Build a brick house with your own hands step by step instructions. We build a brick house with your own hands: Select the material, foundation, erect walls and roof
Greetings to your building blog! This article will tell in detail how high quality and graduate brick At home. When it comes to construction of brick houses, it is better not to rush in this matter, and initially consider all the stages and the main points of construction of the house. Go directly to business.
Planning the sizes of a brick house and choosing a place on the plot
Everything you need to start with the preparation of the plan. So before the construction of a brick house, a plan is made or a project of the house, as well as the place where the brick house will be built. The project of the house can be made up, just sit down and think: what sizes of the house you need, how many rooms and how they will be located, we are determined with windows where the sewage and boiler house will be located.
As for windows, most windows are preferably located on the sunny side.
The sewer is better planted in front of the house, not far from the road.
Boiler room I advise you to arrange from the front of the facade, and you are much easier and cheaper will pull gas or water to the house.
Place for a brick house, choose depending on the size of your land. If the plot is small, then plan, where your courtyard will be and household buildings, a place for parking a car, which will be the passage of machines to the courtyard and to the garden.
Alternatively, you can order a ready-made project of the house for money, in this case all questions are thoughtful for you, and you will save no time.
After planning, we turn to the markup and construction of the foundation of the house.
Construction of the foundation of a brick house
The foundation of the house plays an important role, since all the load will fall on it. If you do not plan a basement, you can choose a ribbon foundation.
During the construction of two or more floors, it is necessary to build capital partitions. For capital partitions, the foundation is also poured. Consider the thickness of future walls when choosing the sizes of the foundation. The foundation is poured on the depth of no freezing of the soil, in Russia it is 1.5 - 2 meters.
If you plan to build a one-storey house, you can save on the lungs of internal partitions from the bar and do without the foundation for them.
So, in accordance with the plan, we carry on the site markup of the walls of the house with the help of a lace. We take any metal rods or fittings and stick them along the corners of the walls. At the rod tie a rope or lace.
As a result, we obtain a visual marking of the future foundation. You can proceed to the ridge of trenches under the foundation.
When the trench is dug, take river or career sand and make a mound with a thickness of 2-3 cm throughout the foundation. This will serve as a depreciation pillow for the foundation of the house.
The next stage is the reinforcement of the foundation. We take into the hands of reinforcement and knitting wire and begin to build a frame of fittings around the perimeter of the foundation. Especially do not spare the reinforcement at the corners of the house.
Now we take a concrete mixer and prepare a concrete solution for filling the foundation. The concrete solution is made from the following proportion: Cement M500 - 1 bucket, sand - 2 buckets, crushed stone - 3 buckets.
Fill our foundation concrete. If there is no concrete mixer, or you lazy to mess around - you can order a ready-made concrete for money and you will fill the foundation for 1 day.
It will be good if you are after the fill compact concrete using a special vibrator. If it is not, you can stir concrete with ordinary revenues of reinforcement. It will fond from concrete Air bubbles foundation will be stronger and denser.
After waiting for the drying of concrete. Concrete gains strength throughout the year, in the first month it is stronger than 90%. Some people expect a year and then begin construction of walls. In general, you can build in a month, the other, if dry weather on the street.
Builds noted that the foundation of the house should be higher than the level of the Earth. To do this, formwork is made of boards, after concrete, it is filled with concrete. Either a silicate brick tocol is built.
Laying of brick walls
First of all, it is necessary to perform waterproofing of our foundation. For waterproofing, we take the ruler roll roll and spread it along the entire length of the foundation. On the corners of Ruberoid put the brass, at the intersection of two walls. Waterproofing foundation is ready.
In the construction of a brick house with their own hands, we approached directly, to the stage of masonry walls of bricks. In Russia, harsh climate and therefore, it is customary to build, brick houses with thickness in 2 long bricks. Less often lay walls in a half brick.
For masonry of brick walls, we will need the following tool:
Trowel without him anyway
Construction level, preferably not longer than half a meter,
Water or laser level, to check the level of corners and diagonals of the house,
Lace, serve as a height benchmark,
The hammer, ideally, is used when laying for a brick rack by tapping; also to break the bricks you need the length,
Plumb, additional control of the vertical level of walls and corners,
Brick extension, used when cladding external bricks,
Concrete mixer and buckets for the preparation of cement mortar.
