19. Magnetic prospecting 116
Chapter 20. Engraving 117
Chapter 21. Seismic microzoning 118
Chapter 22. Geophysical surveys in wells 120
Chapter 23. Determination of the corrosiveness of soils 122
and the intensity of stray currents 122
Chapter 24. Inspection of building structures 123
geophysical methods 123
PART VII. BASIC PRICES FOR LABORATORY WORKS AND RESEARCH 125
General provisions 125
Chapter 25. Single definitions and integrated studies (tests) of physical and mechanical properties of soils (rocks) 126
Chapter 26. Single definitions and integrated studies of the chemical composition of soils (soils) and water 148
Chapter 27. Single definitions and complex definitions 161
research of physical and mechanical properties of soil building materials 161
Chapter 28. Petrographic and lithological studies 168
PART VIII. BASIC PRICES FOR CAMERAL WORKS 174
General Provisions 174
Chapter 29. Pre-field cameral work 174
Chapter 30. Office processing of materials 179
field geotechnical, geophysical and 179
laboratory works 179
Chapter 31. Drawing up a technical report (conclusion) 187
on the results of the work performed 187
PART IX. BASIC PRICES FOR DIFFERENT WORKS AND SERVICES 188
Chapter 32. Geotechnical control and documentation 188
construction excavations 188
Chapter 33. Radiometric work 191
Chapter 34. Geodetic works 193
Chapter 35. Land reclamation 199
Chapter 36. Registration of survey works and acceptance 200
engineering survey materials 200
Chapter 37. Supporting work 202
Appendix 1. Coefficients for prices for engineering surveys carried out in desert and waterless areas) 209
Appendix 2. Duration of an unfavorable period of the year for the production of field engineering surveys) 212
Appendix 3. Regional coefficients to the wages of employees of design and survey organizations (except for survey expeditions, parties and detachments)) 218
Appendix 4. Regional coefficients to the wages of workers of prospecting expeditions, parties and detachments) 223
Appendix 5. List of regions of the Far North and localities equated to regions of the Far North) 228
GENERAL INSTRUCTIONS
1. “Reference book of basic prices for engineering surveys for construction. Engineering-geological and engineering-environmental surveys "(hereinafter referred to as the" Handbook ") is recommended for determining the base cost of engineering-geological and engineering-environmental surveys, surveys of ground construction materials and water supply sources based on groundwater, as well as hydrogeological and geophysical works at formation of prices in agreements (contracts).
2 ... This Handbook is intended for use by enterprises (organizations), regardless of departmental affiliation and organizational and legal forms:
Executors of survey work for construction, who, in accordance with the established procedure, have been granted the right to carry out them;
Customers of survey work;
Bodies supervising the execution of exploration work.
3 ... The reference book contains basic prices (hereinafter "Prices") for:
Reconnaissance (route) survey and route observations;
Drilling works;
Mining works;
Experimental filtration work;
Field research of soils and sampling;
Stationary observations;
Geophysical works;
Laboratory work and research;
Cameral work;
Various works and services;
Ancillary work.
4. Prices are calculated at the level of the estimated normative base as of 01.01.2001 according to the terms of remuneration of engineering and technical workers and workers, the cost of materials and services, as well as the amount of depreciation deductions for fixed assets, in accordance with the "Methodological Recommendations for the Composition and Accounting of Costs included in the cost of design and survey products (works, services) for construction and the formation of financial results ", approved by the Gosstroy of Russia by letter of 06.04.1994, No. BE-19-10 / 9, taking into account the changes and additions provided for by the decree of the Government of the Russian Federation dated 01.07.1995, No. 661.
5. Prices are calculated in accordance with the composition and modern technology of production of field, laboratory and office survey works, taking into account the requirements of the regulatory documents in force as of 01.01.2001, and are optimal for determining the cost of these works. Prices include overhead costs, planned savings, social deductions.
Prices for field work are provided for their performance in expeditionary conditions with the payment of travel or field allowances to workers.
Prices for office processing of survey materials and laboratory work are provided for their implementation in a hospital, i.e. without payment of travel allowances or field allowances to workers.
6. Prices are given in rubles and for certain types of work are given as a fraction: above the line - the price of field work, below the line - the price of office work. In other cases, prices are provided separately for field and office work.
The primary processing of survey materials, carried out in expeditionary conditions, is taken into account in the prices for field work.
The prices also include the costs of:
a) obtaining a technical assignment for the production of surveys;
b) preparation of contractual documentation;
c) preparation, verification of instruments, instruments, equipment and metrological assurance of the unity and accuracy of measuring instruments;
d) current repair of equipment and tools;
e) loading and unloading equipment and tools when moving on the site of work;
f) internal quality control and acceptance of survey work;
g) release of survey materials in 4 copies, including 2 copies for the customer and one copy for the body that issued the permit for the survey or carried out their registration; when issuing additional copies of reporting materials to the customer under the terms of the agreement, 3% of the cost of drawing up reporting materials is charged for each copy.
h) delivery of survey materials to the customer, as well as, in accordance with the established procedure, to the bodies that issued the permit for the survey or carried out their registration;
i) transferring stationary observation points (wells, piezometers, etc.) to the customer and issuing an acceptance certificate.
7. The prices do not include and are determined additionally according to the corresponding tables (standards) of this Handbook, the costs for:
a) inland transport;
b) external transport;
c) organization and liquidation of works at the facility;
d) selection of monoliths, bulk samples and samples for analysis for contamination by chemical and bacteriological indicators;
e) drawing up and agreeing with the customer a survey program, as well as drawing up a technical report (conclusion);
g) preparation and delivery of intermediate engineering survey materials to the customer;
h) various auxiliary work (geodetic work, land reclamation, etc.);
i) issuing, on behalf of the customer, permits (registration) for the production of engineering surveys by the forces of the organization performing the surveys;
j) installation, dismantling and maintenance of special survey equipment and special vehicles;
m) deforestation and uprooting stumps;
m) supervision (methodological guidance) of works transferred for performance by subcontractors.
8. The prices are calculated for the conditions for the production of surveys in the middle zone of the European part of the Russian Federation (in terms of wages), a favorable period of the year and a normal regime for conducting survey works.
When determining the estimated cost of surveys carried out in other regions of the Russian Federation, under a special regime, as well as in an unfavorable period of the year, the corresponding coefficients are applied to prices:
a) when performing surveys in mountainous and high-mountain areas, the coefficients given in Table 1 are applied to the prices.