These tools were enough for laying a brick house.
It is worth mentioning the quality of the solution. The solution is mixed in proportion 1: 3 with cement M500 or 1: 4 if the cement M400 brand. There is one construction trick when the solution is kneading, I will now share with you - add a few drops of shampoo or detergent into the solution. As a result, the solution will be more elastic and will not lose quickly. Yes, and the laying will go faster pace.
When laying bricks, many beginner builders arise the following problems:
Slots and lumen in the walls, due to improper laying of bricks per solution,
Uneven rows of bricks, and later the walls themselves.
This can be avoided by following our rules when laying bricks.
We start laying walls from the corners of the house. The solution is placed on the bricks of the first row on each corner, set them along the hydraulic or laser level.
Then, we take a lace and stretch it from the corner to the corner of the house at the top of the brick. With the help of a lace, we will have a perfect laid out, a flat row of bricks.
In the process of laying bricks, we adjust it with a hammer and check the usual level. The solution is put up with a margin so that there is no emptiness, excess the solution weaken the trowel. Usually make the thickness of the seam between bricks 1 - 1.2 cm.
If brick walls will not shift with the outside, better using the bunch. The extending is taken and is carried out on the suture of the solution. It is necessary to make the extender at once, in the process of masonry brick, otherwise it will be late when dried solid.
There are different types of ducts:
Convex, seam acts outward
Concave, seam deepened in the wall; Saama Common branch type,
Patterned, various patterns on the seam.
Having paved the first row of bricks, the second and the next rows are laid out, starting with the corners. At the same time, constantly check the level of the wall per vertical and horizontal. Having reached the height of the windowsides - we leave a place under the windows.
When you reach the top of the windows, we insert the window jumpers. Window jumpers come:
Metal, made of metal corners,
Concrete, formwork is made and poured concrete with the use of reinforcement,
Wooden, use a piece of wooden bars or beam.
The most reliable will be concrete jumpers.
Complete the masonry of the walls of a brick house. The last row of bricks should be especially carefully postponed, since the beauty of your roof will depend on it.
Construction of a roof of a brick house with their own hands
The construction of any roof begins with waterproofing walls at home. Use the usual rubberoid, which is laid on the walls.
We are determined with the type of our roof, it can be:
Single,
Double
Quad
Loars roof, in the form of attic.
The most common roof view is a double roof.
Now the beams are stacked on Murlat. The distance between the beams is making 70-90 cm. All beams fix on purrity with nails and self-drawing, using metal corners 100 * 100 mm.
The charter system from Braz 50 * 150 mm is attached to the beams. Start setting rafters from the frontones. Then the lace is tied between them and the remaining rafters are exposed.
The corner of the roof row is 45º. We release the roof frame further walls by 30-40 cm so that the precipitate does not flip on the walls of the house.
Waterproofing is spread and fastened with braces with a construction stapler. Ensure the waterproofing horizontally, moving up the ranks from the bottom up.
The finished frame of the roof is crucified with a cutter from the boards with a thickness of 25mm. The boards are nailed, 80-90mm long.
You can cover the roof with the following roofing materials:
Ondulin,
Soft roof,
Metal and metal tile.
The last option is most practical. Crook the roof of metal sheets from the bottom up. Sheets are screwed to the screwdriver and roofing self-pressing, with a compacted elastic band, which will avoid moisture flowing. For 1 meter, the square metal profile takes 8-10 screws.
At the recent stage of the construction of the roof, a horse is screwed. The horse is screwed by self-drawing to the vertices of metal sheets. I advise you to use the horse wider, they can be perfectly played on irregularities.
Fronttones are sewn by conventional boards, or laid bricks. Strong-covered fronton, in the future we are cutting with metallic siding.
At the very end of the roof building, screw the wind corners from the frontal side. Roof is ready.
As a result, we got a wonderful brick house.
We looked at all stages of construction of brick houses. After reading all this, you will be easier to build a brick house with your own hands.