Table 1
District name | Coefficient |
|
Mountain and alpine with absolute heights of the surface of the site above sea level, m: from 1500 to 1700 | ||
over 1700 "2000 | ||
b) when performing surveys in desert and waterless areas, the coefficients given in Appendix 1 are applied to the prices for these surveys;
c) when performing surveys:
In territories with a special regime, a coefficient of 1.25 is applied to the prices for field work;
In areas with radioactivity more than 1 mSv / year or 0.1 rem / year - coefficient from 1.25 to 1.5 depending on the level of radioactivity, assessed in accordance with the Radiation Safety Standards NRB-99 (GN 2.6.1.758-99) ;
At night (from 10 pm to 6 am) a coefficient of 1.35 is applied to the cost of field work;
At night, in territories with a special regime, located in areas with radioactivity of more than 1 mSv / year or 0.1 rem / year, the corresponding coefficients are multiplied.
On transit main and ring roads and main streets of city-wide significance with continuous traffic, a coefficient of 1.5 is applied to the prices for field work;
In a strictly limited period of time, no more than 4 hours per shift, that is, when "working out the window", a coefficient of 1.75 is applied to the cost of field work;
Note – Territories (water areas) with a special regime include areas and areas where, according to the situation or the established regime, interruptions or difficulties associated with the loss of working time during surveys are inevitable: border areas, training grounds, airfields, sites where blasting operations are carried out, areas with a strong dustiness of the air, existing construction sites, pits, quarries; environmentally hazardous territories and enterprises, territories of explosive, hazardous and hot workshops, territories of defense, chemical, petrochemical, metallurgical, coal and mining industries, oil and gas pumping stations of main pipelines, regime enterprises, power stations and substations, open switchgears of power stations , strips up to 200 m wide along existing power transmission lines with a voltage of 500 kV. and higher. The canvas of railways and highways, main streets (avenues) of cities, as well as streets and boulevards of large cities and megalopolises, technical zones of operating subways, the territory of railway stations, ports, backwaters, etc., where delays and interruptions in work caused by heavy traffic are inevitable transport, congestion of ships, etc.
d) when performing field exploration work, including auxiliary (tables 152-156, excluding work performed in heated rooms), as well as office and laboratory work performed in a field camp during an unfavorable period of the year (according to Appendix 2), coefficients are applied to their cost given in table 2.
table 2
Duration of adverse period, month: | Coefficient |
|
e) when performing surveys in regions of the Russian Federation, for which, in accordance with the current legislation of the Russian Federation (according to Appendices 3, 4) or in accordance with the resolution of the Council of Ministers of the RSFSR dated 04.02.91, No. 76, republican, regional, regional, etc. government or administrative authorities have established regional coefficients for the wages of workers engaged in surveys, the coefficients shown in Table 3 are applied to the total estimated cost of these surveys.
Table 3
Regional coefficient to wages | Coefficient to the total of the estimated cost of surveys |
|
Note. When new regional coefficients to the wages of workers employed in exploration work are introduced after 01.01.01 in a legislative or directive manner, the coefficients to the total of the estimated cost of surveys are determined in accordance with Table 3.
f) when conducting surveys by organizations making payments related to the provision of benefits to persons working in the Far North and equivalent areas (according to Appendix 5), as well as in other areas established by current legislation, the corresponding coefficients are applied to the total estimated cost of surveys :
1.50 - when performing surveys in the Far North;
1.25 - the same in areas equated to the regions of the Far North;
1.15 - the same in the southern regions of the Irkutsk Region, the Krasnoyarsk Territory and the Far East (Amur Region, Primorsky and Khabarovsk Territories), in the Arkhangelsk and Chita regions, the Republics of Buryatia, Karelia, Komi (except for the regions of the Far North and areas equated to regions of the Far North).
Note – With the simultaneous application of the coefficients specified in subparagraphs "e" and "f" of paragraph 8, the total multiplying coefficient to the total of the estimated cost of surveys is determined by summing the unit with the fractional parts of the corresponding coefficients in Table 3 and subparagraph "e".
9 ... Inland transport costs associated with the transportation of surveyors, equipment and materials from the location of the survey organization (expedition, party, detachment) to the survey site and back, and directly on the site of work are determined according to Table 4 as a percentage of the estimated cost of field survey work (main and auxiliary), as well as office and laboratory work performed in a field camp (taking into account the coefficients given in subparagraphs 8 "a", "b", "c", "d" of the General Instructions), including the costs of maintaining survey bases, radio stations, as well as installation, dismantling and maintenance of survey equipment, determined at the prices of tables 152 and 153.
Table 4
Distance from the base of the survey organization (expedition, party or detachment) to the survey site, km | Inland transport costs,%, at the estimated cost of field exploration works, thousand rubles |
|||||
State Committee of the Russian Federation
on housing and construction policy
(Gosstroy of Russia)
Reference price guide
for geotechnical and environmental engineering
surveys for construction
UDC 624.131.3.003.13: 338.5 (083.78)
DEVELOPED by the Industrial and Research Institute for Engineering Surveys in Construction (PNIIIS), Institute Hydroproject JSC, Ingeodin SPC, with the participation of the Committee for Architecture and Urban Planning of the Krasnodar Territory, Research Institute of Building Physics of the Russian Academy of Architecture and Construction Sciences.
INTRODUCED by the Department for the Development of Scientific and Technical Policy and Design and Survey Works of the Gosstroy of Russia
APPROVED by the State Committee of the Russian Federation for Housing and Construction Policy (letter dated June 22, 1998, No. 9-4 / 84).
ACCEPTED AND INTRODUCED INTO ACTION from 01.01.1999 to replace chapters 12, 14, 15 and table 298 of chapter 17 of the Compendium of prices for exploration work for capital construction, 1982; Directory of basic prices for laboratory geotechnical works, 1996 g .; Reference book of base prices for drilling works during engineering-geological surveys for construction, 1997; Reference book of basic prices for cameral engineering-geological works, 1997.
GENERAL INSTRUCTIONS
1. Reference book of base prices for engineering-geological and engineering-environmental surveys for construction (hereinafter referred to as the "Handbook") is recommended for determining the base cost of engineering-geological and engineering-environmental surveys, surveys of ground construction materials and water supply sources based on groundwater at formation of prices in agreements (contracts).
2. This Handbook is intended for use by enterprises (organizations) of various organizational and legal forms that carry out survey work and have a license to carry it out.
3. The reference book contains basic prices (hereinafter "Prices") for:
Reconnaissance (route) survey and route observations;
Drilling works;
Mining works;
Experimental filtration work, field studies of soils and sampling;
Laboratory work and research;
Cameral work;
Various works and services;
Ancillary work.
4. Prices are calculated on the basis of the official salaries of engineers and technicians, wage rates for workers, the cost of materials and services, depreciation rates for fixed assets as of 01.01.91, taking into account the main provisions on the composition of costs included in the cost of production (work, services) with changes and additions provided for by the decree of the Government of the Russian Federation dated 01.07.95 No. 661.
5. Prices are calculated in accordance with the composition, volume and technology of production of field and office work, ensuring the creation of reporting documentation that meets the requirements of GOSTs and current regulatory documents (approved or agreed by the Gosstroy of Russia), and are optimal for determining the cost of these works.
The prices for field work are provided for the performance of these works in expeditionary conditions, i.e. with the payment of travel or field allowances to workers.
Prices for office processing of survey materials and laboratory work are provided for their implementation in a hospital, i.e. without payment of travel allowances or field allowances to workers.
6. Prices are given in rubles and for certain types of work are given as a fraction: above the line - the price of field work, below the line - the price of office work. In other cases, prices are provided separately for field and office work.
The primary processing of survey materials, carried out in expeditionary conditions, is taken into account in the prices for field work.
The prices also include the costs of:
a) obtaining a technical assignment for the production of surveys;
b) agreement with the customer of the program (prescription) of surveys and preparation of contractual documentation;
c) preparation, verification of instruments, instruments, equipment and metrological assurance of the unity and accuracy of measuring instruments;
d) internal control and acceptance of survey materials;
e) delivery of survey materials to the customer.
7. The prices are not taken into account and are determined additionally according to the corresponding tables (standards) of this Handbook and the following costs are provided for in the estimates:
a) inland transport;
b) external transport;
c) organization and liquidation of works at the facility;
d) selection of monoliths, bulk samples and samples for analysis for contamination by chemical and bacteriological indicators;
e) drawing up and agreeing with the customer a survey program (prescription), as well as drawing up and issuing a technical report (conclusion) to the customer;
f) preparation and delivery of intermediate engineering survey materials to the customer;
g) various auxiliary work (geotechnical control, radiometric work, geodetic work, etc.);
h) registration of permits (registration) for the production of engineering surveys;
i) land reclamation;
k) installation, dismantling and maintenance (rent) of special survey equipment.
8. Prices are calculated for the conditions for the production of surveys in the middle zone of the European part of the Russian Federation (in terms of wages), a favorable period of the year and a normal regime for conducting survey works.
When determining the estimated cost of surveys carried out in other regions of the Russian Federation, as well as in an unfavorable period of the year, the corresponding coefficients are applied to the prices:
a) when performing surveys in mountainous and high-mountain areas, the coefficients given in Table 1 are applied to the prices.
Table 1
District name |
Coefficient |
|
Mountain and alpine with absolute heights of the surface of the site above sea level, m: |
||
from 1500 to 1700 |
||
over 1700 "2000 |
1,15 |
|
" 2000 " 3000 |
1,20 |
|
over 3000 |
1,25 |
b) when performing surveys in desert and waterless areas, the coefficients given in Appendix 1 are applied to the prices for these surveys;
c) when performing surveys in territories with a special regime, a coefficient of 1.25 is applied to the prices for field work, and in areas with radioactivity more than 1 mSv / year or 0.1 rem / year - a coefficient from 1.25 to 1.5, depending on the level of radioactivity, assessed in accordance with the Radiation Safety Standards NRB-96 (GN 2.6.1.054-96).
Note - Territories with a special regime include areas and areas where, according to the situation or the established regime, interruptions or difficulties associated with the loss of working time during exploration are inevitable: border areas, test ranges, airfields, construction sites where blasting operations are carried out, areas with a strong dusty air (construction sites, quarries, etc.), environmentally harmful areas, internal areas of explosive, harmful and hot workshops of enterprises of the defense, chemical, metallurgical, coal and mining industries, operating power plants and substations, open switchgears of power plants, strips with a width of up to 200 m of existing power transmission lines with a voltage of 500 kV. and higher. The canvas of railways and highways, main streets (avenues) of cities, the territory of railway stations, ports, etc., where delays and interruptions in work caused by heavy traffic, etc. are inevitable.
d) when performing field survey work in an unfavorable period of the year in the relevant areas (according to Appendix 2), the coefficients given in Table 2 are applied to their cost.
table 2
Duration of the unfavorable period, months: |
Coefficient |
|
2-3,5 |
||
4-5,5 |
||
6-7,5 |
||
8-9,5 |
e) when performing surveys in regions of the Russian Federation, for which, in accordance with the current legislation of the Russian Federation (according to Appendices 3, 4) or in accordance with the resolution of the Council of Ministers of the RSFSR dated 04.02.91, No. 76, republican, regional, regional, etc. government or administrative authorities have established regional coefficients for the wages of workers engaged in surveys, the coefficients shown in Table 3 are applied to the total estimated cost of these surveys.
Table 3
Regional coefficient to wages |
Coefficient to the total estimated cost of surveys |
|
1,10 |
1,05 |
|
1,15 |
1,08 |
|
1,20 |
1,10 |
|
1.25 |
1,13 |
|
1,30 |
1,15 |
|
1,40 |
1,20 |
|
1,50 |
1,25 |
|
1,60 |
1,30 |
|
1,70 |
1,35 |
|
1,80 |
1,40 |
|
1,90 |
1,45 |
|
2,00 |
1,50 |
Note - When new regional coefficients to wages are introduced after 01.07.98 in a legislative or directive manner, the coefficients to the total of the estimated cost of surveys are determined in accordance with Table 3.
f) when conducting surveys by organizations making payments related to the provision of benefits to persons working in the Far North and equivalent areas (according to Appendix 5), as well as in other areas established by current legislation, the corresponding coefficients are applied to the total estimated cost of surveys :
1.50 - when performing surveys in the Far North;
1.25 - the same in areas equated to the regions of the Far North;
1.15 - in the southern regions of the Irkutsk region, the Krasnoyarsk region and the Far East (Amur region, Primorsky and Khabarovsk regions), in the Arkhangelsk and Chita regions. Republics of Buryatia, Karelia, Komi (except for the regions of the Far North and areas equated to the regions of the Far North).
Note - With the simultaneous application of the coefficients specified in subparagraphs "e" and "f" of paragraph 8, the total multiplying coefficient to the total of the estimated cost of surveys is determined by summing the unit with the fractional parts of the corresponding coefficients in Table 3 and subparagraph "e".