Despite the diversity of building materials (and today foam block, slagoblock, aerated concrete, skew houses, etc.) are available on the market today, and brick remains the most common solution for construction. It is durable and relatively cheap, has excellent thermal insulation properties and looks great with any designer ideas. In addition, it is universal and from it you can do both one-storey and multi-storey house, to add a veranda, porch or other designs.
However, in order for your home to be reliable and durable, it is necessary to build it correctly. First of all, the project is being developed, which indicates the scheme of the building, from which stone it will be erected, the calculation of the material and other nuances. Sewing drawings you can on our website. Today we will talk about how to build a brick house with your own hands, and what features need to be considered.
Foundation
For any design, you need a good basis. For a brick house, in-depth tape foundations are used, since they are able to withstand heavy designs, and they are relatively inexpensive. The designs of this kind are divided into three categories, in
particular:
- Monolith. It is used in places where there is a risk of uneven shrinkage of the building. It is solid and acts as a single design, which avoids the strain of the walls.
- Made. Not so durable as monolithic, but it is cheaper and is much easier to shut up.
- Mixed. The hybrid between the two options described above.
Walls
For the construction of the walls you will need a special solution. It is divided into three types:
- Three-component. Classic, consisting of sand, water and cement.
- Lime. The same thing, but plus lime.
- Plasticizer. It is harder, but is considered more reliable for bricks.
Before starting work, experts advise to decompose the brick stack around the perimeter of future construction, so as not to run constantly behind the stone in one particular place. For a couple up until the start of work, the stone should be cooled well. In addition, decide on the angular points and directions of the walls, which will help you with the roulette and thread.
The laying begins always from the corner, gradually moving along the length of the future wall. You can make two rows of stone, paving the heat insulating layer between them. In order for the solution evenly distributed, you need to lay a new stone on the solution and smoothly customize it to standing nearby. So that the material lightened better, it should be knocked out the Kelma handle. Consider some rules that you definitely need to know when independent work:
- red brick is laid in the lower rows, and not silicate. It is used for premises with high humidity and chimneys;
- it will take to carry out wall reinforcement to increase their strength;
- during the laying, it is not necessary to scorch the seams with cement mortar completely, because it will make it difficult for the finish;
- it is necessary to carefully monitor the level of masonry.
In addition, it is necessary to ensure that the insulation must necessarily remain dry. If you take a break in work, hide it or just cover it. Just a few simple and understandable rules will help you make masonry fast but high quality.
Overlapping
The overlap is a layer separating one floor from the other, as well as the main residential part of caiden. They also make a number of requirements that you need to know:
- must be durable and withstand any load;
- be rigid, do not fade over time;
- we are obliged to meet the requirements of thermal protection, since during the cold season the temperature in the room and outside the floors is very different.
If you build a one-storey house, you need to ensure that the overlap responds to the requirements of thermal protection. This is a primary task. With multi-storey houses harder, requirements for load there above.
Roof
The roof should reliably protect your home from bad weather. Elevated strength requirements are presented to it, it must withstand not only the power of the hurricane wind, but the mass of snow lobes. If you build a one-storey house, you will fit the pitched roof with a particular bias. For residential premises, double or four-piece roofs are used, for the household buildings there is enough single one.
Build your own home - quite real task. However, you need to get ready for tremendous time and money. At the same time, if you are ready to start your construction, photos and videos, posted on our website, will help you achieve excellent results. Perform all actions according to the instructions, and your home will never let you down.
As you know, every man should make three things in his life. One of them is to build a house. This is a very responsible step that requires certain knowledge and skills. To realize your dream, you need to consider where to start work that you need to buy and what stages of construction should be overcome. Despite the fact that today there are new technologies and building materials, a brick is often chosen as a material for the house. And this is not surprising, as it has a number of benefits, such as environmental friendliness, acceptable thermal insulation properties, refractory, durability, reliability and excellent appearance.
In this article, we will tell you how to build a brick house with your own hands, demonstrate drawings, photos and video instructions. Even if you do not have experience working on brickwork, you can easily implement this task.