9. The costs of inland transport are determined according to Table 4 as a percentage of the estimated cost of field exploration work (taking into account the coefficients given in subparagraphs 8 a, b, c, d of the General Instructions), including the costs of maintaining bases, radio stations, as well as installation, dismantling and maintenance of prospecting equipment, determined according to tables 100 and 101.
Table 4
Distance from the base of the survey organization, expedition, party or detachment |
Internal transport costs,% at estimated cost of field and survey work, thousand roubles |
|||||
to the survey site, km: |
up to 5 |
St. 5 to 10 |
St. 10 to 20 |
St. 20 to 50 |
over 50 |
|
up to 5 |
8,75 |
6,25 |
3,75 |
|||
St. 5 to 10 |
11,25 |
10,0 |
8,75 |
6,25 |
||
"10 "15 |
13,75 |
12,5 |
11,25 |
10,0 |
8,75 |
|
" 15"20 |
16,25 |
15,0 |
13,75 |
12,5 |
11,25 |
|
" 20" 25 |
18,75 |
17,5 |
16,25 |
15,0 |
13,75 |
Notes. 1. Expenses for internal transport are allowed to be determined based on actual costs in prices of the current period:
a) with an estimated cost of field exploration work up to 5 thousand rubles;
b) when the survey site is removed from the base of the survey organization, expedition, party or detachment at a distance of more than 25 km;
c) when performing field survey work in the regions of the Far North and equivalent areas, in sparsely populated (uninhabited) areas (alpine, desert, taiga, tundra), when the survey site is removed from the base of a survey organization, expedition, party or detachment at a distance of up to 25 km;
d) related to the rental and maintenance of special vehicles - airplanes, helicopters, all-terrain vehicles, boats, barges, longboats, reindeer and dog teams, camels, horse packs, etc.
2. In the case of determining costs in the prices of the current period, the standards of Table 4 are not applied.
10. Expenses for external transport associated with the travel of workers and transportation of survey equipment and cargo from the permanent location of the organization performing the survey to the base of the survey expedition, party or detachment (or to the survey site) and vice versa, are determined according to Table 5 as a percentage of the estimated the cost of field exploration work (taking into account the coefficients given in subparagraphs 8 a, b, c, d of the General Instructions), including the costs of inland transport, determined according to table 4 (excluding the costs provided for in note 1 of table 4), as well as the costs of maintenance of bases and radio stations, installation, dismantling and maintenance of survey equipment, determined according to tables 100 and 101.
Table 5
Distance of travel and transportation in one direction, km: |
External transport consumption in both directions,% of the estimated cost of surveys carried out in expeditionary conditions, duration, months |
||||||
up to 1 |
12 and more |
||||||
St. 25 to 100 |
14,0 |
11,5 |
|||||
" 100 " 300 |
19,6 |
15,4 |
12,7 |
||||
" 300" 500 |
25,2 |
21,0 |
16,8 |
||||
" 500" 1000 |
30,8 |
25,2 |
19,6 |
||||
" 1000 "2000 |
36,4 |
32,2 |
28,0 |
13,2 |
|||
over 2000 |
39,2 |
36,4 |
20,0 |
16,0 |
12,0 |
Notes: 1. Costs for external transport at distances up to 25 km are not included in the estimates.
2. When performing certain types of surveys costing up to 5 thousand rubles. or the presence of unfavorable conditions for the passage of workers and the carriage of goods to hard-to-reach areas of research and back, the costs of external transport can be determined based on actual costs in prices of the current period.
3. Expenses for external transport in executive estimates may be determined in prices of the current period.
4. In the case of determining costs in the prices of the current period, the norms of Table 5 are not applied.
11. When carrying out surveys in especially difficult natural conditions (on the polar islands, in the glacier zone, in the alpine, desert, taiga and tundra regions), special events (attracting instructor-climbers and guides, organizing a rescue service, etc.) may be envisaged. additional costs, which are determined by the actual costs in the prices of the current period.
12. Determined by the actual costs (price lists, tariffs, invoices, etc.) in the prices of the current period and additionally taken into account in the cost of surveys costs associated with:
Obtaining (acquiring) initial data and information about natural conditions, aerial photography, cartographic and other materials from previous surveys;
Carrying out the necessary approvals related to the production of certain types of field work (location of mine workings, boreholes, points of experimental work, etc.);
The production of special types of analyzes and studies of soil and soil samples, bottom sediments, surface and ground waters of snow and ice, performed by specialized laboratories licensed to carry out such work (bacteriological analysis, complete tests of aggregates in concrete, radiochemistry of isotopes, etc.) ;
Payment of the cost of casing pipes, filter strings and other materials left in wells during drilling for water and for carrying out stationary observations;
Purchase of a logging ticket; compensation for material damage associated with deforestation during surveys;
Compensation to land users for material damage caused in connection with losses and surveys on their land plots;
Payment for the services of third-party organizations necessary for the production of surveys.
13. The costs of organizing and eliminating work at the facility are determined at the rate of 6% of the estimated cost of field survey work, taking into account the coefficients given in subparagraphs 8 a, b, c, d of the General Instructions, including the costs of inland transport, determined according to table 4 , (except for the costs provided for in Note 1 of Table 4), as well as the costs of maintaining bases and radio stations, installation, dismantling and maintenance of prospecting equipment, determined according to Tables 100 and 101.
Notes: 1. The following coefficients are applied to the amount of expenses for the organization and liquidation of works, determined in clause 13:
2.5 - for surveys with an estimated cost of up to 2 thousand rubles. or during surveys (regardless of their cost) carried out in the Far North and equivalent areas, as well as in sparsely populated (uninhabited) areas (high-mountainous, desert, taiga and tundra):
2.0 - for surveys with an estimated cost of more than 2 to 5 thousand rubles;
1.5 - the same, over 5 to 10 thousand rubles.
2. When performing field surveys at the facility continuously for more than one year, the coefficients given in Table 6 should be applied to the costs of organizing and eliminating works.
Table 6
Duration of field surveys, months: |
Coefficient |
|
St. 12 to 16 |
||
" 16" 20 |
||
" 20" 24 |
||
St. 24 |
14. When carrying out field work without paying workers travel allowances or field allowances, a coefficient of 0.85 should be applied to the prices for these works.
When performing office processing of survey materials and performing laboratory work in expeditionary conditions (with payment of field allowances or travel expenses), a coefficient of 1.15 is applied to the prices for these works.
15. If it is necessary to issue to the customer intermediate survey materials (if it is provided for by the terms of reference, the program), a coefficient of 1.1 is applied to the cost of these surveys (except for the costs specified in clauses 9-13).
16. When applied to prices (cost) of several coefficients established by the Directory, the latter are multiplied (except for the coefficients of subparagraphs "e" and "f" of paragraph 8).
17. The estimate attached to the contract provides for additional costs for work and services listed in clause 12 of the General Instructions, as well as unforeseen costs associated with plugging wells, construction of temporary buildings and structures (foundations for tents, crossings over ditches and ditches, installation of stairs on steep slopes, sheds, courtyard latrines, berths for boats and boats, etc.) in the amount of at least 10% of the estimated cost of survey work.
18. The prices of this Handbook are given to the average level of costs as of 01.01.91. Bringing the base cost of engineering surveys to the price level of the current period is carried out by applying the inflation index to this cost, which is determined in accordance with the established procedure.
19. The inflation index is not applied to expenses determined by actual expenses. Costs that are priced in the current period are included in a separate estimate.
PART I. BASIC PRICES FOR RECONSTRUCTION (ROUTE) SURVEY AND ROUTE OBSERVATIONS
General Provisions
1. This part shows basic prices for:
engineering-geological, (hydrogeological and engineering-ecological reconnaissance (route) survey;
route observations carried out in the preparation of engineering-geological, engineering-hydrogeological, engineering-ecological and soil maps of scales 1: 50000 1: 500.
2. Prices are developed for the following categories of complexity of engineering and geological conditions.
Table 7
Factors |
|||
Geomorphological conditions |
Site (site) within one geomorphological element. The surface is horizontal, undivided |
Site (site) within several geomorphological elements of the same genesis. The surface is inclined, slightly dissected. |
Site (site) within several geomorphological elements of different genesis. The surface is highly dissected. |
Geological in the field of interaction of buildings and structures with the geological environment |
No more than two layers of different lithology, lying horizontally or slightly obliquely (slope no more than 0.1). The thickness is sustained along the strike. An insignificant degree of layer heterogeneity in terms of soil properties, irregularly changing in plan and depth. Rocky soils lie from the surface or are covered by a thin layer of non-rocky soils. |
No more than four layers of different lithology, inclined or pinched out. Power changes naturally. A significant change in the characteristics of soil properties in plan or in depth. Rocky soils have an uneven roof and are covered with non-rocky soils. |
More than four layers of different lithology. The power changes dramatically. Lenticular bedding of layers. A significant degree of heterogeneity in terms of soil properties, changing in plan or depth. Rocky soils have a highly dissected roof and are covered with non-rocky soils. There are faults of various orders. |
Hydrogeological in the field of interaction of buildings and structures with the geological environment |
Groundwater is absent or there is one consistent groundwater horizon with a homogeneous chemical composition. |
Two or more persistent underground water horizons, in places with a heterogeneous chemical composition or having a pressure and containing pollution. |
Groundwater horizons are not consistent in strike and thickness, with a heterogeneous chemical composition or various pollution. In some places, there is a complex alternation of aquifers and water-resistant rocks. Groundwater heads and their hydraulic connections vary along the strike. |
Geological and engineering-geological processes that negatively affect the conditions of construction and operation of buildings and structures |
None. |
||
Specific soils in the field of interaction of buildings and structures with the geological environment |
None. |
They are of limited distribution and (or) do not have a significant impact on the choice of design solutions, construction and operation of facilities. |
They are widespread and (or) have a decisive influence on the choice of design solutions, construction and operation of facilities. |
Technogenic impacts and changes in developed territories |
Insignificant and may not be taken into account in engineering and geological surveys and design. |
They do not have a significant impact on the choice of design solutions and the conduct of engineering and geological surveys. |
They have a significant impact on the choice of design solutions and complicate the production of geotechnical surveys in terms of increasing their composition and scope of work. |
Notes: 1. The category of complexity of geotechnical conditions should be established by a combination of factors. If any single factor belongs to a higher category of complexity and is decisive in making the main design decisions, then the category of complexity should be established by this factor.
Category I. - Areas with uniform soil cover; soil complexes occupy no more than 15% of the area; swamps, wetlands and saline soils occupy no more than 5% of the area (mainly steppe regions).
II category. - Areas with heterogeneous soil cover; varied soil-forming rocks, variable vegetation and dissected relief; soil complexes occupy up to 30% of the territory; swamps and wetlands occupy no more than 20% of the area (mainly forest-steppe and steppe regions).
III category. - Areas with a very heterogeneous soil cover: the spread of rocky, pebble and gravelly soils; swamps, wetlands and saline lands occupy more than 20% of the area (deserts, semi-deserts, dry steppes, forest areas, forest-tundra, tundra, floodplains, floodplains and deltas).
3. Prices for field work take into account the following terrain passability conditions.
Table 8
Cross-country characteristics |
|
I (good) |
Slightly dissected or hilly terrain, river valleys and gullies are well traversed. The road network is well developed |
II (satisfactory) |
Rugged relief with relative elevations up to 500 m with slope steepness up to 20 °. Forested plain areas, slightly wetlands. The road network is poorly developed. |
III (bad) |
Mountainous relief without glaciers and hard-to-reach rocky ridges with relative elevations of more than 500 m and a steepness of slopes over 20 °. The network of ravines, drains, irrigation and drainage networks is intensively developed. The territories are highly swampy, taiga, tundra, saline, desert with semi-fixed sand. |
Note - The cost of field work carried out on the territory of mountainous regions with rugged serrated and rocky ridges and glaciers, peaked peaks, dangerous passes, turbulent mountain rivers, as well as in desert areas with loose sands and dunes, may be determined by actual costs in prices of the current period.
4. The prices do not take into account and are determined additionally according to the corresponding tables of this Handbook, the costs of drilling wells with a portable drilling kit, digging holes, drilling holes, as well as taking monoliths and samples for analysis for contamination by chemical and bacteriological indicators.
Chapter 1. Engineering-geological,
hydrogeological engineering and environmental engineering
reconnaissance (route) survey
1. This chapter provides basic prices for engineering-geological, engineering-hydrogeological, engineering-ecological and soil reconnaissance (route) survey.
2. Prices include the costs of the following works.
Field work: inspection of the survey site, adjacent territory, visual assessment of the relief, production of a complex of geological, geomorphological, hydrogeological, ecological and soil observations along the selected route (keeping field records), side routes for visual inspection, collection of questionnaires, clarification of the conditions for the production of surveys.