What you need to know before construction
Design
Before starting the construction of the house, you need to do some preparatory work. It is noteworthy that just buy a plot and start building there the house you will not work. More precisely, you can do so, but such construction will be illegal.
To begin with, you need to get permission to build at the district administration. To do this, you need to assemble the necessary package of documents: a statement of building, copies of ownership, purchase and sale, passports and other documents. Among them there must be drawings of the future building, and coordination with various services. After consideration of your application, you will be provided for construction permission. This can be done after the end of construction work through the court, but still in order to avoid problems, it is better to take care of this in advance.
The preparation includes and choosing a place, planning, procurement of materials. It is also important to determine the type of foundation, the choice of brick, the method of laying and roofing material. If you prepare everything in advance and think over, then all work will pass easier and faster.
It is important to decide what you can do from the work independently, and what to trust the specialists.
After everything is done, you can proceed to construction. All work can be divided into such steps:
So, let's look in detail how to build your own brick house.
Preparation of tools and materials
Tool
Build a house is a simple, but requiring some effort, skills and planning. But even having it all, without the right tools and materials, it is impossible to imagine the construction. Therefore, for such works, you will need such tools:
- building level;
- level;
- building hammer;
- kelma, trowel;
- bulgarian;
- exercise;
- plumb;
- construction cord;
- shovel;
- concrete mixer.
Sand for masonry mortar
If we talk about materials, then you need to purchase the following:
- brick;
- cement;
- lime;
- sand;
- plasticizer or liquid soap;
- armature;
- plywood or boards;
- insulation (slag, mineral wool, foam, ceramzit);
- hydroizol or rubberoid.
All this can be purchased at any construction store.
What brick choose
Brick
Since in building stores you can find different types of bricks, you should decide which brick to build a house. The most popular and leading options are red clay and silicate bricks. When laying them can be used separately, as well as combine each other. As experts advise, when laying in the middle, you can add insulation. Since such bricks are rather heavy, the load on the foundation will be appropriate. To reduce it, you can use bricks with cells. This is a lightweight option of ordinary brick, which weighs 20% less than usual.
So that the masonry turned out to be smooth, beautiful and reliable, do not buy a brick that has already been used. Your material must be a whole, correct shape and without cracks.
After all the necessary tools and materials are prepared, you can proceed to the next step - planning.
Second Stage - House Planning
Planning at home
As you know, it is impossible to build something, after not planning everything. Therefore, it is important to decide for what the construction will be used for. If this is a small country house, stay in which you are planning in a warm period, then you can build it in Polkirpich. If accommodation is non-permanent, but at any time of the year, then the walls can be put in one brick. In this case, the construction will even endure several floors. Well, when you plan to build a house for permanent residence in it, the thickness of the walls of this house is recommended in a half brick.
Gypsum Monks
If you decide to build a one-storey house, the foundation device can be simplified. In this case, the simplicity of the house will be made of plasterboard. Under them to make the strengthening will not need. But when partitions are built of bricks, the foundation will look different. Since the future building will be made of brick, which has a high density and, accordingly, gives a greater load on the foundation, the basis for your home should be sufficiently strong. The most reliable is a belt foundation, the design of which exactly repeats all lines of walls and partitions of the building. Then you need to fill the foundation for each wall and partition. In this case, the entire load from the walls is distributed over the entire area of \u200b\u200bthe soil, in connection with which the building stability increases.
Marking of the future plot
In order for your construction to be the right location, and during the construction process it was possible to avoid unnecessary problems, you need to make a markup on the soil corresponding to the plan of your home. Drove the pegs to the ground in places where the corners of your building are, as well as in places where the simpleness will be erected. It must be a real size. After that, take the rope or a thick rope and pull it on all pegs. Thus, you have made a landmark that will help you pull the trench for the future foundation. Check the horizontal of the stretched rope can be regular.
After everything is done, it remains to take shovels and pull out the trench by your landmarks. To do this, you can ask for helping your friends, relatives or neighbors, as it all will be very hard. Moreover, when there are several floors in the house, the depth of the trench can be up to 2 m.