Cameral work: preliminary acquaintance with the work area on the map, selection of route directions, processing and systematization of entries in field diaries, systematization of survey data, compilation of a catalog of survey points and a schematic geotechnical (hydrogeological, ecological, soil) map of the surveyed territory on an optimal scale, allocation of areas for more detailed research, registration of materials in conjunction with the data of pre-field interpretation, preparation of an explanatory note (conclusion).
3. Prices for a reconnaissance survey are shown in table 9.
Gauge - 1 km of route Table 9
Name of works |
||||
Engineering-geological, hydrogeological reconnaissance at passability: |
||||
good |
18,3 13,5 |
23,3 18,5 |
28,3 23,4 |
|
satisfactory |
20,4 13,5 |
27,0 18,5 |
36,0 23,4 |
|
bad |
28,5 13,5 |
37,6 18,5 |
47,2 23,4 |
|
Reconnaissance soil survey with patency: |
||||
good |
2,57 1,27 |
3,24 1,69 |
4,96 2,41 |
|
satisfactory |
Comprehensive geological surveys on the construction site are carried out to obtain up-to-date information on the relief, bearing capacity of soils and the nature of groundwater, their chemical composition, and corrosiveness.
Also, the totality of these works is aimed at determining the presence of hidden dangerous geological processes: landslides, flooding, karst formations. Based on the survey results, a Technical Report is drawn up, which, in addition to describing the conditions, includes:
- forecast of possible changes in the geological environment at a specific site;
- recommendations for design and construction.
Graphic materials are attached to the Technical Report in the form of maps, diagrams, drawings, graphs.
List of geological works
The following works are included in the geotechnical survey:
The work is carried out in a clear sequence, in accordance with the established requirements and standards of SNiP. Includes preparatory, field, laboratory and office stages.
Scope of work when updating engineering and geological surveys
The procedure has a more simplified form, when a previous expired Technical Report is already present on hand. To obtain a permit for the construction of industrial complexes, multi-storey buildings and linear structures, it is valid for 3 years, for private houses and cottages - up to 10 years. This Technical Report is subject to updating, that is, it does not require full research, which, in turn, reduces the time and cost of research. You can order this service from specialists.
To obtain updated data, geological engineers take samples from control wells, conduct laboratory analyzes and compare the information received. If changes are detected in the geological conditions of the site, when dangerous geological processes are detected, appropriate adjustments are made and recommendations are provided. The new report is sent for examination to the regulatory authorities.
Using data from outdated surveys has unpredictable consequences:
- uneven building settlement;
- deformation of door and window openings;
- the formation of cracks and cracks;
- destruction of the foundation.
Video: Geotechnical survey
State Committee of the Russian Federation
on housing and construction policy
(Gosstroy of Russia)
Reference price guide
for geotechnical and
environmental engineering
surveys for construction
(prices are adjusted to the base level as of 01.01.1991)
Moscow 1999
DEVELOPED by the Industrial and Research Institute for Engineering Surveys in Construction (PNIIIS), Institute Hydroproject JSC, SPC Ingeodin, with the participation of the Committee for Architecture and Urban Planning of the Krasnodar Territory, Research Institute of Building Physics of the Russian Academy of Architecture and Construction Sciences.
INTRODUCED by the Department for the Development of Scientific and Technical Policy and Design and Survey Works of the Gosstroy of Russia
APPROVED by the State Committee of the Russian Federation for Housing and Construction Policy (letter dated June 22, 1998, No. 9-4 / 84).
ACCEPTED AND PUT INTO ACTION from 01.01.1999
Replaces Chapters 12, 14, 15 and Table 198, Chapter 17 of the Capital Construction Survey Prices, 1982; Reference book of base prices for laboratory geotechnical works, 1996; Reference book of base prices for drilling works in engineering and geological surveys for construction, 1997; Handbook of basic prices for office geotechnical works, 1997
GENERAL INSTRUCTIONS PART I. BASIC PRICES FOR RECONSTRUCTION (ROUTE) SURVEY AND ROUTE OBSERVATIONS General Provisions Chapter 1. Engineering-geological, engineering-hydrogeological and engineering-ecological reconnaissance (route) survey Chapter 2. Route observations carried out in the preparation of engineering-geological, engineering-hydrogeological and engineering-ecological maps of scales 1: 50,000 - 1: 500 PART II. BASIC PRICES FOR DRILLING WORKS General Provisions Chapter 3. Manual drilling and drilling with portable drilling rigs Chapter 4. Core drilling Chapter 5. Mechanical percussion-rope drilling Chapter 6. Auger drilling of wells and pits Chapter 7. Vibration drilling Chapter 8. Backflush drilling PART III. BASIC PRICES FOR MINING WORKS General Provisions Chapter 9. Driving open mine workings Chapter 10. Driving underground mine workings Chapter 11. Accompanying work when driving mine workings PART IV. BASIC PRICES FOR EXPERIMENTAL FILTERING WORKS AND STATIONARY OBSERVATIONS General Provisions Chapter 12. Experimental filtration work Chapter 13. Stationary observations Chapter 14. Related work PART V. SOIL FIELD SURVEY AND SAMPLING Chapter 15. Field studies of soils Chapter 16. Sampling PART VI. BASIC PRICES FOR LABORATORY WORKS AND RESEARCH General Provisions Chapter 17. Single definitions and integrated studies (tests) of physical and mechanical properties of soils (rocks) Chapter 18. Single definitions complex studies of the chemical composition of soils (soils) and water Chapter 19. Single definitions and comprehensive studies of the physical and mechanical properties of soil building materials PART VII. BASIC PRICES FOR CAMERAL WORKS General Provisions Chapter 20. Pre-field office work Chapter 21. Office processing of field and laboratory work materials Chapter 22. Drawing up a technical report (conclusion) on the results of the work performed PART VIII. BASIC PRICES FOR DIFFERENT WORKS AND SERVICES Chapter 23. Geotechnical control and documentation of construction excavations Chapter 24. Radiometric work Chapter 25. Geodetic works Chapter 26. Land reclamation Chapter 27. Registration of survey work and acceptance of engineering survey materials Chapter 28. Supporting work Appendix 1. Coefficients for prices for engineering surveys carried out in desert and waterless areas *) Appendix 2. Duration of an unfavorable period of the year for the production of field engineering surveys Appendix 3. Regional coefficients to the wages of employees of design and survey organizations (except for survey expeditions, parties and detachments) *) Appendix 4. Regional coefficients to the wages of workers of prospecting expeditions, parties and detachments *) Appendix 5. List of regions of the Far North and localities equated to regions of the Far North *) |
GENERAL INSTRUCTIONS
1. Reference book of base prices for engineering-geological and engineering-environmental surveys for construction (hereinafter referred to as the "Reference") is recommended for determining the base cost of engineering-geological and engineering-environmental surveys, surveys of ground construction materials and water supply sources based on groundwater formation of prices in agreements (contracts).