Formwork for foundation
Foundation Trench Formwork
Based on the technology, the foundation must be arranged above the level of the earth for 10-15 cm is the minimum indicator. In the regions with harsh winters, the base can be even 40-50 cm. To perform it, you need to install formwork on the edge of the trench. It can be from plywood or ordinary boards.
In the event that the surface of the area is uneven, you need to find the highest point and repel from it.
So that the foundation has been made in the same plane, the formwork needs to be brought to the height of the stretched rope and make backups. It is important to remember that the higher the formwork will be, the more and you need to install the backups closer. If this is not done, the mass of concrete can crush the entire design, and it will dissolve or will be uneven.
So that the formwork reliably kept concrete, it needs to be made durable: without holes, lumen, since the concrete can lean through them. Often, for formwork uses a stranded board or paneur, but you can choose another material on hand.
Pillow under belt foundation
Before you begin the fill of the foundation, it is important to make a pillow at the bottom of the trench, falling asleep into it a small crushed stone, stones or sand to the depth of no more than 5 cm, after which it must be tamped. If you do not have a vibroplitis or a tamping rink, you can use a homemade device. To do this, take a wooden timber, with a cross section of 150 × 150 mm from a handle convenient for you and adhere to the pens. Applying gross power, see the entire trench. Thanks to such a pillow, the building shrinkage will be much smaller, and the building itself is more stable.
After that, the reinforcement frame is stacked along the entire length of the foundation. To assemble it yourself, you will need:
- armature Ø10-17 mm;
- armature Ø5-8 mm;
- thin wire for knitting;
- bulgarian;
- nippers;
- pliers.
Calculate how many fittings you need, you need to in advance. It is important to take into account the data on the soil and the number of floors of your future at home. It can be said for sure that if you build a three-storey house on a loose ground, then everything will be maximum - both the depth of the foundation and the diameter of the reinforcement. To make an accurate calculation, you need a whole topic where all the subtleties and nuances are taken into account, so it is better to use the calculator.
Pouring foundation
It is important to know that the foundation may be monolithic and national team. The monolithic foundation is done immediately on the spot. For this, a concrete solution is mixed, which is poured into the prepared trench. The national foundation consists of ready-made slabs that are stacked in the ground. For a brick house, a monolithic foundation is much better suited, which is able to withstand huge loads. Even if you build several floors at home, basement and garage, the design will be secure. The only disadvantage of the monolithic belt foundation is that it is not recommended to use it with soft soil. The best option will be the pile base.
So, it's time to fill the foundation of your home. To ensure the strength of the base of the house, the fill must be carried out with horizontal stripes in one reception. If you pour it partially or make individual vertical sites, that is, it is highly likely that these places of connection can crack. Therefore, everything needs to be done quickly and no extra help. Ask for you a friend or relative, as additional hands in this matter are simply necessary.
We knead concrete
First of all, you need to knead the concrete. This is a time-consuming process at which it is necessary to make concrete, to transport or carry it into place where the fill occurs. To pour the foundation, you will need a lot of concrete. If your trench depth is more than 60 cm, then after you poured the first layer of concrete, sketch the butt stones and continue the process.
After you finish pouring the formwork, you need to compact concrete, unruiling air from it. For this purpose, a deep vibrator will fit well. But since it is not for everyone, it can be, using a thick stick, seal concrete up-down movements. After such manipulations, the concrete surface must be aligned with a trowel. Basically, concrete will dry out for 5-7 days. But it is necessary to start brickwork only after a month when concrete will type strength and will not be supple.
Waterproofing work
Waterproofing foundation
An important stage in front of the masonry wall is the waterproofing of the foundation, due to which the moisture from it will not penetrate the house or basement, and the brick will not collapse. Thus, you will prolong the exploration term of the house and keep yourself from the formation of fungi and dampness.
Such work can be performed after finding the foundation. Everything is done quite easily, the main thing is the presence of waterproofing material (hydroize or rubberoid). It must be put or glued to the foundation in 2-3 layers. After the construction is completed, all extra pieces that will perform should be trimmed. The base of the building should be deceived by molten bitumen.