2. This Handbook is intended for use by enterprises (organizations) of various organizational and legal forms that carry out survey work and have a license to carry it out.
Reconnaissance (route) survey and route observations;
Drilling works;
Mining works;
Experimental filtration work, field studies of soils and sampling;
Laboratory work and research;
Cameral work;
Various works and services;
Ancillary work.
4. Prices are calculated on the basis of the official salaries of engineering and technical workers, wage rates of workers, the cost of materials and services, depreciation rates for fixed assets as of 01.01.91, taking into account the main provisions on the composition of costs included in the cost of products (works, services) with amendments and additions stipulated by the decree of the Government of the Russian Federation dated 01.07.95 No. 661.
5. Prices are calculated in accordance with the composition, volume and technology of production of field and office work, ensuring the creation of reporting documentation that meets the requirements of GOSTs and current regulatory documents (approved or agreed by the Gosstroy of Russia), and are optimal for determining the cost of these works.
The prices for field work are provided for the performance of these works in expeditionary conditions, i.e. with the payment of travel or field allowances to workers.
Prices for office processing of survey materials and laboratory work are provided for their implementation in a hospital, i.e. without payment of travel allowances or field allowances to workers.
6. Prices are given in rubles and for certain types of work are given as a fraction: above the line - the price of field work, below the line - the price of office work. In other cases, prices are provided separately for field and office work.
The primary processing of survey materials, carried out in expeditionary conditions, is taken into account in the prices for field work. The prices also include the costs of:
a) obtaining a technical assignment for the production of surveys;
b) agreement with the customer of the program (prescription) of surveys and preparation of contractual documentation;
c) preparation, verification of instruments, instruments, equipment and metrological assurance of the unity and accuracy of measuring instruments;
d) internal control and acceptance of survey materials;
e) delivery of survey materials to the customer.
7. The prices are not taken into account and are determined additionally according to the corresponding tables (standards) of this Handbook and the following costs are provided for in the estimates:
a) inland transport;
b) external transport;
c) organization and liquidation of works at the facility;
d) selection of monoliths, bulk samples and samples for analysis for contamination by chemical and bacteriological indicators;
e) drawing up and agreeing with the customer a survey program (prescription), as well as drawing up and issuing a technical report (conclusion) to the customer;
f) preparation and delivery of intermediate engineering survey materials to the customer;
g) various auxiliary work (geotechnical control, radiometric work, geodetic work, etc.);
h) registration of permits (registration) for the production of engineering surveys;
i) land reclamation;
k) installation, dismantling and maintenance (rent) of special survey equipment.
8. Prices are calculated for the conditions for the production of surveys in the middle zone of the European part of the Russian Federation (in terms of wages), a favorable period of the year and a normal regime for conducting survey works.
When determining the estimated cost of surveys carried out in other regions of the Russian Federation, as well as in an unfavorable period of the year, the corresponding coefficients are applied to the prices:
a) when performing surveys in mountainous and high-mountain areas, the coefficients given in Table 1 are applied to the prices.
Table 1
b) when performing surveys in desert and waterless areas, the coefficients given in Appendix 1 are applied to the prices for these surveys;
c) when performing surveys in territories with a special regime, a coefficient of 1.25 is applied to the prices for field work, and in areas with radioactivity of more than 1 m 3 per year or 0.1 rem / year - a coefficient from 1.25 to 1.5 depending on the level of radioactivity, assessed in accordance with the Radiation Safety Standards NRB-96 (GN 2.6.1.054-96).
Note - Territories with a special regime include areas and areas where, according to the situation or the established regime, interruptions or difficulties associated with the loss of working time during surveys are inevitable: border areas, landfills, airfields, construction sites where blasting operations are carried out, areas with strong dusty air (construction sites, quarries, etc.), environmentally harmful areas, internal areas of explosive, harmful and hot workshops of enterprises of the defense, chemical, metallurgical, coal and mining industries, operating power plants and substations, open switchgears of power plants, strips with a width of up to 200 m of existing power transmission lines with a voltage of 500 kV. and higher. The canvas of railways and highways, main streets (avenues) of cities, the territory of railway stations, ports, etc., where delays and interruptions in work caused by heavy traffic, etc. are inevitable.
d) when performing field survey work in an unfavorable period of the year in the relevant areas (according to Appendix 2), the coefficients given in Table 2 are applied to their cost.
table 2
Duration of the unfavorable period, months: | Coefficient |
|
e) when performing surveys in regions of the Russian Federation, for which, in accordance with the current legislation of the Russian Federation (according to Appendices 3, 4) or in accordance with the resolution of the Council of Ministers of the RSFSR dated 04.02.91, No. 76, republican, regional, regional, etc. government or administrative authorities have established regional coefficients for the wages of workers engaged in surveys, the coefficients shown in Table 3 are applied to the total estimated cost of these surveys.
Table 3
Regional coefficient to wages | Coefficient to the total of the estimated cost of surveys |
|
Note - When new regional coefficients to wages are introduced after 07/01/98 in a legislative or directive manner, the coefficients to the total of the estimated cost of surveys are determined in accordance with Table 3.
c) when conducting surveys by organizations making payments related to the provision of benefits to persons working in the Far North and equivalent areas (according to Appendix 5), as well as in other areas established by current legislation, the corresponding coefficients are applied to the total estimated cost of surveys :
1.50 - when performing surveys in the Far North;
1.25 - the same in areas equated to the regions of the Far North;
1.15 - in the southern regions of the Irkutsk Region, the Krasnoyarsk Territory and the Far East (Amur Region, Primorsky and Khabarovsk Territories), in the Arkhangelsk and Chita Regions, the Republics of Buryatia, Karelia, Komi (except for the regions of the Far North and areas equated to the Far North).
Note - With the simultaneous application of the coefficients specified in subparagraphs "e" and "f" of paragraph 8, the total multiplying coefficient to the total of the estimated cost of surveys is determined by summing the unit with the fractional parts of the corresponding coefficients of Table 3 and subparagraph "e".
9. The costs of inland transport are determined according to Table 4 as a percentage of the estimated cost of field exploration work (taking into account the coefficients given in subparagraphs 8 a, b, c, d of the General Instructions), including the costs of maintaining bases, radio stations, as well as installation, dismantling and maintenance of prospecting equipment, determined according to tables 100 and 101.