Loan for Masonry - Solution
Solution
After a month, you can proceed to work on the construction of a brick box of the building. First you need to make a solution, thanks to which the entire design will be securely kept. The main type of solution is cement-limestone, limestone or cement. The basis or base for any of them serves as a sacred sand (better if it is river). To find out how to make a solution and in what the ratio take the components, it is enough to look at the packaging where everything is indicated. The most common proportions of sand with cement or lime 3: 1 or 4: 1. In this case, the future masonry will be very durable, and it will not be difficult to do it, since the solution will be inelastic.
To find the highest quality ratio of materials in the composition, you need to check them in action, because there is a poor-quality cement. You need to make several compositions with different proportions, for example, 3: 1, 4: 1 and 5: 1. The composition is not necessary much - it will only be necessary to make small balls from them. Wait for everything they dry, and then hit the hammer. Pay attention to that ball, which, when hit, split, and did not crumble - this ratio of components, as for the manufacture of this ball, and you need to choose.
Erecting brick walls
Highlights of masonry of brick walls
After the solution is ready, you can start brickwork. It is necessary to start with the removal of corners. The first bricks need to be preparing especially carefully and carefully, since further masonry depends on them and the general view of the future building.
Initially, it may seem that such a job is simple, brick to brick and everything is ready. But inexperienced bricklayers are very hard to make the walls perfectly smooth and geometrically correct. To do everything right, you need to try and gain patience. Such work is long and tedious, but you will acquire a practice that will help you further. What do you need to do?
To provide high-quality laying, you need to check the position of each brick.
Need to check the position of each brick
On this frame of your future house is ready. It remains only to make a roof. Alone, all work is difficult to implement. Therefore, ask the help of professionals who provide you with a reliable roof above your head.
Now you can be proud of yourself, as they were independently able to realize the dream of every person. As you can see, build a house yourself is difficult, but perhaps. Therefore, if you are in the plans to make a comfortable home for yourself and your family, buying the material and proceed to work!
Brick houses turnkey – the case when expensive means high quality. Choosing a typical or ordering an individual project of such a house, you can safely represent how your future generations will run on it.
Proof of brick strength - time and buildings that are not subject to him. However, reliability and durability are directly related to the organization of work and the quality of the material itself.
Construction of brick houses in Moscow and Moscow region
Brick - proven material, but really high-quality construction of houses made of brickspower is a clear observance of the technological process. Therefore, it is important to prefer cooperation with a proven design and construction organization, which knows how rationally and efficiently use this material.
It is reasonable to give preference to bricks when there is a choice of lighter, cheap and easy in laying materials. We say yes, and that is why:
- Availability.
In whatever part of Russia, you will build a house nearby, nearby will be a brick factory or a reliable supplier of this material.
- Reliability.
This is the first association, which arises when mentioning this material, but it is worth reminding that it is also not necessary to worry about fire, the destruction of walls insects, rodents or moisture.
- Reasonable savings.
Slip on profitable investment is wrong. Make a profitable investment so that it is subsequently not to carry out the cost of operation, depreciation and care, not to overpay into the heating season - an excellent solution!
- Implementation of ideas.
Do you dream about the house of an unusual form, want to live in a baroque mansion, Renaissance or, for example, eclecticism? Choose construction of brick houses , this material is most convenient for creating complex architectural solutions.
- Ecology.
"My home is my fortress" ... and it should not bear the danger of residents or the environment. Brick as nothing else is suitable for those who put ecology and health not at the last place.
By ordering a brick house in Moscow and the Moscow region, you get a comfortable, sustainable structure that will meet your status and requirements. Due to the high thermal insulation properties in winter, households will be warm and cozy, in the summer - cool and fresh.
Own house, country cottage or cottage - investment in the future, so it is important to choose with the mind. There are two tasks before future homeowners, without solving which the embodiment of conceived in life is impossible.The first is the choice of material. He must meet such requirements:
- environmental Safety
- availability on the market
- profitability at cost
- durability, durability,
- ability to provide a favorable microclimate indoor
For many decades, this building material has been a classic brick. Brick houses are comfortable, comfortable and beautiful look.
The second task is to choose: buy a brick house, built turnkey, or on your own erection. In the second case, it will be necessary to find a construction company that will be able to embody the Customer's intentions to life with the guaranteed high quality of execution and at reasonable value. It is extremely desirable that such a company performs both the development of projects and the implementation of construction and installation, finishing works.
It is from how seriously these tasks were solved, the following parameters depend on:
The total cost of construction.
As far as the built house will answer the wishes of its owner, both in its maintenance and the quality of work performed.
How often do repair (cosmetic, capital).
Guaranteed the durability of the structure.
How comfortable in it will be accommodated, what will be the level of a favorable microclimate.
It should be accepted that the construction of houses from the brick "turnkey" prices for the news of the basic and related activities are significantly lower than in the case when they are performed by different contractors.
Causes to buy a brick house "turnkey" in the company "Mera-Stroy"
Ceramic brick of more than 4 thousand years. Around the world there are many buildings and structures from the brick, built hundreds of years ago, which in our days regularly perform their functions.
Even today, when a multitude of new building materials is developed and launched into mass production, a red ceramic brick remains a leader in building buildings, residential and non-residential structures.
The reasons for which brick houses (projects and prices range to vary in the widest range) are so popular due to the following advantages:
High strength indicators reaching 300 kg / cm². Therefore, brick structures are perfectly withstanding considerable loads that are compressed.
Fire safety: Brick does not burn, it does not melt, does not support burning.
The material is not afraid of multiple "freezing / thawing" cycles, sharp temperature differences.
Energy-saving properties, heat capacity 0.92 kJ.
Due to the density up to 1500 kg / m³, the brick has good sound insulation properties.
Durability. Objects built from ceramic bricks can be operated for more than 100 years.
Universality. Bricks are used to masonry bearing walls, minor partitions, even the foundation devices.
It is aesthetically externally attractive material.
Accommodation in such a house, warm, quiet, with a favorable microclimate, is a pleasure. Especially when professionals were built. Only in the skillful and experienced hands of our masters, red brick can fully reveal the "golden" qualities inherent in it.
Features of the work of the company "Mera-Stroy"
Turning to our company to order a brick house, you get the opportunity to realize excellent design projects and prices are most beneficial in our region. Working with the customer, our team adheres to the following principles:
Personal work with each client.
Careful measurement, study of the place of construction.
Design is conducted taking into account the wishes of the customer and its financial capabilities.
A scrupulous approach to the calculation of the materials required for the construction, therefore such phenomena as an overrun or lack of building materials are completely excluded.
Reasonable pricing policy.
Over the years of its activities, the staff of Mera-Stroy has developed and successfully uses an effective work plan:
Preliminary stage - topographic survey, geological surveys at the place of future construction.
Rational accommodation in terms of houses of all technical premises so that they are not only convenient for use, but also fully responded to sanitary and hygienic standards, safety standards.
The schemes of all engineering communications are drawn up so that the design interior of the premises and the exterior of the building itself is not disturbed, but there was free access to them.
Bearing structures, the main elements are developed with a certain margin of strength and possible improvements in the future.
We carry out the choice of materials, considering the wishes of the client, other features of the project, as well as actual climatic features.
According to the customer, the project sketch is performed by the model of the house in the 3D format for the purpose of visualization. A peculiar visualized tour of the house is carried out, it allows you to make any adjustments from the future homeowner at the design stage.
The customer receives the entire package of design and estimate documentation in his hands, in which, in addition to the drawings, there is an estimate, the specification of materials, transport and overhead, explanatory note and much more.
Team of the measure-system Reputation of a reliable contractor, which deservedly earned with the help of such its qualities:
Performance of work in terms, agreed by the contract.
Works are performed in full compliance with the approved project.
Absolutely excluded any deviations from existing construction norms, security requirements, other legislation.
For many years we are successfully working in the construction market of Moscow and Moscow region. Among the services: house brick houses, typical and author's projects of country houses, cottages, cottages, other low-rise buildings of the most different level of complexity and creativity. Our prices are available available.
Warranty - 15 years on building materials and structures made of them.
If our offer is interested, we are always happy to provide more detailed advice! To communicate, you can use the contact phone number, order a callback, or leave a request on our official website by filling out the appropriate form.