Table 4
Distance from the base of the survey organization, expedition, party or detachment to the survey site, km: | Internal transport costs,%, with the estimated cost of field survey work, thousand rubles |
|||||
St. 5 to 10 | St. 10 to 20 | St. 20 to 50 | ||||
- "- 10 -" - 15 | ||||||
- "- 15 -" - 20 | ||||||
- "- 20 -" - 25 |
Notes: 1. Expenses for inland transport can be determined based on actual costs in prices of the current period:
a) with an estimated cost of field exploration work up to 5 thousand rubles;
b) when the survey site is removed from the base of the survey organization, expedition, party or detachment at a distance of more than 25 km;
c) when performing field survey work in the regions of the Far North and equivalent areas, in sparsely populated (uninhabited) areas (alpine, desert, taiga, tundra), when the survey site is removed from the base of a survey organization, expedition, party or detachment at a distance of up to 25 km;
d) related to the rental and maintenance of special vehicles - airplanes, helicopters, all-terrain vehicles, boats, barges, longboats, reindeer and dog teams, camels, horse packs, etc.
2. In the case of determining costs in the prices of the current period, the standards of Table 4 are not applied.
10. Expenses for external transport associated with the travel of workers and transportation of survey equipment and cargo from the permanent location of the organization performing the survey to the base of the survey expedition, party or detachment (or to the survey site) and vice versa, are determined according to Table 5 as a percentage of the estimated the cost of field exploration work (taking into account the coefficients given in subparagraphs 8 a, b, c, d of the General Instructions), including the costs of inland transport, determined according to table 4 (excluding the costs provided for in note 1 of table 4), as well as the costs of maintenance of bases and radio stations, installation, dismantling and maintenance of survey equipment, determined according to tables 100 and 101.
Table 5
Distance of travel and transportation in one direction, km: | Expenses for external transport in both directions,% of the estimated cost of surveys carried out in expeditionary conditions, duration, months. | |||||||
12 and more | ||||||||
St. 25 to 100 | ||||||||
- "- 100 -" - 300 | ||||||||
- "- 300 -" - 500 | ||||||||
- "- 500 -" - 1000 | ||||||||
- "- 1000 -" - 2000 | ||||||||
Notes: 1. Costs for external transport at distances up to 25 km are not included in the estimates.
2. When performing certain types of surveys costing up to 5 thousand rubles. or the presence of unfavorable conditions for the passage of workers and the carriage of goods to hard-to-reach areas of research and back, the costs of external transport can be determined based on actual costs in prices of the current period.
3. Expenses for external transport in executive estimates may be determined in prices of the current period.
4. In the case of determining costs in the prices of the current period, the norms of Table 5 are not applied.
11. When carrying out surveys in especially difficult natural conditions (on the polar islands, in the glacier zone, in the alpine, desert, taiga and tundra regions), special events (attracting instructor-climbers and guides, organizing a rescue service, etc.) may be envisaged. additional costs, which are determined by the actual costs in the prices of the current period.
12. Determined by the actual costs (price lists, tariffs, invoices, etc.) in the prices of the current period and additionally taken into account in the cost of surveys costs associated with:
Obtaining (acquiring) initial data and information about natural conditions, aerial photography, cartographic and other materials from previous surveys;
Carrying out the necessary approvals related to the production of certain types of field work (location of mine workings, boreholes, points of experimental work, etc.);
The production of special types of analyzes and studies of soil and soil samples, bottom sediments, surface and ground waters of snow and ice, performed by specialized laboratories licensed to carry out such work (bacteriological analysis, complete tests of aggregates in concrete, radiochemistry of isotopes, etc.) ;
Payment of the cost of casing pipes, filter strings and other materials left in wells during drilling for water and for carrying out stationary observations;
Purchase of a logging ticket; compensation for material damage associated with deforestation during surveys;
Compensation to land users for material damage caused in connection with losses and surveys on their land plots;
Payment for the services of third-party organizations necessary for the production of surveys.
13. The costs of organizing and eliminating work at the facility are determined at the rate of 6% of the estimated cost of field survey work, taking into account the coefficients given in subparagraphs 8 a, b, c, d of the General Instructions, including the costs of inland transport, determined according to table 4 , (excluding the costs provided for in note 1 of table 4), as well as the costs of maintaining bases and radio stations, installation, dismantling and maintenance of prospecting equipment, determined according to tables 100 and 101.
Notes: 1. The following coefficients are applied to the amount of expenses for the organization and liquidation of works, determined in clause 13:
2.5 - for surveys with an estimated cost of up to 2 thousand rubles. or during surveys (regardless of their cost) carried out in the Far North and equivalent areas, as well as in sparsely populated (uninhabited) areas (high-mountainous, desert, taiga and tundra);
2.0 - for surveys with an estimated cost of more than 2 to 5 thousand rubles;
1.5 - the same, over 5 to 10 thousand rubles.
2. When performing field surveys at the facility continuously for more than one year, the coefficients given in Table 6 should be applied to the costs of organizing and eliminating works.
Table 6
14. When carrying out field work without paying workers travel allowances or field allowances, a coefficient of 0.85 should be applied to the prices for these works.
When performing office processing of survey materials and performing laboratory work in expeditionary conditions (with payment of field allowances or travel expenses), a coefficient of 1.15 is applied to the prices for these works.
15. If it is necessary to issue intermediate survey materials to the customer (if it is provided for by the terms of reference, the program), a coefficient of 1.1 is applied to the cost of these surveys (except for the costs specified in clauses 9-13).
16. When applied to prices (cost) of several coefficients established by the Directory, the latter are multiplied (except for the coefficients of subparagraphs "e" and "f" of paragraph 8).
17. The estimate attached to the contract provides for additional costs for work and services listed in clause 12 of the General Instructions, as well as unforeseen costs associated with plugging wells, construction of temporary buildings and structures (foundations for tents, crossings over ditches and ditches, installation of stairs on steep slopes, sheds, courtyard latrines, berths for boats and boats, etc.) in the amount of at least 10% of the estimated cost of survey work.
18. The prices of this Handbook are given to the average level of costs as of 01.01.91. Bringing the base cost of engineering surveys to the price level of the current period is carried out by applying the inflation index to this cost, which is determined in accordance with the established procedure.
19. The inflation index is not applied to expenses determined by actual expenses. Costs that are priced in the current period are included in a separate estimate.